Equation Before:
Price = Cost + Profit
Equation Now:
Profit = Price - Cost
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Q C P
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Reactive Quality
Proactive Quality
Quality Checks (QC) - Taking the Six Sigma ISO 9000, ISO CMM
Create process that will produce
defectives out of what is produced
less or no defects Lean 14000 etc.
Malcolm Baldrige
Sharing
Scientific way to Best practices
Benchmarked
improve to build
practices-
Historically capability? capability
Contemporary Standardizing
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
1
What is Six Sigma? What is Six Sigma?
Six Sigma is not: products and processes
For a process, the sigma capability (z-value) is a measure that indicates how
Sigma is a measure of Variation.
well that process is performing. The higher the sigma capability, the better is
Variation is a natural phenomenon. No process can produce exactly same the process.
output every time.
Sigma capability measures the capability of the process to produce defect-free
Lesser is the variation, more is the confidence on process. outputs. A defect is anything that results in customer dissatisfaction.
The term Sigma is a statistical measure called Standard deviation used to
measure the variation of a process
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
68.26%
95.5%
1 99.73%
2
3
1 1 2 2 3 3
Average-3 Average+3
68.26% 1
Average
95.45%
2
If the data are generated from a process in statistical control, the data as 99.73%
a group tend to form a stable pattern called a normal distribution curve or 3
bell shaped curve.
The spread of normal distribution curve is 3 from average (99.73%
observations) -2 -1 X=0 1 2 3
-3
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
2
Measure of Quality
Meaning of Sigma
182 186 192 192 196
Scrap
192 190 198 197 193
Specification
193 199 200 196 196
196 196 197 187 194
Upper
193 192 192 196 197
Limit
201 190 187 193 197
197 195 196 190 196
3
190 198 188 202 192
195 194 190 198 193
198 189 194 200 204
Specification
2
Average - 3 = 194.2 3*4.4 = 181
Lower
Limit
100% observations are between 181 & 207
Scrap
Average+2 = 194.2+ 2* 4.4 = 202
194.2-3*4.4 194.2+3*4.4
Average - 2 = 194.2 2*4.4 = 186
96% observations are between 186 & 202
194.2
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Specification
Specification
Upper
Upper
Limit
Limit
3
3
Specification
Specification
4
3
Lower
Lower
Limit
Limit
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Upper
Limit
Limit
3
Specification
Specification
5
Lower
Lower
Limit
Limit
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
3
Path to Six Sigma Path to Six Sigma
A 3 process because 3 standard deviations
fit between target and spec
6 Sigma
Target Customer
3.4 Defects Specification
Before
1
3
5 Sigma
Sigma levels and 6.6% Defects
233 Defects 2
Defects per million
opportunities (DPMO) 3
Customer
After
2 Sigma
5
308,537 Defects 6
GE
GE The GE model for process improvements
the
the company
company that
that perfected
perfected Six
Six Sigma
Sigma
Jack Welch launched Six Sigma at GE in Jan,1996 Define Measure Analyze Improve Control
1998/99 - Green Belt exam certification became the criteria for management
promotions Combination of change management & statistical analysis
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
4
The Growth of Six Sigma The Approach
Practical
Problem
Statistical
Problem
Statistical
Solution
Practical
Solution
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Methodology Define
D Identify and state the practical problem D VoC/VoB - Who wants the project and why ?
Define Define
M Validate the practical problem by collecting data M The scope of project / improvement
Measure Measure
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Measure Analyze
D Ensure measurement system reliability D
Define Define
M M
Measure Measure Understand statistical problem
C C
Control Baseline current process capability/ Sigma level Control Identify drivers of variation (significant factors)
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
5
Improve Control
D D Ensure measurement system reliability for
Map improved process
Define Define significant factors
M M
Measure Measure
Improved process capability
Pilot solution
A A
Analyze Analyze
I I
Improve Improve Sustenance Plan
- Statistical Process Control
Identify operating tolerance on significant factors
C C - Mistake Proofing
Control Control - Control Plan
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
V
Validate
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Design
Design (detailed) the process to meet the
customer needs
Verify
Verify the design performance and ability
to meet customer needs
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
6
Six Sigma - Three Dimensions
Customer Process A Process B Vendor
Customer Process A Process B Vendor
Driven by
customer
needs
Process Map Analysis
Six
Six Sigma
Sigma Organization
Organization
LSL US
L
Methodology
Led by
Senior
Mgmt Upper/Lower
specification
limits
Organization Tools
Regression
35 100%
30
80%
25
20 60%
15 40%
10
20%
5
Process variation 0 0%
Enabled by quality
L K A F B C G R D
team.
Frequency Cumulative Frequency
Pareto Chart
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Fulltime
timeresource
Each BB handles 1-2 projects
resource
--Deployed
Deployedto tocomplex
complexororhigh
high
risk
riskprojects
projects All Functional department Team members
Green Belt
Green Belts That will Support BBs; 1-2 projects each
Green Belt
--Part
Parttime
timeor
orfull
fulltime
timeresource
resource
Green Belt
--Deployed
Deployedto toless
lesscomplex
complexprojects
projects Operator and Workmen Yellow Belt
ininareas
areasof
offunctional
functionalexpertise
expertise 25% of workmen
Understanding values of Six Sigma and helps GBs, BBs in data collection
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Highly paid!
Work like a Consultant!
Huge demand in the industry!
Overall
OverallA high flying Career!!
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
7
Six Sigma Application Six Sigma Application
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Books
Websites
www.treqna.com
www.isixsigma.com 16 STEP PROCESS IMPROVEMENT
www.moresteam.com
------ DMAIC ------
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
8
Where to start?? Tools & Methods Whats next?? Tools & Methods
1 Understand customer/business requirements 4 CTQ Flowdown to Product reqmt and Detailed Process
Understand VOC: Map
Interviews components
Surveys FMEA
Focus Groups C & E matrix
Affinity diagram High Level Pareto
Kano Analysis
COPC
DMAIC -- Measure
DMAIC -- Define 5 Data Collection Plan and Asses Capability on
measurable Ys
Benchmarking
2 review product/process CT s QFD Baseline
SIPOC Center Limit
HOW 1
HOW 2
HOW 3
HOW 4
HOW 5
HOW 6
HOW 7
Theorem
LSL USL
Need 1
Need 2
5
5
H L
H
L M 65
45 6 Establish measurement system capability Sample size
Need 3
Need 4
3
4 H
M M L
21 calculator
Need 5
Need 6
2
4 M
L
L H
M 36
8 MSA
Need 7 1 L M 52
40 psi
3 mils
8 atm
1 mm
12 in.
3 lbs
4
3
57 41 48 13 50 6 21
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Whats next??? Tools & Methods Whats next??? Tools & Methods
7 Understanding the relationship between Y and X Graphical tools 10 Understanding Improvement Drivers Model DOE
Brainstorming Prediction Regression
Correlation & Minitab
Regression Analytical /
Simulation
8 Understanding the statistical significance of X Multi Vari analysis
Hypothesis Testing
Correlation
Regression DMAIC -- Improve
DMAIC -- Analyze Screening DOE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Whats next??? Tools & Methods Whats next?? Tools & Methods
12 Optimize Response -- Make Robust to noise Optimization 14 Statistically validate/verify and Standardize Assess Performance
variables DOE Failure Modes
Process mapping Hypothesis Testing
5S
1
3.0SL=4.506
Mistake Proofing
DMAIC -- Control
Sample Mean
2.5 -3.0SL=2.494
0 10 20 30 40 50 60
Sample Number
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
9
Define Phase
The various stages of the Define Phase are:
Generate
Define Screen
Project Ideas
Prioritize
Select
Develop
Charter
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
There are various sources used to identify a project: Voice of the Customer (VOC) or Market
- Four Voices Hear the emotional outburst of the customer
- Voice of Business VOB Do a self review in comparison to the competitors
Example Coffee delivered by you is not as tasty as served by
- Voice of Customer VOC Mestle
- Voice of Employee / Associate VOE VOB
- Voice of Process - VOP Check if the business goals are being met and identify the gaps
- Cost of Poor Quality COPQ Find the opportunities for improvement
There are three language processing tools used to process the Example We have not been able to meet our annual plan for our
Cash flow in this fiscal year.
potential ideas generated from above sources
- Affinity Diagram VOE
Take feedback from employees in further identifying the scope.
- Interrelationship Diagram
Example A sudden increase in the number of people are falling ill.
- Goal-Means (GM) Diagram / Tree Diagram
- QFD
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
the cycle time for the product still remains the same Appraisal Cost Failure Cost 20%
COPQ from QA, Internal Audits and Management Engineering. Internal Failure External Failure 0% Average
US
Ex. Correcting Ex. Handling Customer Complaints company
Example The field failures have risen suddenly in last few World
erroneous invoices Class
months.
company
6 5 4 3 2
Sigma Level
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
10
COPQ: Quality Paradigm
Sigma V/s COPQ
30%
Does Improving Quality Increase Cost?
2
15%
4
4 5 5
6 10%
Quality Quality
5% 6
Paradigm Shift 69% 93.3% 99.4% 99.98% 99.9997%
COPQ REDUCES WITH THE IMPROVEMENT OF QUALITY RTY (% DEFECT-FREE)
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Exercise Solution
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
11
QFD (Quality Function Deployment) Use of QFD with other tools
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Importance
Complaint
The voice Customer
rating
of the competitive
customer evaluations
What that customer said? - How the customer rate your companys
Customer
Technical portions their wants and needs product or services against those of
portions your competitors?
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Screening
Project ideas
generated
Developing a new
strategy /
structure/design? YES Check how Six Sigma can support the
new strategy / structure / design?
NO
Is the problem
chronic? Check how Six Sigma can support the
NO
new strategy / structure / design?
YES
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
12
Exercise Prioritization Matrix
4. Reduce effect of temperature on PCBs while soldering Weight 1- 5 to 6 1- less than 1- less than 1- No link 1- One time 1- 0 to 50%
5. Increase customer satisfaction index months
3- 3 to 4
50%
3- 50 to 80%
50k USD
3- 50 to 100
3- Directly
linked
3- Short
term
3- 50 to 80%
5- 80-100%
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Classify the following costs as Six Sigma tangible (SST), in-tangible savings (SSIT), or
non-Six Sigma benefits (NSS).
Project Charter
1. Promotion activities increased sales by 20% of advertising cost.
2.
3.
Reduced soldering defects thereby reducing the cost on rework.
5S activities helped gain ISO 9001:2000 for the organisation
Is a Document that Lists
4. Increase product prices by 7% as the raw material price is increased by 5%.
5. The time required to approve the use of new low-cost materials is reduced from an Purposes and Goals
average of 10 days to 5 days.
6. Process simplification reduces the cycle time of a cycle of a cycle by 4.5 minutes
per product. On average, 50 more cycles are produced every day. There is no
for the Project
change in overtime or staffing levels.
7. Carbon is cheaper than rubber and added as 2% of the total compound weight. I
reduce the recipe consumption of carbon by 1% and (had to) increase the rubber
consumption by same amount.
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
13
Project Charter: Problem & Goal Project Charter: Problem & Goal
Statement Statement
The project statement and objective should (together) be - SMART Example:
S: Specific: Stretchable Problem Statement - Our Customers Are Not Paying Credit
Card Dues on Time
M: Measurable
Goal - We intend to reduce the no. of delayed
A: Attainable / Aggressive credit card statements.
T: Time Bound Problem Statement In the last 10 months (when) in the Asia Oceania region
(where), 20% of our credit card users are more than a month late (what) in
Should include NO BLAME, NO SOLUTION, NO CAUSE paying the dues. The percentage of late payments is up from 10% in 2004-
05 to 30% of outstanding receivables (Magnitude) in 2005-06. This is
negatively affecting our recoverable cash flow (impact) by 1000K USD /
year.
Goal: To reduce the percentage of late payments to 15% in next 3 months, and
give tangible savings of 500 KUSD / year
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Example:
Answer the following questions to determine the scope of your
Problem Statement - Our Customers Are Not Paying Credit Card project
Dues on Time
Why is the project worth doing?
Goal - We intend to reduce the no. of delayed credit
card statements. What process will the team focus on?
Improved Example: What are the boundaries of the process to be improved? Start point? Stop
point?
Problem Statement In the last 10 months (when) in the Asia Oceania
region (where), 20% of our credit card users are more than a month Who are the stakeholders?
late (what) in paying the dues. The percentage of late payments is What resources are available to the team?
up from 10% in 2004-05 to 30% of outstanding receivables
(Magnitude) in 2005-06. This is negatively affecting our recoverable What (if anything) is out-of-bounds for the team?
cash flow (impact) by 1000K USD / year. Under what (if any) constraints must the team work?
Goal: To reduce the percentage of late payments to 15% in next 3 What is the time commitment expected of team members?
months, and give tangible savings of 500 KUSD / year
What are the returns to each team member for the time commitment?
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Team
Identify the departments closely associated with the problem
Together
Purpose Procedures Choose a representative from each departments
Each one Check authority, responsibility, and knowledge of each member
Roles Relationships
Achieves Any change triggers resistance. Sometimes the resistance is so
strong that it becomes the cause of failure of project.
More
There are active and passive resistors. Passive are difficult to
Characteristics of an Effective handle.
Team Informality
Resistance is a part of the scope of the project and should be
Clear purpose (goal) Contribution
handled at the earliest.
Leadership Constructive disagreement
Committed Consensus decision There is nothing more difficult to take in hand more perilous to
Interaction Open communication
Regular Reviews
conduct, or more uncertain in its success, than to take the
Synergy
Share responsibility lead in the introduction of a new order of things. Nicolo
Clear roles Machiavelli
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
14
Calculating Financial Benefits
Calculating Financial Benefits
Interpretation of cost savings expected from a Six Sigma Project varies The reported benefits must be directly linked to Six Sigma project, that
from organisation to organisation is, those which would not have been realized otherwise.
Primarily, two types of benefits can be achieved tangible and intangible Expenses on the project must be subtracted to get the net benefit from
Tangible the project
Tangible benefits typically have clear, measurable, positive impacts A financial analyst must be a member of the project so that all the
on income statement or balance sheet. financial calculations are verified and approved by him. The project
sponsor must be made a part of the analysis.
General categories
Following are the various categories of tangible benefits:
Growth (incremental earnings)
Cost takeout Earnings
Cash flow 1. Earnings due to Increased capacity.
Intangible 2. Earnings due to Improved Product Quality / Service Levels.
May be difficult to quantify but could be substantial. Example: 3. Price Adjustment / Concession Expenditure Reduction due to Improved
Cost avoidance: NVA to VA Product Quantity / Service Levels
Customer satisfaction or employee satisfaction 4. Increased Net Sales by reduction in discounts and credits
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Cost Takeout
Scrap / Rework Reduction
Staffing or Overtime Reduction
Direct Labour Utilization (Increased Efficiency)
Reduced Operating Expenses
Measure
Material Cost Reduction
Operating Cash Flow
Reduced Accounts Receivable
Increased Accounts Payable
Reduced Inventory
Reduced Plant and Equipment from Increased Capacity or Efficiency
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
15
DPU/DPMO RTY/FTY
Defect is anything that results in customer dissatisfaction or non Rolled throughput yield (RTY) is the final cumulative yield when there are
conformance. several processes connected in series.
Unit is the number of parts (or assemblies) inspected. RTY is the amount of non-defective products produced in the final process
compared with the total input in the first process.
Opportunity is a characteristics that s inspected
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
LSL USL
3 4
Smaller is the Variation, Higher is the value of Sigma Level and better is the process/ product LSL USL LSL USL
performance
16
Variation Variation
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Time A
Time B
Time C 1.5
Time D 12
LSL USL
7.5 4.5
Time E
Long term (sustained)
Performance
Dynamic Process 3.4
Shortest distance from mean and
closest specification limit is 4.5 sigma PPM
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
12
17
Data Collection
Calculating Sigma Level
The next step is to collect data and perform
Sigma Level Measurement system and Process capability
- Long term (Zlt) analysis. Based on metric chosen for y, historical data is
Collect enough data. Find % defectives. Find Z values
taken. In case , the data is not already available, it may
- Short term ( Zst) be collected for a justifiable period. During data
Zst= Zlt+1.5
collection, following things have to be taken care of
Involve team
Take sufficient data for reliable results
Sometimes high amount of data us required. This
may be difficult, involve high cost, labor, boredom,
redundancy, and may result in erroneous data. In
such for
Criterion cases, Data may be Should
good sample
Represent population
collected
not beon sampling
biased
basis. Should be random
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE LSLNICHE QUALITY SOLUTIONS PVT. LTD., INDORE USL
18
Assessment of Variation: Continuous Data Assessment of Variation: Continuous Data
2Actual (Part) + 2 Meas. System = 2Observed (Total) 2Actual (Part) + 2 Meas. System = 2Observed (Total)
Repeatability Reproducibility Repeatability Reproducibility
GOOD GOOD
POOR POOR
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Process Capability is the capability of a process to meet customer requirement Process Variation:
(Specification limits).
Process capability Index is a metric used to quantify capability of a process.
-3 +3
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
-3 +3 Rejection
Process Variation
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
19
Process Capability Process Capability & Process Performance
Cpk: Cp is potential process capability index when process mean is equal to
This is a capability index which takes process location specification center
as well as the capability in to account. Cpk is potential process capability index when process mean is not equal to
specification center
Pp ( Process performance) is actual process capability index when process
Cpk is calculated as minimum of CPU & CPL where: mean is equal to specification center
Ppk is actual process capability index when process mean is not equal to
CPU=USL- X /3 specification center
Cp= USL LSL
CPL= X - LSL/ 3 6
Cpk = Min. (Cpl, Cpu)
Cp,Cpk The capability index for a stable process. The estimate Cp uses and estimate of standard deviation based on within
sigma is based on within subgroup variation. subgroup variation
Pp,Ppk The process performance index. The estimate of sigma is
Cp = USL LSL
based on total variation.
Think of Ppk as being the actual performance of the process since
its estimate of variation includes ALL observed variation. 6 subgroups
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
6 Overall
Analyze
Where overall
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
20
Process mapping
Objective
The objective of doing project y is to solve the unknown transfer function y =
f(x). After the current performance is available and validated for
Process Mapping:
measurements, the next step is to identify causes x(s) and prioritize.
There are a number of tools to do this. A few discussed here are- Is a graphical representation of activities, steps, information, resources and their
interactions.
Detailed Process Mapping / Process Flow Diagram (PFD).
Process Map is also called a flowchart.
Deployment Flow Chart (DFC)
Process Mapping is a first step in understanding how and why a process
Cause & Effect (C&E) Diagram behaves the way it does.
Pareto diagram
Function Deployment Matrix (FDM)
Affinity Diagram (AD) and Interrelationship Diagram (ID)
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
A process is a series of logical steps that transform inputs (raw materials) Mapping a process has many uses:
in to customer defined outputs.
Compare actual vs. assumed (designed) flow
Identify redundant, duplicate or non value add steps
Identify data collection points in the process
Study interaction and interdependencies between different departments
Identify VA and NVAs and potential Xs
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Yes
Detach cheque Enter in indigenous Provide unique serial
& slip tailor-made software number to cheque
Re-entry of cheque for Print statement & Transfer data file to Submit cheque for
reverification prepare voucher main location clearing to bank
Rectify error
Entry END
Matching?
Yes
No
Go to validation screen
for error finding
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
21
VA and NVA Activities
VA and NVA Activities - Exercise
Real Value-added Classify the following activities as VA or NVA:
Is this step needed to meet a customers demand? 1. Every material bought from vendor is inspected for feasibility in
Does this step add value to the final product or service that is assembly line.
delivered to the customer?
Does this step contribute directly to the customers satisfaction? 2. The semiconductor transistor (a component) is first fixed on a jig
Is the customer willing to pay for this activity? before silica compound is applied on it for heat convection.
Business Value Added 3. Every time there is a service call from the customer, each
Is this step performed to control or manage the business? representative wishes him / her before the issue is discussed.
Is this step a review, an inspection, or approval? 4. The organisation is so quality conscious that it leaves no product
Non Value-Added unchecked before it is dispatched.
Is this step one of storage or waiting time? 5. Whenever I have to call for a meeting, I send a mail to all and also
Does this step include unnecessary transportation or movement remind them an hour before the scheduled time.
of raw materials or products?
VA: Value Added and NVA: Non-Value Added Activity
Is this step performed to overcome an organizational problem?
Is this step necessary to correct errors caused earlier?
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Show the relationships between a problem and its possible causes. Cause Effect
Developed by Kaoru Ishikawa (1953)
Also known as
Machine Method Material
Fishbone diagrams
Ishikawa diagrams
Problem
Statement
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
22
Pareto Diagram Pareto Diagram
Pareto Chart depicts (visually) the total expenses for six months for each
of the five departments.
The Pareto principle is to concentrate on vital few Pareto Chart of Deptt
rather than trivial many . The Pareto diagram is a tool 120000
100
for identifying few actually important causes which have
100000
large contribution for a problem, instead of concentrating Maximum 80
on large number of causes which contributes to a small
Travel Expenses
80000 Contributors
proportion
Percent
60
60000
Paretos Law A relatively small number of causes 40
40000
will typically produce a large majority of the problems
or defects (80/20 rule) 20000 20
0 0
Department D A E B Other
Count 42300 30300 23100 14800 3100
Percent 37.2 26.7 20.3 13.0 2.7
Cum % 37.2 63.9 84.2 97.3 100.0
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
150
Distributions are characterized by :
100 a) location (average or typical value)
50 b) spread (amount of variation)
0
c) shape (the pattern of variation - bell-shaped,
1 10 20 30 40 50 60 70 80 90 symmetrical, etc.)
Observation
Number of runs about median: 40 Number of runs up or down: 72
Expected number of runs: 50.09091 Expected number of runs: 65.66667
Longest run about median: 10 Longest run up or down: 4
Approx P-Value for Clustering: 0.01989 Approx P-Value for Trends: 0.93620
Approx P-Value for Mixtures: 0.98011 Approx P-Value for Oscillation: 0.06380
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
23
Histogram Histogram
Histogram of Casting Hardness
20
15
Frequency
10
0
183 186 189 192 195 198 201 204
Hardness
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
10
0
19.931 19.933 19.935 19.937 19.939 19.941 19.943
Dia
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
24
Scatter plot, Correlation & Regression Correlation Analysis
Scatter plot shows the relationship between input and output variables
whereas correlation analysis quantifies the relationship using
Scatter plot suggests relationship between two variables but correlation coefficient r.
does not quantify it. Value of r can vary between 1 and 1 depending on whether the
Correlation Analysis: A technique to quantify the strength of relationship is positive or negative. It will hold 0 value if there is no
relationship between output and input variable in terms of relationship.
correlation coefficient r.
Regression Analysis: Statistical analysis technique to identify
functional relationship between an input variable x and an output y y
variable y and to predict the output variable using regression
equation which can give the value of output for given input value Decision points
(s).
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Regression Analysis
Scatter Plot
A survey is conducted in a city whereby samples of water
are taken and the salt content is measured. \conduct
regression analysis to find if there is any relationship
between amount of water and salt content. Determine the
regression equation.
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Used to prove which are the factors that are actually impacting the
40
mean or standard deviation of the project.
Salt content (gm)
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
25
Hypothesis Testing
Improve
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
26
Benchmarking Design of Experiments (DOE)
Identifying, Understanding, and Adapting A system is a set of input, process and output where
Outstanding Practices process is the sequence of activities which are
Benchmark performed to give the desired output.
Z Short term
An experiment is a test or a series of tests which are
Baseline
P(x)
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Design of Experiments
Failure Mode and Effect Analysis (FMEA)
DOE Helps in FMEA is a tool that was first used to design aircrafts in 1950s. It forms a
part of Six Sigma learning since it incorporates structured team
Reduce variation and closure conformance to nominal approach to:
Identify the ways in which a process can fail to meet critical customer
Improve yield requirements.
Estimate the risk of occurrence of causes with regard to these failures
Reduced development time
Evaluate the current control measures for preventing these failures from
occurring
Reduced overall costs
Prioritize the causes and develop actions that should be taken to improve
the process.
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
27
FMEA FMEA Continued
Defines Rates the Lists the causes Now how How Rates how RPN is: Documents Actual action Actual Rates how Document Rates how RPN
process step Severity of for each failure often a new well the Sev*Occ actions taken against completion date often a s how the well the number
and failure the Effect to mode; Each particular controls cause or the * Det recommended recommended particular cause is cause or the is
modes. Uses the customer cause is cause or are Failure based on RPN actions cause or currently Failure recalcula
the x-y map on a 1 to 10 associated with a Failure Mode working Mode can pareto Failure Mode being Mode can ted when
process PFD / scale process input occurs: 1= in the now be occurs: 1= controlled now be action is
Process map out-of-spec Not often, 10 process detected 1 = Not often, 10 in the detected 1 = complete
= Very often Detect every = Very often process Detect every d
Lists the Recomm
each Target
Detect Detect
Failure Date
Mode
Cause of failure
Actual completion
Recommended action
Process/Functional
Action Taken
Responsibility and
Detectability
Detectability
Target Date
Occurrence
Occurrence
requirement
Severity
Severity
RPN
date
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
FMEA Continued
POTENTIAL FAILURE MODE AND EFFECT ANALYSIS
(PROCESS FMEA)
Control
Failure e a c P nded e P
Require- of Mech.of Control Control e Completio Taken c t
Mode v s u N Action(s) v N
ments Failure Failure Pre. Det. c n Date u e
s r
t
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Mistake-proofing is:
The control Phase of Six Sigma is used to develop and implement Process A technique to make the happening of errors impossible, making the
Control Plan to ensure sustenance of the improved process system / process fool-proof
Also called Pokayoke (In Japanese)
Objective is to create zero defects
For mistake-proofing, identify repetitive, non-value adding tasks performed
for detection of errors.
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
28
Control Charts Control Charts
Variations occur in all processes Control charts consist of
Random Variation: Center line CL = sample mean m
Natural for the process Upper Control Limit UCL = m+3 standard deviation
Predictable Lower Control Limit LCL = m-3 standard deviation
Occurs randomly over time Control limits are at a distance of 3 standard deviations on
Also called common cause variation either side of the center line.
Generally process remains in control Control chart may be created
Non-random Variation For analysis of the process: for specifications
setting or correction
Not part of the normal operation of the process
For process control: detecting assignable causes
Unexpected, sporadic variation in process and improvement
Result of some specific assignable cause To judge if the product / process under study is
Also called special cause variation acceptable or not
Process goes out of control
Control Charts display the total variation in a process so that it can be
monitored and kept in control (within its operating capability)
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
Steps in creation and analysis of Control Charts Based on the data type, control charts are classified as below:
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
29
Final Steps Final Steps
Process Instructions: Training must be imparted based on the changes suggested by
DMAIC methodology
Must be clearly defined Clear objective
Easy to understand
Documented
Demonstration of skill
Standard Operating Procedures (SOP) Involvement of Process experts and actual workers
Work Manuals Preventive Maintenance
Rules and Specifications Proactive (root caused-based), Predictive (condition-
Approved by authorities based) and Preventive (interval-based) maintenance must
Should include purpose, scope, parameters to control, methods, measurement be done to avoid any Reactive (breakdown) maintenance
techniques, decision criteria, control method, EHS considerations, assumptions (if
any) May address any of the 5M, 1E * inputs to focus on
Reliability and not Repair
* Man, Method, Material, Measurement and Environment
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
NICHE QUALITY SOLUTIONS PVT. LTD., INDORE NICHE QUALITY SOLUTIONS PVT. LTD., INDORE
30