Beruflich Dokumente
Kultur Dokumente
POWER FORMULA
VOLTAGE IN VOLTS
POWER (RECEIVING SIDE) IN KW
POWER CABLE SIZE FROM SENDING SIDE TO RECEIVING SIDE
CONSIDER POWER FACTOR COS =
Sin =
DISTANCE BETWEEN SENDING & RECEIVING SIDE IN METRES (L)
3
FIND THE AMPERE RATINGS OF THIS THREE PHASE POWER
K=
R=
X=
n=
Let K=
n=
K* I=
(R COS + X SIN )=
Length (L)=
Vd=
% Vd=
% Vd=
P = 3 V I COS
415 VOLT
371 KW
CU/XLPE/SWA/PVC + CU/PVC/ECC
0.8
0.6
15 m
0.015 KM
1.732
I = P (3 V COS )
645.19 AMPERES
POWER FORMULA
VOLTAGE IN VOLTS
POWER (RECEIVING SIDE) IN KW
POWER CABLE SIZE FROM SENDING SIDE TO RECEIVING SIDE
CONSIDER POWER FACTOR COS =
Sin =
DISTANCE BETWEEN SENDING & RECEIVING SIDE IN METRES (L)
K=
R=
X=
n=
Let K=
n=
K* I=
(R COS + X SIN )=
Length (L)=
Vd=
% Vd=
% Vd=
P = V I COS
230 VOLT
2.5 KW
CU/XLPE/SWA/PVC + CU/PVC/ECC SIZE OF FOUR CORE CABLE
0.85 AC resistance of cond @ 90 deg C (/km) R
0.5267826876 Reactance @ 50 Hz X
90 m
0.09 KM
6 10 16
3.93 2.33 1.47
0.089 0.084 0.081
Electrical details:
Electrical load of 80KW, distance between source and load is 200 meters, system voltage 415V three phase, power factor is 0.8, permissible voltage dro
Cable laying detail:
Cable is directed buried in ground in trench at the depth of 1 meter. Ground temperature is approximate 35 Deg. Number of cable per trench is 1. Numb
Lets select 3.5 core 70 Sq.mm cable for single run., short circuit capacity = 6.6 KA.
Current capacity of 70 Sq.mm cable is: 170 Amp,
Resistance = 0.57 /Km and
Reactance = 0.077 mho/Km
PVC XLPE/EPR
10 1.22 1.15
15 1.17 1.12
20 1.12 1.08
25 1.06 1.04
35 0.94 0.96
40 0.87 0.91
45 0.79 0.87
50 0.71 0.82
55 0.61 0.76
60 0.5 0.71
65 0 0.65
70 0 0.58
75 0 0.5
80 0 0.41
Thermal Resistance Correction Factor (K4) for Soil (When Thermal Resistance of Soil is known)
Soil Thermal Resistivity: 2.5 KM/W
Resistivity K3
1 1.18
1.5 1.1
2 1.05
2.5 1
3 0.96
Soil Correction Factor (K4) of Soil (When Thermal Resistance of Soil is not known)
Nature of Soil K3
Very Wet Soil 1.21
Wet Soil 1.13
Damp Soil 1.05
Dry Soil 1
Very Dry Soil 0.86
Cable is directed buried in ground in trench at the depth of 1 meter. Ground temperature is approximate 35 Deg. Nu
e is approximate 35 Deg. Number of cable per trench is 1. Number of run of cable is 1 run.
Selection of Cable
For selection of proper cable following conditions should be satisfied:
1. Cable derating amp should be higher than full load current of load.
2. Cable voltage drop should be less than defined voltage drop.
3. No. of cable runs (Full load current / Cable derating current).
4. Cable short circuit capacity should be higher than system short circuit capacity at that point.
Note : Requirement
Electrical details:
Electrical load of 80KW, distance between source and load is 200 meters, system voltage 415V three phase, power
Cable laying detail:
Cable is directed buried in ground in trench at the depth of 1 meter. Ground temperature is approximate 35 Deg. Nu
proximate 35 Deg. Number of cable per trench is 1. Number of run of cable is 1 run.
139.1 AMPERES
0.9345
5.8%
4.3% less than 5%
158.87 AMPERES
186.90 AMPERES
6.60 KA
8.90 KA
Method-2
Total Connected Load in KW
Non Corrected Power Factor COS =
Initial Power Factor COS =
Present KVA=
Present KVAr=
Present KVAr=
Desired Power Factor COS=
New KVA=
New KVA=
New KVAr=
New KVAr=
415.7 KW
0.6
0.6
0.80
1.33
0.95
0.31
0.33
(TAN(COS) - TAN(COS)) X
Total Connected Load (KW)
417.63 KVAr
400 KVAr
0.96
0.37
0.37
0.938
415.7 KW
0.6
0.6
692.83 KVA
(Required KVA)2- (KW)2 KVAr
554.267 KVAr
0.95
(Initial Power Factor COS/Desired KVA
Power Factor COS) X Present KVA
437.58 KVA
(Required KVA)2- (KW)2
136.634 KVAr
417.63 KVAr
Initial Condition with Non Corrected Power Factor
Power Formula
Voltage in Volt
Power (Receiving Side) in KW
Considered Power Factor COS =
Sin =
3
Find the Ampere Ratings of this three phase power
Initial Load Current (I) =
Achievement
Initial Load Current (I) =
Original Load =
Corrected Load Current (I) =
Corrected Load =
Reduction in Current (I)
Reduction in Load
Capacitor value required
Cost of implementation
Cost of capacitor bank
P = 3 V I COS
415 VOLT
415.7 KW
0.938
0.348
1.732
I = P (3 V COS )
616.88 AMPERES
963.90 AMPERES
692.83 KVA
616.88 AMPERES
443.40 KVA
347.02 AMPERES
249.43 KVA
400 KVAr
150 Rs./KVA
300 Rs.
120000 RUPEES
0.27 YEAR
kVAR / (2 f V2)
50 Hz
415 VOLT
7.397E-06 farads
7.397 Microfarads
S/No. Item Name Qty. Voltage Ampere Wattage VA
1 Bulb 50 240 0.25 3000 3000
2 Motor 16 240 2 7680 7680
KVA = KW
COS
KVA = 11.11
12 KVA
TRUNKING CALCULATION
STANDA
STANDAR
50 X 50 MM 1,037
75 X 50 MM 1,555
75 X 75 MM 2,371
100 X 50 MM 2,091
100 X 75 MM 3,189
100 X 100 MM 4,252
TRUNKING CALCULA
WIRE SIZE
S.NO. NO OF CIRCUITS
IN SQ.MM
R ALUMINIUM 8.6 9.6 11.9 13.9 18.1 22.9 36.3 50.3 75.4 95 133 177 227
RS
TRUNKING CALCULATOR
RECOMMENDED TOTAL
NO OF CIRCUITS NO OF WIRES FACTOR PER WIRE FACTOR
8 24 13.9 333.6
13 39 18.1 705.9
TOTAL FACTOR 1039.5