Beruflich Dokumente
Kultur Dokumente
Topcon
Topcon
perhitungan perhitungan
untuk volume perbandinga
keseluruhan n dengan T0
Ket
Tg = 0
a = 1.5 m
perhitungan untuk volume keseluruhan Galian
100
98
96
94
100
98
96
94
92
90
88
86
84
95 96 97 98 99 100 101 102 103 104
perhitungan perbandingan dengan T0
A = 2.25 V = 10.9485
i T1 (1 grid) i T2 (2 grid) i T3 (grid) i T4 (4 grid) h4 = 1.688
1 1.153 2 0.58 15 -0.437 12 0.589
5 -0.459 3 0.291 19 -0.088 13 0.319
9 1.208 4 0.008 14 -0.138
16 -0.541 7 1.169 20 0.31 A = 2.25
17 -0.539 8 1.193 21 0.608 V= 8.5651875
24 0.011 18 -0.335
22 0.599
11.077875 23 0.316
h1 = 0.833 h2 = 3.821 h3 = -0.525 h4 = 1.688
A = 2.25 V = 7.67925
i T1 (1 grid) i T2 (2 grid) i T3 (grid) i T4 (4 grid)
15 0.082 16 0.347 22 -0.058 20 0.627
18 1.217 17 0.622 26 -0.418 21 0.352
24 -0.463 19 1.202 27 -0.483
25 -0.448 23 -0.323 28 0.417
31 1.177 30 1.197 29 0.627
35 -0.428 32 0.652
33 0.332
34 0.017
h1 = 1.137 h2 = 4.046 h3 = -0.476 h4 = 1.54
A = 2.25 V = 7.8530625