Sie sind auf Seite 1von 2

BBP

AS-IS
TO-BE
CONFIGURATION
GAP

WEEK 01
PROJECT PREPARATION
Project Charter
Project Plan
BBP Phase:
Data Gathering
Scenario List (As-Is) 3rd Week (*)
Draw Processes (with Description)

WEEK 04
As IS completed

WEEK 05
As-is Presentation
Week 06 07

To Be brain storming

WEEK 08
To-Be Design with description
Week 09-10
Configuration Requirements
(e.g. Org.Structure)
Configuration document
Mapping on system
To-Be finalized
WEEK 12:
Identify GAP
Final Presentation
Realationship goals

Das könnte Ihnen auch gefallen