Automated PM
Defect Notification
PLan
Can Work can be carried Issuer to issue the
YES Safety Document to
out by limiting the Permit ACCESS
work area Authorized acceptor
Work Order Created both SAP and physically.
NO PERMIT
NO
Work order technically
Apply Suitable Alternate
completion and closure
System of work
Sub work order flow for additional work identified during the work
NO PERMIT
Sub Work Order submitted for Safety
document only with the additional Can work be
steps as the main work order remain YES Acceptor to accept the
completed
active safety document SAP
With
and physically
equipment PERMIT ROSH
isolated
NO
Work is part of
System NO PERMIT TEST Acceptor to conduct the
Point of Work Risk
YES
Assessment , check the
Does work require implementation of
YES Restoration of control measures and
System Hazard PERMIT LIVE
follow the supervision
methods as required in
the safety document
Any
Inherent Danger
from System
YES
YES
Safety Controller
If Required Material
review and
Task List Defined and to be issued at
Preparations
Reviewed Store
Safety controller
prepares the permit
NO NO for issue
Material Required Service Required
Acceptor to accept
the permit in SAP
and physically
YES YES
YES Service PR Created and
Purchase process
follows
Material Acceptor to perform the POWRA and implement
in Store necessary control measures
NO Service is ready
Perform the work as per Task list.
PR Initiated Purchase
process follows
Cancel the permit in SAP and Return the Hard copy
to issuer
PR Initiated Purchase
process follows Complete service completion and technical
completion ( if any material adjustments)