RECAPITULATION SHEET

Sl.No Description Amount in Rs:


A CIVIL WORK
1 Construction of Bridge 3940286.06
2 Diversion Road 2028745.69
Grand Total 5969031.75

Asst. Executive Engineer, Executive Engineer,


GOVT. OF KARNATAKA

NAME OF WORK:

ESTIMATED COST : Lakhs.

HEAD OF ACCOUNT :
NAME OF WORK:

MEASUREMENT SHEET

It.N Description of items. Qty. Unit


o. No. L. B. D
1 2 3 4

1 KSRB M200-12.3 : Dismentling of existing structures like culverts, bridges,retaining walls


and other structure comprising of masonry, cement concrete, wood work,including T&P and
scafolding wherever necessary solting the dismentled material, disposal of unserviceable
material and stacking the serviceable material with all lifts complete as per specification.-do- C.
Prestressed/ Reinforced cement concrete grade M-20 and above
Dismentling of Concrete
Main Bridge up to 3 Pipes 10.00 8.10 4.00 = 324.00
324.00 Cum
Deductions
RCC For Pipes 2.40mtr Dia 3 Nos 3 (2.40)2/4 8.10 = 109.87 Cum

Total up to date Quantity after deduction :- = 214.13 Cum

2 KSRRB M2100-2.1: Earthwork excavation in foundation of structures as per drawing and


technical specifications, including setting out , construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides and bottom and backfilling with
approved material complete as per specification. B. Mechanical Means
Excvation for Apron
U/S Side 1 73.50 1.50 1.00 = 110.25
D/S Side 1 73.50 3.00 1.00 = 220.50
Wing Walls
U/S Side 1 3.00 1.00 2.00 = 6.00
D/S Side 1 3.00 1.00 2.00 = 6.00
342.75 Cum

3 KSRB 2.8 : Providing and filling foundation with granite/trap broken metal 100 mm and down
size, with approved sand including hand packing, ramming, watering, including including cost
of all material and labour with all lead and lift complete as per specifications.

Main Bridge up to 3 Pipes 1 10.00 8.10 0.30 = 24.30


For Apron
U/S Side 1 73.50 1.50 0.30 = 33.08
D/S Side 1 73.50 3.00 0.30 = 66.15
Wing Walls
U/S Side 1 3.00 1.00 0.30 = 0.90
D/S Side 1 3.00 1.00 0.30 = 0.90
125.33 Cum
It.N Description of items. Qty. Unit
o. No. L. B. D
1 2 3 4
4 KSRRB 2100-10: Plain Cement Concrete M15 with OPC cement @ 220 kgs, with crushed
40mm and down size graded granite metal coarse aggregates @ 0.84 cum and fine aggregates
@ 0.56 cum, in foundation mechanically mixed, placed in foundation and compacted by
vibration incuding curing for 14 days complete as per Specifications, MORTH Specification No.
2100

Main Bridge up to 3 Pipes 1 10.00 8.10 0.20 = 16.20


For Apron
U/S Side 1 73.50 1.50 0.15 = 16.54
D/S Side 1 73.50 3.00 0.15 = 33.08
Wing Walls
U/S Side 1 3.00 1.00 0.15 = 0.45
D/S Side 1 3.00 1.00 0.15 = 0.45
66.71 Cum

5 KSRRB 2100-15.1:KSRRB 2100-14; Plain/ Reinforced Cement Concrete M20 with OPC
cement @ 320 kgs, with crushed 20mm and down size graded granite metal coarse aggregates
@ 0.69 cum and fine aggregates @ 0.46 cum, with superplasticiser @ 3 litrs confirming to IS
9103-1999 Reaffirmed -2008, in open foundation complete as per Drawing and Technical
Specifications, MORTH Specification No. 1500, 1700 and 2100. Case-I :' Using Concrete
Mixer" MORTH Specification No. 1500, 1700 and 2100

Wing Walls
U/S Side 1 3.00 1.00 3.00 = 9.00
D/S Side 1 3.00 1.00 3.00 = 9.00
Curtain Wall
U/S Side 1 10.00 0.20 1.00 = 2.00
D/S Side 1 10.00 0.20 1.00 = 2.00
For Apron
U/S Side 1 73.50 1.50 0.30 = 33.08
D/S Side 1 73.50 3.00 0.30 = 66.15
Existing Pipe repair
21 Pipes 21 8.10 0.65 0.20 = 22.11
143.34 Cum

6 KSRRB 2200-5.12: Design mix M25 with OPC cement @ 340 kgs, with 20mm and down size
graded granite metal coarse aggregates @ 0.70 cum and fine aggregates @ 0.47 cum, with
superplasticiser @ 3 litrs confirming to IS 9103-1999 Reaffirmed -2008, (i) up to 5 m height
RCC For Pipes 2.40mtr Dia
Pipe Periferi= (2.40)= 7.54 3 Nos 3 8.10 7.54 0.15 = 27.48
Deck Slab 1 10.00 8.10 0.50 = 40.50
67.98 Cum

7 KSRRB M2200-6 : Supplying, fitting and placing TMT bar reinforcement in sub structure
complete as per drawing and technical specification complete as per specifications. MORTH
Specification No. 1600 & 2200

RCC For Pipes 2.40mtr Dia 3 Nos 67.98 100 Kg Per Cum = 6798.33
It.N Description of items. Qty. Unit
o. No. L. B. D
1 2 3 4
Wing Walls 18.00 45.00 Kg Per Cum = 810.00
Curtain Wall 4.00 44.00 Kg Per Cum = 176.00
Deck Slab 40.50 90.00 Kg Per Cum = 3645.00
11429.33 Kgs

Total up to date Quantity :- = 11.43 Tone

8 KSRRB 2200-8.1 : Back Filling behind abutment, wing wall and returns complete as per
drawing and specifications. A.Granular Material, MORTH Specification No. 710.1.4 of IRC :78 &
2200.

Main Bridge 1 10.00 8.10 3.00 = 243.00


On L/S Considering the slope of 1 10.00 3.00 3.00 = 90.00
embankment as 1:2
On R/S Considering the slope of 1 10.00 3.00 3.00 = 90.00
embankment as 1:2
423.00 Cum
Deductions
RCC For Pipes 2.40mtr Dia 3 Nos 3 (2.40)2/4 8.10 = 109.87 Cum

Total up to date Quantity after deduction :- = 313.13 Cum

9 KSRRB M2500-4.1: Providing and laying Pitching on slopes laid over prepared filter media
including boulder apron laid dry in front of toe of embankment complete as per drawing and
technical specification s complete as per specification A. Stone/ Boulder. MORTH
Specification No. 2504

On L/S 1:2 1 10.00 3.00 0.30 = 9.00


On R/S 1:2 1 10.00 3.00 0.30 = 9.00
18.00 Cum

10 KSRRB 2700-3: Construction of RCC Railings of M30 grade in situ with 20 mm nominal size
aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center
to center spacing between vertical post not to exceed 2000 mm, leaving adequate space
between vertical post for expansion, complete as per approved drawing and specifications.
MORTH Specification No.2703,1500,1600and 1700.

2 10.00 = 20.00
20.00 m

11 KSRRB M2200-8 : Providing weep holes in brick masonary/ plain/ Reinforced concrete
abutment/ wing wall / return wall with 100 mm dia. A.C. Pipe, extending through the full width of
the structure with slope of 1V:20 H towards drawing face complete as per drawing and
technical specification, MORTH Specification No. 2706 and 2200

For wing wall & Returns walls ( U/S) 1 5.00 = 5.00


For wing wall & Returns walls ( D/S) 1 5.00 = 5.00
10.00 Nos
It.N Description of items. Qty. Unit
o. No. L. B. D
1 2 3 4
12 KSRRB M 2700-6. PCC M15 Grade levelling course below approach Slab complete as per
drawing and technical specification. MORTH Specification No. 2700

Below Approach Slab 1 3.00 8.10 0.15 = 3.65


3.65 Cum

13 KSRRB M2700-7 :Reinforced cement concrete m-30 approach slab including reinforcement
and form work complete as per drawing and tecnical specification complete as per
specifications. MORTH Specification No. 1500,1600 1700 & 2704.

Approach Slab 1 3.00 8.10 0.30 = 7.29


7.29 Cum

14 KSRRB M2700-1 : Providing and laying 12mm thick mastic asphalt wearing course on top of
deck slab excluding prime coat with paving grade bitumen meeting the requirements given in
table 500-29, prepared by using mastic cooker and laid to required level and slope after
cleaning the surface, including providing antiskid surface with bitumen precoated fine grained
hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at
approximate spacing of 10 cm center to center in both directions, pressed into surface when
the surfaces not less than 100 deg.C, protruding 1mm to 4mm over mastic surface, all complete
as per clause 5100.5 complete as per specifications. MORTH specification No 515 & 2702

1 13.00 8.10 = 105.30


105.30 Sqm

15 KSRRB M2800-8 : Applying epoxy mortar over leached, honey combed and spalled concrete
surface and exposed steel reinforcement complete as per technical Specification. MORTH
Specification No. 2804
For existing Pipes
21 Pipes 21 8.10 1.50 = 255.15
Side 2 63.50 1.50 = 190.50
445.65 Sqm

16 KSRRB M2800-20 : Repair of RCC railing Carrying out repairs of RCC M-30 railing to bring it to
the original shape complete as per specifications.

Existing Bridge 2 63.50 = 127.00


127.00 m

17 KSRRB M2800-11 : Epoxy bonding of new concrete to old concrete complete as per
specifications. MORTH Specification No 2805

1 8.10 4.00 = 32.40


32.40 Sqm
It.N Description of items. Qty. Unit
o. No. L. B. D
1 2 3 4
18 KSRRB 15-3-14 : Providing 12mm thick cement plaster in single coat with cement morter
1:4, to ceiling including rounding off corners wherever required smooth rendring, including
providing and removing scaffolding, cost of material, labour, curing etc., complete as per
specification.

RCC For Pipes 2.40mtr Dia 21 Nos


Existing 21 Pipes 21 (2.40) 8.10 = 1281.87
1281.87 Sqm
NAME OF WORK:

ABSTRACT
GROUND FLOOR
It.No. Description of items. Qty Unit Rate Amount
1 2 3 4 5 6
1 KSRB M200-12.3 : Dismentling of existing 214.13 Cum 1068.90 228883.56
structures like culverts, bridges,retaining walls and
other structure comprising of masonry, cement
concrete, wood work,including T&P and scafolding
2 KSRRB M2100-2.1: Earthwork excavation in 342.75 Cum 50.40 17274.60
wherever necessary solting the dismentled
foundation of structures as per drawing and
material, disposal of unserviceable material and
technical specifications, including setting out ,
stacking the serviceable material with all lifts
construction of shoring and bracing, removal of
3 KSRB
complete2.8as: Providing and filling foundation
per specification.-do- C. Prestressed/with 125.33 Cum 2070.60 259497.95
stumps and other deleterious matter, dressing of
granite/trap
Reinforced broken
cementmetal 100 mm
concrete and M-20
grade down size,
and
sides and bottom and backfilling with approved
with
aboveapproved sand including hand packing,
material complete as per specification. B.
ramming, watering, including including cost of all
4 KSRRB 2100-10:
Mechanical MeansPlain Cement Concrete M15 with 66.71 Cum 6103.65 407189.75
material and labour with all lead and lift complete
OPC cement @ 220 kgs, with crushed 40mm and
as per specifications.
down size graded granite metal coarse aggregates
@ 0.84 cum and fine aggregates @ 0.56 cum, in
5 KSRRB 2100-15.1:KSRRB 2100-14; Plain/ 143.34 Cum 6714.75 962478.84
foundation mechanically mixed, placed in
Reinforced Cement Concrete M20 with OPC
foundation and compacted by vibration incuding
cement @ 320 kgs, with crushed 20mm and down
curing for 14 days complete as per Specifications,
size graded granite metal coarse aggregates @
6 KSRRB 2200-5.12: Design
MORTH Specification No. 2100 mix M25 with OPC 67.98 Cum 7335.30 498677.90
0.69 cum and fine aggregates @ 0.46 cum, with
cement @ 340 kgs, with 20mm and down size
superplasticiser @ 3 litrs confirming to IS 9103-
graded granite metal coarse aggregates @ 0.70
1999 Reaffirmed -2008, in open foundation
cum and fine aggregates @ 0.47 cum, with
7 KSRRB
completeM2200-6
as per : Supplying,
Drawingfitting
andandTechnical
placing 11.43 Cum 62402.55 713219.34
superplasticiser @ 3 litrs confirming to IS 9103-
TMT bar reinforcement
Specifications, MORTH inSpecification
sub structureNo. complete
1500,
1999 Reaffirmed -2008, (i) up to 5 m height
as
1700perand drawing and :'technical
2100. Case-I specification
Using Concrete Mixer"
complete
MORTH as per No.specifications.
Specification 1500, 1700 and MORTH
2100
8 KSRRB 2200-8.1 : Back Filling behind abutment, 313.13 Cum 658.35 206149.14
Specification No. 1600 & 2200
wing wall and returns complete as per drawing and
specifications. A.Granular Material, MORTH
Specification No. 710.1.4 of IRC :78 & 2200.
9 KSRRB M2500-4.1: Providing and laying Pitching 18.00 Cum 1441.65 25949.70
on slopes laid over prepared filter media including
boulder apron laid dry in front of toe of
embankment complete as per drawing and
10 KSRRB 2700-3: Construction of RCC Railings of 20.00 m 1798.65 35973.00
technical specification s complete as per
M30 grade in situ with 20 mm nominal size
specification A. Stone/ Boulder. MORTH
aggregate, true to line and grade, tolerance of
Specification No. 2504
vertical RCC post not to exceed 1 in 500, center to
11 KSRRB M2200-8 : Providing weep holes in brick 10.00 Nos 184.80 1848.00
center spacing between vertical post not to exceed
masonary/ plain/ Reinforced concrete abutment/
2000 mm, leaving adequate space between
wing wall / return wall with 100 mm dia. A.C. Pipe,
vertical post for expansion, complete as per
extending through the full width of the structure
12 KSRRB
approvedMdrawing
2700-6. and
PCCspecifications.
M15 Grade MORTH levelling 3.65 Cum 6070.05 22125.33
with slope of 1V:20 H towards drawing face
course belowNo.2703,1500,1600and
Specification approach Slab complete 1700.as per
complete as per drawing and technical
drawing and technical specification. MORTH
specification, MORTH Specification No. 2706 and
Specification No. 2700
13 KSRRB
2200 M2700-7 :Reinforced cement concrete m- 7.29 Cum 10171.35 74149.14
30 approach slab including reinforcement and form
work complete as per drawing and tecnical
specification complete as per specifications.
14 KSRRB M2700-1 : Providing and laying 12mm 105.30 Sqm 255.15 26867.30
MORTH Specification No. 1500,1600 1700 &
thick mastic asphalt wearing course on top of deck
2704.
slab excluding prime coat with paving grade
bitumen meeting the requirements given in table
15 KSRRB M2800-8 : Applying epoxy mortar over 445.65 Sqm 394.80 175942.62
500-29, prepared by using mastic cooker and laid
leached, honey combed and spalled concrete
to required level and slope after cleaning the
surface and exposed steel reinforcement complete
surface, including providing antiskid surface with
as per technical Specification. MORTH
16 KSRRB
bitumen M2800-20
precoated : Repair
fine ofgrained
RCC railing
hardCarrying
stone 127.00 m 207.90 26403.30
Specification No. 2804
chipping
out of of
repairs 9.5RCC
mmM-30
nominal size
railing to at the itrate
bring of
to the
0.005cum
original per 10
shape sqm and
complete as at
perapproximate
specifications.spacing
of 10 cm center to center in both directions,
pressed into surface when the surfaces not less
than 100 deg.C, protruding 1mm to 4mm over
mastic surface, all complete as per clause 5100.5
complete as per specifications. MORTH
specification No 515 & 2702
It.No. Description of items. Qty Unit Rate Amount
1 2 3 4 5 6
17 KSRRB M2800-11 : Epoxy bonding of new 32.40 Sqm 682.50 22113.00
concrete to old concrete complete as per
specifications. MORTH Specification No 2805
18 KSRRB 15-3-14 : Providing 12mm thick cement 1281.87 Sqm 183.75 235543.61
plaster in single coat with cement morter 1:4, to
ceiling including rounding off corners wherever
required smooth rendring, including providing and
3940286.06
removing scaffolding, cost of material, labour,
curing etc., complete as per specification.
NAME OF WORK:
RATE ANALYSIS

It.No. Description of items. Unit Page No Item No Basic Rate Area Rate For G.F
2016-17 Weightage 5
%
1 2 3 4 5 6 7 8
GROUND FLOOR
1 KSRB M200-12.3 : Dismentling of existing structures like culverts, bridges,retaining walls Cum 137 18.19 1018.00 50.90 1068.90
and other structure comprising of masonry, cement concrete, wood work,including T&P
and scafolding wherever necessary solting the dismentled material, disposal of
unserviceable material and stacking the serviceable material with all lifts complete as per
2 KSRRB M2100-2.1: Earthwork excavation in foundation of structures as per drawing Cum 216 27.4 48.00 2.40 50.40
specification.-do- C. Prestressed/ Reinforced cement concrete grade M-20 and above
and technical specifications, including setting out , construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing of sides and bottom and
backfilling with approved material complete as per specification. B. Mechanical Means
3 KSRB 2.8 : Providing and filling foundation with granite/trap broken metal 100 mm and Cum 6 2.15 1972.00 98.60 2070.60
down size, with approved sand including hand packing, ramming, watering, including
including cost of all material and labour with all lead and lift complete as per
specifications.
4 KSRRB 2100-10: Plain Cement Concrete M15 with OPC cement @ 220 kgs, with Cum 218 27.18 5813.00 290.65 6103.65
crushed 40mm and down size graded granite metal coarse aggregates @ 0.84 cum and
fine aggregates @ 0.56 cum, in foundation mechanically mixed, placed in foundation and
compacted by vibration incuding curing for 14 days complete as per Specifications,
5 KSRRB 2100-15.1:KSRRB 2100-14; Plain/ Reinforced Cement Concrete M20 with OPC Cum 218 27.26 6395.00 319.75 6714.75
MORTH Specification No. 2100
cement @ 320 kgs, with crushed 20mm and down size graded granite metal coarse
aggregates @ 0.69 cum and fine aggregates @ 0.46 cum, with superplasticiser @ 3 litrs
confirming to IS 9103-1999 Reaffirmed -2008, in open foundation complete as per
6 KSRRB 2200-5.12: Design mix M25 with OPC cement @ 340 kgs, with 20mm and down Cum 223 28.7.2 6986.00 349.30 7335.30
Drawing and Technical Specifications, MORTH Specification No. 1500, 1700 and 2100.
size graded granite metal coarse aggregates @ 0.70 cum and fine aggregates @ 0.47
Case-I :' Using Concrete Mixer" MORTH Specification No. 1500, 1700 and 2100
cum, with superplasticiser @ 3 litrs confirming to IS 9103-1999 Reaffirmed -2008, (i) up
to 5 m height
7 KSRRB M2200-6 : Supplying, fitting and placing TMT bar reinforcement in sub structure Tonne 225 28.802 59431.00 2971.55 62402.55
complete as per drawing and technical specification complete as per specifications.
MORTH Specification No. 1600 & 2200
8 KSRRB 2200-8.1 : Back Filling behind abutment, wing wall and returns complete as per Cum 225 28.11 627.00 31.35 658.35
drawing and specifications. A.Granular Material, MORTH Specification No. 710.1.4 of
IRC :78 & 2200.
9 KSRRB M2500-4.1: Providing and laying Pitching on slopes laid over prepared filter Cum 240 30.5 1373.00 68.65 1441.65
media including boulder apron laid dry in front of toe of embankment complete as per
drawing and technical specification s complete as per specification A. Stone/ Boulder.
MORTH Specification No. 2504
It.No. Description of items. Unit Page No Item No Basic Rate Area Rate For G.F
2016-17 Weightage 5
%
1 2 3 4 5 6 7 8
10 KSRRB 2700-3: Construction of RCC Railings of M30 grade in situ with 20 mm nominal m 246 32.3 1713.00 85.65 1798.65
size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in
500, center to center spacing between vertical post not to exceed 2000 mm, leaving
adequate space between vertical post for expansion, complete as per approved drawing
11 KSRRB M2200-8 : Providing weep holes in brick masonary/ plain/ Reinforced concrete Nos 225 28.1 176.00 8.80 184.80
and specifications. MORTH Specification No.2703,1500,1600and 1700.
abutment/ wing wall / return wall with 100 mm dia. A.C. Pipe, extending through the full
width of the structure with slope of 1V:20 H towards drawing face complete as per
drawing and technical specification, MORTH Specification No. 2706 and 2200
12 KSRRB M 2700-6. PCC M15 Grade levelling course below approach Slab complete as Cum 246 32.6 5781.00 289.05 6070.05
per drawing and technical specification. MORTH Specification No. 2700
13 KSRRB M2700-7 :Reinforced cement concrete m-30 approach slab including Cum 246 32.7 9687.00 484.35 10171.35
reinforcement and form work complete as per drawing and tecnical specification
complete as per specifications. MORTH Specification No. 1500,1600 1700 & 2704.
14 KSRRB M2700-1 : Providing and laying 12mm thick mastic asphalt wearing course on Sqm 246 32.1 243.00 12.15 255.15
top of deck slab excluding prime coat with paving grade bitumen meeting the
requirements given in table 500-29, prepared by using mastic cooker and laid to required
level and slope after cleaning the surface, including providing antiskid surface with
15 KSRRB M2800-8 : Applying epoxy mortar over leached, honey combed and spalled Sqm 249 33.8 376.00 18.80 394.80
bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of
concrete surface and exposed steel reinforcement complete as per technical
0.005cum per 10 sqm and at approximate spacing of 10 cm center to center in both
Specification. MORTH
directions, pressed intoSpecification
surface when No.the
2804
surfaces not less than 100 deg.C, protruding
16 KSRRB
1mm to M2800-20
4mm over :mastic
Repairsurface,
of RCCall railing Carrying
complete out clause
as per repairs5100.5
of RCCcomplete
M-30 railing
as perto m 251 33.23 198.00 9.90 207.90
bring it to the original
specifications. MORTH shape completeNo
specification as515
per &specifications.
2702
17 KSRRB M2800-11 : Epoxy bonding of new concrete to old concrete complete as per Sqm 250 33.12 650.00 32.50 682.50
specifications. MORTH Specification No 2805
18 KSRRB 15-3-14 : Providing 12mm thick cement plaster in single coat with cement morter Sqm 114 15.22 175.00 8.75 183.75
1:4, to ceiling including rounding off corners wherever required smooth rendring,
including providing and removing scaffolding, cost of material, labour, curing etc.,
complete as per specification.
NAME OF WORK:

MEASUREMENT SHEET

It.N Description of items. Qty. Unit


o. No. L. B. D
1 2 3 4

1 KSRRB M300-53 : Construction of Embankment with approved material Gravel/Murrum with all
leads and lifts transporting to site, spreading grading to required slope and compacting to meet
requiremernt Table 300-2 complete as per specification, (which includes cost of
Gravel/Murrum, watering charges and compaction by vibratory roller). MORTH Specification
No. 305.

Diversion Road Width 7.50 mtr 1:1.5 1 150.00 9.38 2.00 = 2814.00
2814.00 Cum

2 KSSRB M400- Wet Mix Macadam


KSRRB M400-17. Providing, laying, spreading and compacting graded
stones aggregate to wet mix macadam specifications including pre mixing the material with
water at OMC in mechanical mix plant carriage of mixed materials by tipper to site, laying in
uniform layers with paver in sub-base/base course on well prepared surface and compacting
with vibratory roller to achieve the desired density complete as per specifications. MORTH
Specification No. 406

Diversion Road Width 7.50 mtr 1:1.5 1 150.00 7.50 0.25 = 281.25
281.25 Cum

Providing and laying reinforced cement concrete pipe NP3 pipe for culverts including pointing
ends, and fixing collars with cement mortar 1:2 including cost of all materials, labour, curring
complete as per specifications. MOST Specification No 1000/2300

For Diversion Road Width 7.50 mtr 4 7.50 = 30.00


30.00 m
NAME OF WORK:

ABSTRACT
GROUND FLOOR
It.No. Description of items. Qty Unit Rate Amount
1 2 3 4 5 6
1 KSRRB M300-53 : Construction of Embankment 2814.00 Cum 414.75 1167106.50
with approved material Gravel/Murrum with all
leads and lifts transporting to site, spreading
grading to required slope and compacting to meet
2 KSSRB M400- Wet Mix Macadam 281.25 Cum 2023.35 569067.19
requiremernt Table 300-2 complete as per
specification, (which includes cost of
KSRRB M400-17. Providing, laying,
Gravel/Murrum, watering charges and compaction
spreading and compacting graded stones
3 Providing
by vibratoryand laying
roller). reinforced
MORTH cement No.
Specification concrete
305. 30.00 m 9752.40 292572.00
aggregate to wet mix macadam specifications
pipe NP3 pipe for culverts including pointing ends,
including pre mixing the material with water at
and fixing collars with cement mortar 1:2 including
OMC in mechanical mix plant carriage of mixed
cost of all materials, labour, curring complete as
materials by tipper to site, laying in uniform layers 2028745.69
per specifications. MOST Specification No
with paver in sub-base/base course on well
1000/2300
prepared surface and compacting with vibratory
roller to achieve the desired density complete as
per specifications. MORTH Specification No. 406
NAME OF WORK:
RATE ANALYSIS

It.No. Description of items. Unit Page No Item No Basic Rate Area Rate For G.F
2016-17 Weightage 5
%
1 2 3 4 5 6 7 8
GROUND FLOOR
1 KSRRB M300-53 : Construction of Embankment with approved material Gravel/Murrum Cum 148 19.6 395.00 19.75 414.75
with all leads and lifts transporting to site, spreading grading to required slope and
compacting to meet requiremernt Table 300-2 complete as per specification, (which
includes cost of Gravel/Murrum, watering charges and compaction by vibratory roller).
2 KSSRB M400- Wet Mix Macadam Cum 158 20.18 1927.00 96.35 2023.35
MORTH Specification No. 305.
KSRRB M400-17. Providing, laying, spreading and
compacting graded stones aggregate to wet mix macadam specifications including pre
mixing the material with water at OMC in mechanical mix plant carriage of mixed
3 Providing and laying reinforced cement concrete pipe NP3 pipe for culverts including m 253 34.6.6 9288.00 464.40 9752.40
materials by tipper to site, laying in uniform layers with paver in sub-base/base course
pointing ends, and fixing collars with cement mortar 1:2 including cost of all materials,
on well prepared surface and compacting with vibratory roller to achieve the desired
labour,
density curring
completecomplete as per specifications.
as per specifications. MORTH MOST Specification
Specification No 1000/2300
No. 406
4

9
It.No. Description of items. Unit Page No Item No Basic Rate Area Rate For G.F
2016-17 Weightage 5
%
1 2 3 4 5 6 7 8
10

11

12

13

14

15

16

17

18
It.No. Description of items. Unit Page No Item No Basic Rate Area Rate For G.F
2016-17 Weightage 5
%
1 2 3 4 5 6 7 8
It.No. Description of items. Unit Page No Item No Basic Rate Area Rate For G.F
2016-17 Weightage 5
%
1 2 3 4 5 6 7 8
It.No. Description of items. Unit Page No Item No Basic Rate Area Rate For G.F
2016-17 Weightage 5
%
1 2 3 4 5 6 7 8

Das könnte Ihnen auch gefallen