Sie sind auf Seite 1von 2

GOVERNMENT OF ANDHRA PRADESH

ABSTRACT
ESTABLISHMENT Water Resources Department APIES Compliance of Order
dt:18.02.2016 in Civil Appeal No.4142 of 2004 and order dt.14.07.2017 in
Contempt petition (C) No.770/2016 of Honble Supreme Court of India Notional
promotion/promotion to certain Deputy Executive Engineers to Executive
Engineers; Executive Engineers to Superintending Engineers and Superintending
Engineers to Chief Engineers Withdrawal of In-charge arrangements as
Superintending Engineers - Orders Issued.
------------------------------------------------------------------------------------------------------
WATER RESOURCES (SERVICES.II) DEPARTMENT
G.O.Rt.No. Dated:02.12.2017
Read the following:
1. From the Honble Supreme Court of India Order dt:18.02.2016 in Civil
Appeal No.4142 of 2004 and Order dt.14.07.2017 in Contempt Petition (C)
No.770/2016,
2. GO Ms No.67, Water Resources (Ser.II) Department, dt:23.10.2017.
3. GO Ms No.70, Water Resources (Ser.II) Department, dt:03.11.2017.
4. GO Ms No.72, Water Resources (Ser.II) Department,dt:07.11.2017.
5. GO Ms No.73, Water Resources (Ser.II) Department, dt:07.11.2017,
6. From the Engineer-in-Chief(AW), WR Dept., AP,. Vijayawada Lr
No.Rc/ENC/B3/17011324/2017-5, dt:09.11.2017 and 27.11.2017.
&&&&

ORDER:

In compliance to the Honble Supreme Court of India Order dt:18.02.2016 in


Civil Appeal No.4142 of 2004 and Order dt:14.07.2017 in Contempt Petition (C)
No.770/2016, the panels for promotion to the post of Superintending Engineers
have been placed before the Departmental Promotion Committee (DPC).

2. Accordingly, the eligible Engineers have been promoted as Superintending


Engineers in the reference 3rd read above as recommended by the DPC.

3. As per the finalised Seniority List and orders issued for promotion as
Superintending Engineers in the reference third read above, the following
Engineers are not found to be within zone of consideration for the promotion to the
posts of Superintending Engineers, though, they are currently working as I/c.
Superintending Engineers:

1 KVLNP Chowdary Irrigation Circle, Guntur


2 N Ram Babu SRBC-I, Nandyal
3 P Ranga Rao P&M Cell, Vijayawada
4 B.V. Subba Rao Irrigation Circle, Ananthapur
5 R.Sri Rama Krishna Irrigation Circle, Chittoor
6 S.Chadra Sekhara Rao Irrigation Circle, Kurnool
7 R.Nageswara Rao Irrigation Circle, Visakhapatnam
8 K Narasimha Murthy O/o, Commissioner, CADA, Vijayawada
9 D. Rama Gopal O/o, C.E,Medium Irrigation, Vijayawada
10 L.V.Ramana Murthy PPMU Unit, Vijayawada
11 S. Sugunakara Rao PIP LMC, Tuni
12 N.V.Ramana Hydrology, Vijayawada
13 D.Tirumal Rao TTPR Circle, Vizianagaram
14 S.Venkata Ramana Rao PPMU, NSP, Guntur
15 B.Ram Babu Irrigation Circle, Dowlaiswaram
16 U.Yastika D&QC,KCCMP, Kadapa
17 P.Rama Krishna Murthy S.E, Hydrology
18 K.Srinivasa Rao Irrigation Circle, Eluru
19 M.Sanyasi Naidu Designs & Q.C Circle, O/o NTR TGP, Tirupathi

4. In view of the above circumstances, the Government, after careful


examination of the matter, hereby direct the Officers mentioned in para 3 above to
get themselves relieved from their In-charge arrangements immediately and report
to the Government for further posting orders.

5. The Engineer-in-Chief (AW), Water Resources Department, AP, Vijayawada


shall take further necessary action accordingly.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)

SHASHI BHUSHAN KUMAR


SECRETARY TO GOVERNMENT
To:
The Individuals through the Engineer-in-Chief (AW), Water Resources Department,
A.P, Vijayawada
Copy to:
The Engineer-in-Chief (AW), Water Resources Department, AP, Vijayawada
The Chief Engineers concerned
The Director of Treasuries & Accounts, Andhra Pradesh, Vijayawada
The Accountant General, AP, Hyderabad
The Pay and Accounts Officer concerned
The PS to Honble Minister (WRD); SF/SC.

//Forwarded::By Order//

Section Officer

Das könnte Ihnen auch gefallen