1. INTRODUCTION

I have been requested by HWL Ebsworth Lawyers on behalf of VicRoads, to provide an expert
opinion report in relation to the impact that the Stockman Base Metals Project (Project)
generated traffic will have on various lengths of pavements located on Benambra Road, Omeo
Highway and the Great Alpine Road.

In preparing the report due consideration is given to:


i) Reports prepared by SKM and AECOM;
ii) Assessing the impact that the additional vehicles and additional loads generated by the
Project will have on the road networks likely to be used by the trucks transporting
products from the proposed mine;
iii) Comparing the above mentioned impacts with the current truck usage on the same road
networks (for example, current truck usage from the dairy and logging industry);
iv) Considering any relevant design standards and maintenance schedules; and
v) Any other matters believed to be relevant.

In preparing the report, the following documentation was reviewed:


- Stockman Project Environment Effects Statement Independence Group NL;
- AECOM Roads, Traffic and Transport Technical Report - Stockman Environmental
Effects Statement September 2013;
- Sinclair Knight Merz Stockman Project Review of Roads, Traffic and Transport
Technical Report November 2013;
- VicRoads Stockman Base Metals Project EES.

2. QUALIFICATIONS & EXPERIENCE

I am currently the VicRoads Principal Advisor Pavement, Geotech. & Materials. In this and
previous roles I have been responsible for providing VicRoads with independent technical
advice relating to pavement technology issues.

Appendix B contains a statement setting out my qualifications and experience.

Appendix C contains my CV.

3. SUMMARY OF OPINIONS

In relation to the impact that the Project generated traffic loading is expected to have on
pavement condition and deterioration, the AECOM and Independence Group reports provided
little detail. Traffic data sourced from the AECOM report, combined with an understanding of
existing pavement composition and utilising appropriate Austroads and VicRoads publications,
indicates that traffic generated from the Stockman Base Metals Project will:

- lead to increased pavement distress;


- increase the likelihood of flushing of existing sprayed seal surfacing necessitating the need
for treatments to address skid resistance deficiencies;
- impact on the type of future sprayed seal treatment required.

Further investigation to predict the extent and severity of pavement distress and when it is likely
to occur is required. A detailed site inspection is also recommended.

1
Doc ID 178428591/v1
4. BACKGROUND

The Stockman Base Metals Project is proposing to recommission the abandoned Wilga
underground mine and develop the Currawong underground mine located 19 km south east of
Benambra. Ore product will be extracted to produce concentrates of zinc and copper. The
concentrates are to be transported by road on B-double trucks to the Port of Geelong. It is
proposed to extract 9 Mt of ore, producing copper and zinc concentrate at a rate of
approximately 150,000 tonnes per annum over a nine year operating life.

5. REVIEW OF PROJECT ENVIROMENTAL EFFECTS STATEMENT


A review was undertaken of the following documents with respect to information relating to
pavement condition and impact on pavement performance from the Project operations:

Stockman Project Environment Effects Statement Independence Group NL (herein


referred to as the Independence Report)

AECOM Roads, Traffic and Transport Technical Report - Stockman Environmental


Effects Statement September 2013 (herein referred to as the AECOM Report)

In relation to the assessment of pavement condition and the impacts of Project generated traffic
loading, the Independence and AECOM reports provide very little discussion. This observation
is supported by the report by Sinclair Knight Merz Stockman Project Review of Roads, Traffic
and Transport Technical Report November 2013 that notes, The AECOM report provides very
little commentary on road deterioration and appears to be limited to seal and pavement.

Information relating to traffic volumes (current and predicted) and the heavy vehicle type
expected to be used in the cartage of concentrates was sourced from the Independence and
AECOM reports. This information has been used to assist in the determination of pavement,
current and predicted, traffic loadings.

6. ASSEMENT OF PROJECT OPERATIONS TRAFFIC ON PAVEMENTS

6.1 General

Assessments of traffic loading and impact on pavements have been undertaken where
appropriate, in accordance with:

Austroads (2012) Guide to Pavement Technology Part 2: Pavement Structural Design;


and
VicRoads (2013) Code of Practice RC 500.22 Selection and Design of Pavements and
Surfacing.

Austroads (2013) is used nationally as the guiding document to pavement design. VicRoads
(2013) supplements Austroads (2013) and provides specific detail relating to the design of
pavements in Victoria.

6.2 Traffic Loading

Pavement performance is affected by numerous factors including traffic loading, subgrade


(foundation) support, pavement depth, pavement composition including surfacing, environment
(moisture, temperature), road geometry and cross section.

A key factor affecting pavement depth and composition is traffic loading. As traffic loading

2
Doc ID 178428591/v1
increases, the required pavement depth increases and so does the need to use higher quality
pavement material.

Traffic loading is applied to a pavement by a wide range of vehicle types e.g. bicycle, cars,
trucks etc. Light vehicles such as bikes, cars and vans do not contribute significantly to the
structural deterioration of a pavement and only heavy (commercial) vehicles are considered in
pavement evaluation and design.

The damage caused to a pavement by a heavy vehicle depends on the:

i) number of axles on the vehicle;


ii) axle group types;
iii) axle group load.

In order to assess the damaging effect from the range of heavy vehicle types and load that will
traffic the pavement, axle groups are converted into Equivalent Standard Axles (ESA). That is
the numbers of loads of different magnitude are converted to an equivalent number of loads of a
standard magnitude. A Standard Axle is 8.2 t on a single axle dual tyre.

Table 1 shows for typical axle group types, the load required to be carried for that axle group
type and load configuration to cause the same damaging effect as one Standard Axle.

Table 1 Loads on axle groups which cause same damage as Standard Axle
Axle Group Type Standard Load (kN)
Single axle with single tyre 53
Single axle with dual tyres) 80
Tandem axle with dual tyres 135
Tri-axle with dual tyres 181
Quad-axle with dual tyres 221
Source Austroads (2012)

As an example, 181 KN (18.4 t) on a tri-axle with dual tyres does the same damage as a 80kN
(8.2t) on a single axle with dual tyres.

As the actual loads carried by heavy vehicles vary, a method for determining the damaging
effect from these vehicles is required. Pavement damage follows an exponential relationship
and the ESA for each axle group can be determined by:

ESA = (L/SL)4

where: L is the axle load (kN); and


SL is the axle group standard load (kN) as per Table 1.

Therefore, any load and axle combination can be converted into ESA. This allows the total ESA
for any traffic volume and analysis period to be determined.

In sourcing traffic data the predicted traffic volumes provided in the Independence and AECOM
reports appeared to lack consistency. The AECOM report, specifically Section 5.3.3 was used
as the basis of predicted volumes generated during the Project operation phase. That is:

27 No. Fully Loaded B - doubles to Geelong. Empty for return trip;


8 No. Fully Loaded B - doubles from Bairnsdale. Empty for return trip;
9 No. Semi-trailer loaded with goods from Bairnsdale.

Note, the above figures are averages.

The ESA for a legally fully loaded B - double and semi trailer (with road friendly suspensions
and Higher Mass Limit) have been calculated to be 6.35 (illustrated in Table 2) and 4.96,

3
Doc ID 178428591/v1
respectively, based on procedures provided by Austroads (2012).

Table 2 Calculation of ESA for B double


Actual Permitted
6 17 22.5 22.5
Axle Load (t)
1
RFS & HML
0 0.5 2.5 2.5
Concessions (t)
Load for ESA
Determination
(t) 6 16.5 20 20
2
(kN) (58.86) (161.87) (196.20) (196.20)
4 4 4 4
ESA per Axle (58.86/53) (161.87/135) (196.20/181) 196.20/181)
Group (with RFS = = = =
& HML) 1.52 2.07 1.38 1.38
Total ESA 1.52+2.07+1.38+1.38

B- double with = 6.35


3
RFS & HML
Notes to Table 2
1. Road Friendly Suspension (RFS) & Higher Mass Limit (HML)
2. kN = t x 9.81
3. B double assumed to be operating with RFS & HML under National Heavy Vehicle Accreditation Scheme.

Table 3 provides an assessment of the yearly traffic loading in ESA based on current and
predicted traffic volumes. In assessing the ESA generated by the additional heavy vehicles,
only the Project operation phase was considered.

To determine the loading from current heavy vehicles requires an estimation of the ESA per
heavy. VicRoads (2013) indicates that for a rural arterial the average ESA per heavy vehicle
varies from 1.4 to 2.6. In the absence of more accurate heavy vehicle axle and load data, it is
assumed for the affected pavements there is on average 2 ESA per heavy vehicle. This is the
midpoint of the range of 1.4 to 2.6 and considered a reasonable representation of the mix of
heavy vehicles (logging and livestock trucks, general goods etc.) currently using the affected
pavements.

4
Doc ID 178428591/v1
Table 3 Current and Predicted Traffic Loading
Road Existing Existing Additional Total ESA Approximate
Daily Yearly Yearly First Year % Increase In
3 4
Traffic ESA ESA of Project Yearly
1
(2 Way) Operation ESA
Benambra Rd
2 4 5
(Omeo Hwy To 247 (14) 1.3 x 10 1.1 x 10 750
Benambra)
Omeo Hwy 4 5
405 (25) 3.7 x 10 1.3 x 10 260
(Omeo To Benambra Rd)
4
Great Alpine Rd 4 9.7 x 10 5
576 (26) 5.5 x 10 1.5 x 10 180
(Omeo To Ensay)
Great Alpine Rd 4 5
820 (18) 5.4 x 10 1.5 x 10 180
(Ensay To Bruthen)
Great Alpine Rd 5 5
3484 (18) 2.3 x 10 3.3 x 10 40
(Bruthen To Bairnsdale)
Notes to Table 3
1. Source Table E3 Independence Report except Heavy Vehicle (HV) % based on data provided from Appendix D AECOM
Report.
2. Figures in brackets are %HV.
3. Average ESA per HV - Source VicRoads (2013) Table B4. Calculation based on Traffic Volume x %HV x 0.5 (2 /1 way
factor) x 365 (days/yr) x 2.0 (average ESA/HV)
4. Yearly ESA = ((27+8 No. B-doubles ) x 6.35 + (9 No. semi trailer x 4.96)) x 365

As indicated in Table 3, pavements currently carrying low volumes of traffic are predicted to
experience a dramatic increase in loading (ESA) e.g. Benambra Rd increases by 750%, for the
first year of the Project operation. Omeo Hwy is predicted to have an increase of 260%, the
Great Alpine Rd north and south of Bruthen 180% and 40% respectively.

Generally for heavily trafficked pavements, such as those located along the Princes Highway
East, and to a lesser extent the Great Alpine Road south of Bruthen, the impact of the additional
loading associated with the Project would be significantly less as the increase in loading is
relatively small when compared to the current traffic loading. However, for lightly trafficked
pavements the effect of the increased loading can be significant.

6.3 Impact on Pavement Structure

To assist in quantifying the impact that the additional traffic loading may have on pavement
structural requires a comparison of current pavement thickness and required pavement
thickness.

VicRoads Eastern Region advises that existing pavements are 280 to 300 mm thickness. Table
4 provides the required depths for the predicted traffic loading based on a 9 year (stated
operational life of the Project) analysis period. Based on Austroads (2012) the required design
thickness varies between 390 mm for Benambra Rd to 440 mm for the Great Alpine Rd south of
Bruthen. This suggests that in order to carry the predicted loading the existing pavements
require significant strengthening by the addition of granular material. Without the additional
material, pavement structural defects in the form of shape loss and rutting are expected. Note,
the pavement depth deficiency is based on an assumed subgrade strength (foundation
support) of CBR 5%. This is an over simplification of the subgrade support provided along the
length of the affected roads. Actual subgrade CBR may be higher or lower.

The above analysis compares pavement depth requirements of a new pavement against
current pavement depths, however the existing pavements may already be structurally
inadequate to carry future traffic even without the additional Project generated loading. An
alternative method of assessment is to determine the increase in pavement depth required
(strengthening requirement) to maintain current structural condition. Table 4 indicates that 85
mm of granular material is required along Benambra Rd, 40 to 50 mm for Omeo Hwy and the
Great Alpine Rd north of Bruthen. Strengthening requirements for the Great Alpine Road south

5
Doc ID 178428591/v1
of Bruthen are negligible. A more accurate assessment of pavement depth requirements can be
derived through pavement strength (deflection) testing.

Table 4 Pavement Depth and Strengthening Requirements


Total Required Total ESA Required Strengthening
ESA For 9 Pavement Including Pavement Requirement
Year Life Depth 9 Years of Depth - Additional
Without Without Project With Granular
Road 3
Project Project Operation Project Resheet
1 2
Operation Operation Operation Thickness
(mm) (mm) (mm)
5 5
x 10 x 10
Benambra Rd
1.3 305 10 390 85
(Omeo Hwy To Benambra)
Omeo Hwy
(Omeo To Benambra- 3.7 350 12 400 50
Corryong Rd)
Great Alpine Rd
5.5 365 14 405 40
(Omeo To Ensay)
Great Alpine Rd
5.4 365 14 405 40
(Ensay To Bruthen)
Great Alpine Rd
23 430 32 440 10
(Bruthen To Bairnsdale)
Notes to Table 4
1. Includes nominal 3% cumulative growth in traffic.
2. Based on assumed subgrade CBR 5%. Depths expected to differ from actual existing pavement thickness.
3. Based on Independence Report, page ii Summary Report. Does not including decommissioning. Additional loading over a
9 year period is 8.73 x 105 ESA from Project operations.

Benambra Road and Omeo Highway are classified by VicRoads as C Roads whilst the Great
Alpine Road is classified as a B Road. As Class C and B roads, they are expected to carry
significantly less traffic than Class A roads e.g. Princes Hwy East, and hence their pavement
structure tends to reflect the required load carrying capacity. Class A roads would generally
have thicker pavements and consist of higher quality pavement materials.

It is highly likely that Benambra Road, Omeo Highway and the Great Alpine Road pavements
have been progressively strengthened over time in response to increasing traffic loading. The
pavements reportedly consist of local granular materials. These materials, often referred to as
marginal or non standard, may not meet current pavement material quality requirements. They
are generally fit for purpose if maintained in a dry state and not used beyond their loading
carrying capacity. However, they become increasingly more susceptible to damage as traffic
loading increases, moreso in the presence of moisture. Therefore, the outcomes of the analysis
shown in Table 4 may be understating the impact of the additional Project loading.

6.4 Impact on Surfacing Performance

The use of the ESA approach to assess pavement structural requirements only allows one
type of damage to be considered, that is overall deterioration of the pavement reflecting
increased levels of roughness and rutting. It does not take into account the following:

i) Pavement seal edge break (Figure 1) resulting from the trafficking of the sealed pavement
/ unsealed shoulder interface. Associated with edge break is shoulder wear, moisture
ingress and localised failure (Figures 2 and 3) of the pavement. The likelihood of edge
break increases for narrow seal widths and for inside of curves where trafficking from
heavy vehicles is more likely.

6
Doc ID 178428591/v1
Figure 1 Edge Break Figure 2 -Shoving of pavement

Figure 3 Localised pavement failures with shape loss and potholes evident

ii) The impact of increased heavy vehicle volumes and loading on the existing sprayed seal
surfacing which is expected to result in an increase in the extent of flushing (Figure 4).
Flushing is defined as a pavement surface defect in which the binder is near the top of the
surfacing aggregate resulting in minimal surface texture. In severe cases, the bitumen
covers the aggregate. An increase in flushing will lead to a reduction in skid resistance
and therefore increase the likelihood of vehicle loss of control accidents.

Figure 4 Flushing of a sprayed seal Figure 5 -Flushing with pick up (circled)

7
Doc ID 178428591/v1
iii) The effect of shear forces applied to the pavement (during acceleration and braking) or
load transfer from the one side of the vehicle to the other as vehicles traverse tight curves
etc. These high stress areas are expected to have an increased incidence of pavement
distress.

Predicting the extent and severity of pavement and surfacing distress resulting from the above
is problematic, particularly for Item i). With respect to Item ii) a method to determine the
potential extent of flushed surfacing can be developed based on an understanding (type,
location) of sealing works undertaken over the last 5 years. For the purpose of the evaluation, it
may be assumed the design and application of any recently applied sprayed seal resurfacing
was based on predicted traffic volumes lower than that associated with the Project operations.
Therefore, these areas are likely to have excess bitumen for the higher traffic volumes and
therefore be susceptible to flushing.

The likelihood of flushing increase on areas of acceleration and braking e.g. steep grades, short
radius curves, largely due to the increased horizontal loading imposed during these types of
manoeuvres. The small radius curves are of particular concern due to the increased shear
loading that will be induced by the tri-axle groups which may result in the aggregate particles
rolling over and exposing fresh binder potentially resulting in pick up (removal) of the seal
(Figure 5).

The sprayed seal age and weather are key elements in the likelihood of the above issues
occurring. The risk reduces with the age of the seal as the binder oxidises and begins to
harden, but increases during periods of hot weather when the binder is at its softest. Further
increasing the risk of flushing is that at lower traffic volumes the design binder rates are higher
making the sprayed seal more susceptible to traffic variations (increases) noting that generally
binder application rates decrease as traffic volumes increase.

In addition, whilst the existing surfacing is expected to be adversely affected by the additional
trafficking, the type of sprayed sealed used in future resurfacing will also be affected.

A sprayed seal consists of a thin layer of binder sprayed onto a pavement surface with a layer
of aggregate incorporated and which is impervious to water. The seal may contain more than
one application of binder and/or aggregate. In addition, the binder may consist of conventional
Class 170 bitumen or Polymer Modified Binder (PMB). PMB may also have various
concentrations of polymer. There are numerous other types of sprayed seals used to address
specific issues e.g. pavement cracking.

The selection and design of a sprayed seal depends on numerous factors including, traffic
volume and composition of traffic, climate, topography, vertical and horizontal alignment,
existing pavement condition etc. Generally, conventional sprayed seals placed over existing
pavements, which are in sound condition, would consist of Class 170 binder and an application
of aggregate, referred to as a single/single (s/s) sprayed seal. Multiple application seals are
generally described in sequence of application of binder and aggregate. A double/double (d/d)
sprayed seal is two applications of binder and two applications of aggregate. A single/double
(s/d) is a single application of binder and a double application of aggregate.

Increases in traffic volumes will require more robust sprayed seals to be used moreso in
stressful locations e.g. steep grades, small radius curves etc. Guidance on the impact of traffic
on sprayed seal type is provided by Austroads (2013). A summary of the possible changes are
provided in Appendix A. The impact is more pronounced for pavements of low traffic volumes.
Note, the cost of sprayed seals incorporating PMB rather than Class 170 bitumen and/or
multiple application of binder and/or aggregate will be more costly than the conventional Class
170 s/s sprayed seal. In some locations asphalt may be required. A more detail estimate of the
impacts of the additional loading can be determined through site inspections and detailed
design.

8
Doc ID 178428591/v1
7. PREDICTING PAVEMENT DETERIORATION AND COSTS
Section 6 discussed the impact that the additional Project generated traffic loading may have on
pavement performance. An assessment of pavement structural deficiency has been provided in
addition to the possible impact on the existing pavement surfacing. Whilst it is difficult to predict
to what extent and severity pavement distress such as potholes, edge breaks etc. will become
evident over the next 9 years that can be attributed to Project operations traffic, it is clear that
the Project loading will accelerate pavement distress moreso where there is a significant
increase in traffic loading. This is expected to lead to:
increase in routine maintenance;
increased the frequency of periodic resurfacing; and
the need for earlier pavement rehabilitation.

Austroads (2012) Preliminary Methodology for Estimating Cost Implications of Incremental


Loads on Road Pavements notes increasing traffic loading increases the rate of pavement
deterioration and affects agency costs over the life-cycle of a in service pavement in the
following ways:
i) time interval to the next rehabilitation intervention reduced;
ii) granular resheeting thickness increased;
iii) resealing frequency and quality may increase (depending existing surfacing
performance and the road agencys maintenance practices).

Items ii) and iii) were discussed in Sections 6.3 and 6.4 respectively.

In addition, Austroads (2012) noted that if funds required to rehabilitate pavements are not
available, at an earlier time, traffic loading increases may lead to:
- more frequent resealing or higher quality reseals used to reduce increases in routine
maintenance costs due to the higher rate of surface deterioration
- higher quality reseals or alterative surfacings (e.g. asphalt) used in locations
(intersections, grades and curves) where higher axle loads cause increased surface
wear
- increases in road user costs and discomfort due to increases in pavement roughness
which increase vehicle operating costs and travel time, and cause additional delay costs
due to more frequent repair works
- more extensive and costly rehabilitation works.

8. SUMMARY

To assess the impact on pavement along sections of various lengths of Benambra Road, Omeo
Highway and the Great Alpine Road, arising from the traffic loading generated from the
Stockman Base Metals Project the following reports were reviewed:

- Stockman Project Environment Effects Statement Independence Group NL;


- AECOM Roads, Traffic and Transport Technical Report - Stockman Environmental
Effects Statement September 2013;
- Sinclair Knight Merz Stockman Project Review of Roads, Traffic and Transport
Technical Report November 2013;
- VicRoads Stockman Base Metals Project EES.

In relation to pavement condition and deterioration, the AECOM and Independence Group
reports provide little detail. Traffic data sourced from the AECOM report, combined with an
understanding of existing pavement composition and utilising appropriate Austroads and
VicRoads publications, indicates that traffic generated from the Stockman Base Metals Project
will:

- lead to increased pavement distress;

9
Doc ID 178428591/v1
- increase the likelihood of flushing of existing sprayed seal surfacing necessitating the need
for treatments to address skid resistance deficiencies;
- impact on the type of future sprayed seal treatment required.

Further investigation to predict the extent and severity of pavement distress and when it is likely
to occur is required. A detailed site inspection is also recommended.

9. DECLARATION

I have made all the inquiries that I believe are desirable and appropriate and there are no
matters of significance that I regard as relevant which, to the best of my knowledge, have been
withheld from the Panel.

Andrew Papacostas
Principal Advisor Pavements, Geotech. & Materials
VicRoads

10. REFERENCES

Austroads (2012) Guide to Pavement Technology Part 2: Pavement Structural Design

VicRoads (2013) Code of Practice RC 500.22 Selection and Design of Pavements and
Surfacing

Austroads (2013) Guide to the Selection and use of Polymer Modified Binders and Multigrade
Bitumens

Austroads (2013) AP-T236-13 Update of Double / Double Design for Austroads Sprayed Seal
Design Method

Austroads (2012) Preliminary Methodology for Estimating Cost Implications of Incremental


Loads on Road Pavements

10
Doc ID 178428591/v1
APPENDIX A

CHANGE IN SURFACING REQUIREMENTS

Traffic Characteristics Typical Existing Surfacing Typical Future Surfacing


Treatments Treatments

Low traffic volumes, Single/single (s/s)sprayed seal The increase in large heavy
<750 v/l/d (AADT < with conventional class 170 vehicles puts this at the limit of s/s
1500) (C170) bitumen C170 seals.

Non stressed areas i.e. For those areas not clearly defined
Straights with flat grades as having no stress or high
stress a d/d C170 seals or s/s
seals incorporating PMB at low
levels of modification e.g. High
stress seal (HSS) may be
required.
Low traffic volumes, D/d seal with C170 bitumen or s/s Conventional C170 bitumen no
<750 v/l/d (AADT< seal with a polymer modified longer appropriate.
1500) binder E.G. HSS type treatment.
Increasing the proportion of heavy
Stressed areas i.e. vehicles results in the need for a
Straights with small more robust sprayed seal.
radius curves, grades Possibly a d/d sprayed seal with
>5% etc PMB.

Existing treatment type expected


to be suitable for straight sections
with steep grades. However, given
the topography of the area these
may be limited and the d/d with
PMB binder may be more
appropriate.
Medium traffic volumes, Either d/d seals with C170 binder No change in sprayed treatments
>750 v/l/d (AADT>1500) or s/s seals with a PMB e.g. HSS could generally be adopted
type treatment.
Non stressed areas i.e.
Straights with flat grades
Medium traffic volumes, D/d seals with a PMB e.g. HSS Generally the existing treatments
>750 v/l/d type treatments are suggested as being
(AADT<>1500) appropriate as they generally
Straight sections with grades (but already incorporate d/d seals with
Stressed areas i.e. no curves) could use d/d seal with PMB. However the more highly
Sections with small C170 binder or s/s seal with a stressed areas may require higher
radius curves, grades PMB e.g. HSS type treatments. grade PMB in d/d seal treatments
>5% etc Given the topography of the area e.g. Extreme Sprayed Seal (XSS)
these are likely to be very limited type treatment.
and a d/d PMB seals would be
more appropriate. In some cases such as very tight
curves in steep areas an asphalt
treatment may be required.
v/l/d vehicles per lane per day

11
Doc ID 178428591/v1
APPENDIX B
Name
Andrew Papacostas

Address
12 Lakeside Drive Burwood East Victoria 3151

Qualifications
Bachelor of Civil Engineering (Honours) Monash University
Master of Technology (Pavements) Deakin University
Member, Engineers Australia

Experience
I have approximately 29 years experience as a civil engineer in the road building and maintenance
industry, 24 years of which have been specialising in road pavement technology.

I am currently the VicRoads Principal Advisor Pavement, Geotech. & Materials. In this and previous
roles I have been responsible for providing VicRoads with independent technical advice relating to
pavement technology issues.

Areas of Expertise
I have substantial experience and expertise in road construction and maintenance, specialising in
pavement technology, which includes the design, rehabilitation, and maintenance of pavements,
pavement strength and skid resistance testing, road condition data interpretation, aggregate and soils
materials testing, preparation of design guides and standards.

Expertise to Prepare this Assessment


My experience and expertise as detailed above includes the provision of pavement design and
rehabilitation advice for numerous projects. I have undertaken many assessments of existing
pavements to assess rehabilitation requirements including the interpretation of traffic loading and road
condition data and predicting pavement performance.

Instructions
I have been requested by HWL Ebsworth Lawyers on behalf of VicRoads, to provide an expert
opinion report in relation to the impact on pavements along sections of various lengths of roads
(Benambra Road, Omeo Highway and the Great Alpine Road), arising from the traffic loading
generated from the Stockman Base Metals Project.

Facts, Matters and Assumptions Relied Upon


- Stockman Project Environment Effects Statement Independence Group NL
- AECOM Roads, Traffic and Transport Technical Report - Stockman Environmental Effects
Statement September 2013
- Sinclair Knight Merz Stockman Project Review of Roads, Traffic and Transport Technical Report
November 2013
- VicRoads Stockman Base Metals Project EES.
- Austroads (2012) Guide to Pavement Technology Part 2: Pavement Structural Design
- VicRoads (2013) Code of Practice RC 500.22 Selection and Design of Pavements and Surfacing
- Austroads (2013) Guide to the Selection and use of Polymer Modified Binders and Multigrade
Bitumens
- Austroads (2013) Update of Double / Double Design for Austroads Sprayed Seal Design Method
- Austroads (2012) Preliminary Methodology for Estimating Cost Implications of Incremental Loads
on Road Pavements
- relevant experience.

Identity of Persons Undertaking Work


Andrew Papacostas as per the evidence statement.
Colin Dailey Specialist Sprayed Seal (VicRoads) assisted with preparation of Appendix A of the
evidence report.

Summary of Opinions
See Conclusions section of the evidence statement

12
Doc ID 178428591/v1
APPENDIX C
Curriculum Vitae
ANDREW PAPACOSTAS

SUMMARY
More than 25 years in the road building industry with experience in construction, design and
specialising in pavement technology. Currently VicRoads Principal Advisor Pavements, Geotech, &
Materials.

PROFESSIONAL EXPERIENCE AND ACHIEVEMENTS

VICROADS 1985 - PRESENT


Principal Advisor Pavements, Geotech. & Materials 2013 - Present
Principal Advisor Pavements & Materials 2009 2013

Principal advisor on all matters pertaining to pavements and road building materials to VicRoads,
Victorian Government and the road based transport industry.
Provides technical leadership in the development, interpretation and maintenance of policy,
technical standards and asset management related to the pavements and road building materials
discipline in Victoria.
Leads the development and sustainability of pavement and road building material technical
expertise within VicRoads Technical Services, and contributes to this in the wider VicRoads
organisation.
Assesses the performance of pavements, surfacings and road building materials.
Represents VicRoads at state and national level (i.e. Austroads, Standards Australia), keeping
abreast of and contributing to emerging pavement and road building materials issues and
developments.
Academic Board member for the Centre for Pavement Engineering Education
Manager Pavement Technology Services 2003 - 2009
Successfully led, managed and provided technical direction of VicRoads Pavement Technology
Services group comprising professional, technical and field staff including external consultants and
contractors
Represented VicRoads at numerous national forums including Austroads
Sought after to participate on various State Road Authority expert panels
Established strong links with key areas including the private sector, State Road Authorities,
VicRoads
Academic and Council Board member for the Centre for Pavement Engineering Education
Member of drafting committees for various key national pavement technology publications
Reviewed and prepared numerous VicRoads specifications, design guides, test methods and other
publications
Presented papers at national forums

Section Leader - Pavement Design & Testing Team 1992 - 2003


Managed, developed, and provided technical direction of VicRoads Pavement Design and Testing
Team comprising professional, technical and field staff including external consultants and
contractors
Led the delivery of a successful pavement design consultancy service, pavement strength and skid
resistance testing
Provided expert advice on pavement design and related issues including during all stages of
pavement construction and earthworks
Conducted training courses for Industry & Government Sectors & presented at numerous
International, National and State forums
Active member of various Austroads pavement related working groups
Recognised national pavement design expert
Member of working group for various Austroads publications including: draft 2001/2003 Austroads
Pavement Design Guide; draft 2001 Austroads Pavement Rehabilitation Guide; Guide to The
Stabilisation of Roadworks; A Guide To the design of New Pavement for Light Traffic
Assigned as Principal Pavement Consultant for the Melbourne Grand Prix Track
13
Doc ID 178428591/v1
Undertook successful Research & Development Projects including: The Performance of Thin
Asphalt Surfacing; The Performance of Cemented Materials; and The Performance of Stabilised
Pavements
Co-authored Master of Technology (Pavements) Pavement Design Unit on behalf of Deakin
University and AUSTROADS
Developed pavement design procedures for Design & Construct Contracts
Reviewed pavement designs for all VicRoads Major Projects including 20km of Western Ring
Road
Designed new and rehabilitated pavements for various projects including the $200 million Geelong
Road Upgrading Project

Overseas Projects Corporation of Victoria - Specialist Pavement Engineer 1993 - 1994


Assisted in the development of a Pavement Management System and overlay design procedures
for Hong Kong Highways Department based in Hong Kong
Pavement Engineer Pavement Section 1990 - 1992
Prepared pavement designs and rehabilitation treatments for a wide range of both flexible and rigid
pavements
Assessed pavement through visual inspection, the use of various structural testing devices and
materials testing
Provided technical advice in the use of data for Pavement Management Systems

Road Design Engineer 1988 to 1990


Provided advice to VicRoads operational areas and major projects on all aspects of road design
Designed sections of Western Ring Road including stormwater drainage, cross-sectional design
and noise attenuation
Designed sections of the Western Freeway Ballarat By Pass including cross-section details and all
aspects of drainage including retarding basins

Construction Engineer 1985 to 1988


Hume Freeway Benalla and Winton By Passes
Directly supervised and administered construction of a 6km sealed access road, earthworks
construction of freeway tie-ins, construction of 3.2km of access road, installation of 25km of
subsurface drainage, construction of 0.8km of Hume Highway deviation (by VicRoads direct
labour), installation of signs and guard fence throughout 35km of freeway as required.
Assisted in the direct supervision/contract administration of crushed rock pavement construction
and associated works for 16km of dual carriageway freeway work (by VicRoads direct labour
Prepared contract specifications for earthworks construction, asphalt placement on bridge decks,
subsurface drainage installation, guard fence construction, and signing erection
Provided daily site engineering supervision of VicRoads day labour crews on various tasks

PROFESSIONAL QUALIFICATIONS

Academic
Master of Technology (Pavements) - Deakin University 2000
Bachelor of Engineering (Civil) with Honours Monash University 1985

Affiliations
Chartered Professional Engineer
Member - Institution of Engineers, Australia

14
Doc ID 178428591/v1

Das könnte Ihnen auch gefallen