Dear Customer:
Please provide us the following details to enable us to calculate and design the proper dehumidification system:
____________________________
Room Dry Bulb Temperature to be maintained.
____________________________
% Relative humidity (RH) to be maintained inside the Room. (+/- 5% tolerance band)
____________________________
Door size (in sq.ft. or sq.m.) and approximate number of times it is opened every hour.
____________________________
What materials were used to construct the room? (E.g.: Concrete , Metal Sandwich Panels, etc)
____________________________
Supply air quantity from air-conditioning unit or Room Sensible Load with Inlet air temperature to
room (If Available).
____________________________
How many people or occupants are inside the room?
____________________________
What type of process / application the room is used for?
____________________________
____________________________
(b) Final Moisture Content or Weight of product after drying.
____________________________
(c) Any critical limit on air temperature and humidity for drying the product?
____________________________
Any water body or open surface of water inside the room (e.g. water trays or buckets)
____________________________(Surface Area)
FRESH AIR quantity being taken inside the room (CFM or CMH), whether treated or not
(Condition and qty. of fresh air entering the room if any).
_________________________
If there is any fixed opening inside the room then the details of the same (L x H x Depth).