Sie sind auf Seite 1von 1

GENERAL LEGEND

PLANNING
APPLICATION
BOUNDARY

PREFERRED 220 KV ALTERNATIVE 220 KV


DOUBLE CIRCUIT ROUTE DOUBLE CIRCUIT ROUTE
CORRIDOR CORRIDOR

EXISTING MAJOR EXISTING MINOR


CONTOUR CONTOUR
DECLAN CUNNINGHAM 2004

EXISTING EXISTING
SPOT LEVEL TREES

SUBSTATION LEGEND

PROPOSED PROPOSED
SURFACED AREA BUNDED AREA

PROPOSED PROPOSED
BUILDING ROOF CRUSHED ROCK
AREA

PROPOSED PROPOSED
SUBSTATION SECURITY FENCE
EQUIPMENT

PROPOSED PROPOSED
PROPOSED FULL RETENTION OIL FOOTPATH LANDSCAPING
INTERCEPTOR (NSFP 15)
PROPOSED LP PROPOSED FFL:
LIGHTING POLE LEVELS
DISCHARGE FROM BUNDS VIA
MONITORED PUMP SYSTEM DRAINAGE LEGEND

PROPOSED SURFACE PROPOSED SURFACE


WATER DRAINAGE WATER MANHOLE
SW SW SW SW SW SW SW SW SW SW

SW5.0 SW4.0
SW3.0
PROPOSED FOUL PROPOSED FOUL

LP
WATER DRAINAGE WATER MANHOLE
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW

LP
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW

SW
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW

SW

LP
SW
FFL: 72.75 PROPOSED PROPOSED

SW
SW
WATERMAIN WATERMAIN VALVES

SW

SW
SW
SW4.1 FFL: 72.75

SW

SW
SW

SW

SW
PROPOSED SW

SW
SW SW SW SW SW SW SW SW SW
SW
SW

SW

SW
SW SW

SW
SW
SW

SW

SW INTERCEPTOR DRAIN

SW

SW
SW
SW
SW SW SW SW SW SW SW SW SW SW

FH3.1.1

SW

SW
SW
C.L.72.75

SW
SW

SW
NOTES:

SW
SW
I.L.71.25

SW
SW

SW
SW

SW

SW

SW
SW
SW

1. FIGURED DIMENSIONS ONLY TO BE TAKEN FROM THIS

SW
SW

SW

SW

SW
SW
SW

DRAWING.

SW
SW

SW

SW
FH3.3

SW
SW
2. ALL DRAWINGS TO BE CHECKED BY THE

SW
SW

C.L.72.75

SW

SW
SW

SW
SW
CONTRACTOR ON SITE.

SW
SW

SW
I.L.71.4

SW

SW
SW

3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS

SW
SW
SW

SW
SW
SW

SW

SW
APPROPRIATE, TO BE INFORMED BY THE

SW
SW
SW SW SW

SW
SW
SW

SW

SW
CONTRACTOR OF ANY DISCREPANCIES BEFORE

SW
SW
SW

SW
SW
ANY WORK COMMENCES.

SW

SW

SW
SW

SW
SW
4. THE CONTRACTOR SHALL UNDERTAKE A THOROUGH

SW

SW
SW

SW
SW

110kV GIS BUILDING

SW
SW

SW
CHECK FOR THE ACTUAL LOCATION OF ALL

220kV GIS BUILDING


SW

SW
SW

SW
SW

SW
SW

SERVICES/UTILITIES, ABOVE AND BELOW GROUND,

SW
SW6.0

SW

SW

SW
SW

SW
BEFORE ANY WORK COMMENCES.

SW

SW

SW

SW
SW
5. ALL LEVELS SHOWN RELATE TO ORDNANCE SURVEY

SW

SW

SW

SW
DATUM AT MALIN HEAD.

SW
SW

SW

SW
FFL: 72.75

SW
SW
SW

SW

SW

SW
SW

PROPOSED BYPASS OIL

SW
SW9.0

SW
SW SW
SW

SW
SW

SW
10m 0 10m 20m 30m

SW
SW

SW
INTERCEPTOR (NSBP024) &

SW
SW
SW

SW

SW

SW
FLOW CONTROL DEVICE

SW
SW
SW

SW

SW
SW2.0

SW
SW
SW
SW

SW

SW
SW

SW
SW1.0

SW
SW
SW
SW

SW
SW

SW
SW
SW

SW

SW

SW
SW
SW
SW

SW
SW

SW
SW
SW

SW

SW
SW

SW

SW
SW
SW

SW
SW
SW

SW
SW
SW

A Dec. '15 PLANNING ISSUE MN DC

SW

SW

SW
SW

SW
SW

SW

SW
SW

SW
SW

SW

SW
SW
SW

SW
SW

SW
SW

Description By

SW
Rev Date Chkd.

SW

SW
SW
SW

SW SW
SW

SW
SW
SW

SW
SW

SW

SW

SW
SW SW
SW
SW

SW

SW4.2 SW
SW

SW
SW

SW
SW

SW

SW

SW
SW
SW

SW
SW
SW

SW

SW

SW

SW
SW
SW
SW

SW

SW

PROPOSED OUTFALL TO WATER

SW
SW SW SW SW SW SW SW SW SW

SW

SW

SW
SW
SW

SW
SW

SW

COURSE LIMITED TO GREEN FIELD

SW
Client:
SW

SW
SW

SW

SW
SW
SW

SW
SW

SW SW

SW
RUN OFF RATES
SW
SW

SW

SW
SW
SW
SW
SW

SW
SW

SW
SW SW

SW

SW
SW
SW

SW
SW

SW

SW SW

SW
SW

SW

SW
SW

SW
SW

SW

FFL: 72.75
SW

SW

SW
SW
SW

SW

SW

SW
SW
SW
SW

SW
SW
SW

SW
SW SW SW

FH3.1
SW SW SW
SW

SW SW SW SW SW

SW
SW

SW
SW SW

SW
SW SW
SW

SW SW SW
SW

SW SW

C.L.72.75 FH3.0
SW

SW

SW
SW
SW

FH3.2
SW

I.L.70.07 C.L.73.00
SW

SW
C.L.72.75

SW
SW
SW
LP
SW

US I.L.69.46 Project:
SW

SW SW SW SW

SW8.0
SW SW SW

I.L.70.74
SW SW SW SW SW

SW
SW SW

SW
SW SW

SW
SW

DS I.L.68.02
SW

SW SW SW
SW

LP
SW SW SW SW SW SW SW SW SW SW SW
LP
SW

SW

SW

LP
SW SW SW SW SW SW SW SW

SW
SW

SW
SW SW SW SW SW SW SW SW
SW

SW SW SW SW SW SW SW

SW7.0
SW SW SW SW SW SW SW SW SW SW
SW

SW SW
SW

SW SW SW
SW

SW SW SW SW SW SW SW SW SW

HEADWALL INCORPORATING

SW
SW

SW SW SW SW SW

WEST DUBLIN

SW
SW SW SW SW SW SW SW
SW

SW
SW

TIDEFLEX OR SIMILAR NON


SW SW SW SW SW
SW

SW SW

SW8.1
SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW
SW

220 / 110 kV SUBSTATION


SW SW

SW
SW SW SW

RETURN VALVE AT OUTFALL


SW
SW

SW7.1
SW

SW

& ASSOCIATED WORKS


SW

SW
SW

SW
SW

PROPOSED CONNECTION
SW
SW

Title:
SW

TO EXISTING FOUL SEWER


SW

SW
SW

SW
SW

SW

SUBSTATION COMPOUND
SW

SW

DRAINAGE & UTILITIES LAYOUT


SW

SW
SW

SW
SW

SW
SW

SW
SW

SW

PROPOSED ACCESS ROAD DRAINAGE


SW

SW

SURFACE WATER INFILTRATION DRAIN


1:500
SW

Scale @ A1:
SW

(Refer to Drg. No. 7568-2142 for details)


SW

SW

Prepared by: Checked: Date:


SW

SW

M. Nolan D. Conneran October 2015


SW

SW
SW

SW
SW

Project Director: D. Grehan


SW
SW

SW

Drawing Status:
SW

PROPOSED WATERMAIN Planning


SW
SW

SW

(Refer to Drg. No. 7568-2143 for details)


SW

SW
SW

SW

SW

SW
SW

SW
SW

NOTE:
SW

Patrick J. Tobin & Co. Ltd.


LANDSCAPING AREA SHOWN FOR INDICATIVE
SW

PURPOSES FOR DETAILED LANSCAPE MASTERPLAN TOBIN Consulting Engineers, AECOM,


SW

Block 10-4, Blanchardstown 4th Floor,


SW

REFER TO DRG. NO:7568-2110


SW

SW
Corporate Park, Dublin 15, Adelphi Plaza,
Ireland. George's Street Upper,
tel: +353-(0)1-8030406 Dun Laoghaire,
fax:+353-(0)1-8030409 Ireland.
e-mail: dublin@tobin.ie T +353 (0) 1 238 3100
www.tobin.ie www.aecom.com

Revision:

Drawing No.: 7568-2108 A

Das könnte Ihnen auch gefallen