Sie sind auf Seite 1von 166

-1-

Ver-2 KERALA STATE ELECTRICITY BOARD Ltd


Ele.Section : SubDivision : Division :
Name of work :
No Fin.Year Date Sanction Authority
AS No. :
TS No. :
WE Sanction :
Quotation :
Work Order :
Agreement :
Measurement :
S No Key Qty Est Qty Meas #VALUE! Particulars 2016 Unit Rate
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1-

0.00
0.00
0.00
0.00
0.00
Extra Item of Works 0 43078
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Materials Issued #VALUE! ### 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-1-

0
0
0
0
0
0
0
Materials Taken Back 0 0 ### 0

etmuralimohan@gmail.com

List of Contractors
Name Address
1 aaaaaaaaaaaaaaaaaaaaaaaaa AAAAAAAAAAAAAAAAAAAAAAAAAA
2 bbbbbbbbbbbbbbbbbbbbb BBBBBBBBBBBBBBBBBBBBBBBBBB
3 cccccccccccccccccccccc CCCCCCCCCCCCCCCCCCCCCCCCCCCCC
4 dddddddddddddddddddddd DDDDDDDDDDDDDDDDDDDDDDDDDDD
5 eeeeeeeeeeeeeee EEEEEEEEEEEEEEEEEEEEEEEEEEE
6 gggggggggggggggggggggggggg GGGGGGGGGGGGGGGGGGGGGGGGGG
7 hhhhhhhhhhhhhhhhhhhh HHHHHHHHHHHHHHHHHHHHHHHH
8 kkkkkkkkkkkkkkkkkkkkkk KKKKKKKKKKKKKKKKKKKKKKKKKK
9 wwwwwwwwwwwwwwwwww WWWWWWWWWWWWWWWWWW
10 qqqqqqqqqqqqqq QQQQQQQQQQQQQQQQQQQQQ
11 ssssssssssssssssss SSSSSSSSSSSSSSSSSSSSSSSSSS
12 xxxxxxxxxxxxxxxxxxxxxx XXXXXXXXXXXXXXXXXXXXXXXXXXXXX
13 zzzzzzzzzzzzzzzzzzzzzzzzz ZZZZZZZZZZZZZZZZZZZZZZZZZZZZZZ
14 uuuuuuuuuuuuuuuuuu UUUUUUUUUUUUUUUUUUUU
15 ooooooooooooooooooooooo OOOOOOOOOOOOOOOOOOOOOOO
-1-

BOARD Ltd KSE Board Ltd

Circle :

PC Bill

Work Exp - 2016

Rate 0.00 0.00 10% Remark page

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
-1-

0.00 0.00 0.00


0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
43078 0.00 0.00 200 5000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
-1-
-1-

20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
-1-
-1-

40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
-1-
-1-

60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79
-1-
-1-

0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10
-1-

80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99
-1-
-1-
-1-

100
-1-
BO (FTD) No.2495/2016 (No D(D&S)/D6- AE 1/ Proposal 02/ 2015) Dtd Tvpm, 25.08.2016
Key Particulars Unit Rate
101 Surveying one km 11kV line using Theodolite. km 3297.00
102 Surveying one km 11kV line using Ranging Rod. km 2216.00
103 Loading HT PSC pole to Hand cart from the stacking place and unloading the No 270.00
same at work site.
104 Transporting one HT PSC pole by Hand cart (limited to 4km). P/km 270.00
105 Loading HT 'A' type pole to Hand cart from the stacking place and unloading No 299.00
the same at work site.
106 Transporting 'A' type pole by Hand cart (limited to 4km). P/km 335.00
107 Loading HT 4 legged pole to Hand cart from the stacking place and unloading No 399.00
the same at work site.
108 Transporting 4 legged pole by Hand cart (limited to 4km). P/km 470.00
109 Transporting one HT PSC pole by Head load (limited to 0.3km). P/km 1507.00

110 Transporting 'A' type pole by Head load (limited to 0.3km). P/km 1764.00

111 Transporting 4 legged pole by Head load (limited to 0.3km). P/km 2446.00

112 Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging No 1934.00
& back filling pit, drawing earth leads.
113 Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, No 2448.00
digging & back filling pit, drawing earth leads.
114 Fitting and erecting one HT 4 legged pole in position incl. fitting cross arm, No 3529.00
digging & back filling pit, drawing earth leads.

115 Additional rate for providing one disc set on any type of HT pole for making No 94.00
cut point.
116 Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 No 5159.00
channel cross arms, digging & back filling pit, drawing earth leads.

117 Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 No 6187.00
channel cross arms, digging & back filling pit, drawing earth leads.

118 Fitting and erecting one HT DP using 4 legged pole in position incl. fitting 2 No 8349.00
channel cross arms, digging & back filling pit, drawing earth leads.

119 Fitting and providing one HT Stay for 11kV pole incl. digging & back filling No 812.00
pit.
120 Fitting and providing one Strut using HT PSC pole incl. digging & back filling No 1805.00
pit.
121 Fitting and providing one Strut using 'A' type pole incl. digging & back filling No 2319.00
pit.
122 Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. No 2839.00
digging & back filling pits.
123 Fitting and providing one HT Fly stay for 11kV pole using 'A' type pole incl. No 3353.00
digging & back filling pits.
124 Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, No 2027.00
fitting cross arm, insulators, binding etc.
125 Insertion of one HT 'A' type pole in existing line incl. digging & backfilling pit, No 2541.00
fitting cross arm, insulators, binding etc.
126 Insertion of one HT 4 legged pole in existing line incl. digging & backfilling pit, No 3812.00
fitting cross arm, insulators, binding etc.
127 Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. No 257.00

128 Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. No 514.00

129 Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. No 771.00

130 Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. No 1542.00

131 Additional rate for excavation of Pit for 'A' type pole in Laterite. No 386.00
132 Additional rate for excavation of Pit for 'A' type pole in Hard Laterite. No 771.00

133 Additional rate for excavation of Pit for 'A' type pole in Soft Rock. No 1157.00
134 Additional rate for excavation of Pit for 'A' type pole in Rock. No 2313.00
135 Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. km 20538.00
cutting and removing tree branches wherever necessary.
136 Stringing of one km 11kV line with ACSR Rabbit (3 conductors) incl. cutting km 17295.00
and removing tree branches wherever necessary.
137 Fitting and erecting one HT PSC DP, fitting all accessories (2 stays, 8 cross No 20634.00
arms, AB, DO, LA etc.), mounting of 100kVA Transformer, fixing DB, DTR
box and giving all HT & LT connections.

138 Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections No 6779.00
on existing DP, 3 LT fuses.

139 Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections No 6445.00
on existing DP, 3 LT fuses.

140 Fitting 3 channel cross arms, AB switch, DO fuse, LA, HT & LT connections No 5777.00
on existing DP, 3 LT fuses.

141 Erecting one CT-PT unit to existing DP and giving connections, incl. loading & No 3002.00
unloading, excluding transportation.
142 Erecting one 25kVA Transformer to existing DP and giving connections, incl. No 2860.00
loading & unloading, excluding transportation.
143 Erecting one 63kVA Transformer to existing DP and giving connections, incl. No 3002.00
loading & unloading, excluding transportation.
144 Erecting one 100kVA Transformer to existing DP and giving connections, incl. No 4225.00
loading & unloading, excluding transportation.
145 Erecting one 160kVA Transformer to existing DP and giving connections, incl. No 4367.00
loading & unloading, excluding transportation.
146 Erecting one 100kVA Transformer to existing Plinth/Platform and giving No 3658.00
connections, incl. loading & unloading, excluding transportation.
147 Erecting one 160kVA Transformer to existing Plinth/Platform and giving No 3800.00
connections, incl. loading & unloading, excluding transportation.

148 Erecting one 250kVA Transformer to existing Plinth/Platform and giving No 4895.00
connections, incl. loading & unloading, excluding transportation.

149 Erecting one 315kVA Transformer to existing Plinth/Platform and giving No 5037.00
connections, incl. loading & unloading, excluding transportation.

150 Erecting one 500kVA Transformer to existing Plinth/Platform and giving No 5179.00
connections, incl. loading & unloading, excluding transportation.

151 Installing one DTR Meter with box on existing poles and giving the complete No 2220.00
connections incl. conveyance of materials.
152 Installing one Border Meter with box on existing poles and giving the complete No 2220.00
connections incl. conveyance of materials.
153 Erection of LT 2 way distribution box on existing cross arm giving connection No 2220.00
incl. cable and earth connection (excluding earthing).
154 Erection of LT 3 way distribution box on existing cross arm giving connection No 2376.00
incl. cable and earth connection (excluding earthing).
155 Erection of LT 4 way distribution box on existing cross arm giving connection No 2532.00
incl. cable and earth connection (excluding earthing).
156 Fitting one additional Fuse unit and giving connection from Transformer to fuse No 207.00
and DB to LT OH line.
157 Providing one Earth using earth pipe incl. digging separate pit at standard No 1340.00
distance away from the pole/structure & backfilling.
158 Providing one Driven Earth using GI earth pipe at standard distance away from No 351.00
the pole/structure in loose soil.
159 Providing one Driven Earth using Steel earth rod at standard distance away No 351.00
from the pole/structure in loose soil.
160 Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. No 514.00

161 Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. No 1028.00

162 Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock. No 1542.00

163 Providing one Coil Earth using GI earth wire, digging separate pit at standard No 643.00
distance away from the pole/structure & backfilling.
164 Fitting one set (3No.) 11kV LA and giving connections excluding earthing. No 284.00

165 Fitting one set (3No.) 11kV DO Fuse and giving connection. No 284.00
166 Fitting one set AB switch, DO fuse, LA, giving connections and drawing earth No 2477.00
leads for earthing excluding provision of earth.
167 Fitting one set AB switch and giving connection No 1652.00

168 Conveyance of one km 11kV line materials from section store/stacking place to km/ km 1028.00
the work site (excluding poles).
169 Fitting one Additional V cross arm in existing single pole incl. conveyance of No 284.00
materials.
170 Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single No 284.00
pole incl. conveyance of materials.
171 Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing No 334.00
11kV DP incl. conveyance of materials.

172 Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing No 321.00
11kV DP incl. conveyance of materials.
173 Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV No 314.00
DP incl. conveyance of materials.
174 Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting No 83.00
insulators and binding the same with LT Line.
175 Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting No 124.00
insulators and binding the same with LT Line.
176 Providing Bucket type cradling for one span 11kV line. No 7343.00

177 Providing barbed wire protection (2.5m height) for one 11kV pole. No 135.00
178 Providing special type anti-climbing protection 2.5m height for one 11kV pole. No 83.00

179 Fitting one additional HT pin with insulator No 88.00


180 Fitting one additional F top bracket No 88.00
181 Additional rate for excavation of Pit for 4 legged pole in Laterite. No 540.00
182 Additional rate for excavation of Pit for 4 legged pole in Hard Laterite. No 1079.00

183 Additional rate for excavation of Pit for 4 legged pole in Soft Rock. No 1619.00
184 Additional rate for excavation of Pit for 4 legged pole in Rock. No 3238.00
185 Fitting one Additional 2.4m Channel cross arm in existing single pole incl. No 341.00
conveyance of materials.
186 Insertion of one HT PSC pole in existing HT/LT line incl. digging & back No 2415.00
filling pit, fitting cross arm, insulator, binding etc.
187 Installing one DTR meter with box on existing channel/angle cross-arm on DP No 545.00
structure and giving connections including conveyance

201 Loading LT PSC pole to Hand cart from the stacking place and unloading the No 222.00
same at work site.
202 Transporting one LT PSC pole by Hand cart - limited to 4km (excluding P/km 222.00
loading and unloading).
203 Transporting one LT PSC pole by Head load for an average distance of one km P/km 824.00
(limited to 0.3km).
204 Erecting one LT PSC Pole in position incl. digging & back filling pit. No 1193.00

205 Providing Stay for LT poles incl. digging & back filling pit. No 555.00
206 Providing Strut using LT PSC pole incl. digging & back filling pit. No 1116.00
207 Providing Fly stay for LT pole using LT PSC pole incl. digging & back filling No 1810.00
pit.
208 Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. No 129.00

209 Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. No 257.00
210 Additional rate for excavation of one Pit for LT Pole/LT Stay in Soft Rock. No 386.00

211 Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock. No 771.00

212 Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. km 10015.00
removing touchings and conveyance of materials.

213 Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) km 14032.00
incl. fitting cross arm etc. removing touchings and conveyance of materials.

214 Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting km 18874.00
cross arm etc. removing touchings and conveyance of materials.

215 Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for km 22890.00
N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of
materials.
216 Stringing one km LT Addl conductor (Rabbit) after fitting crossarm, but km 4530.00
without realigning existing conductor, incl. fitting cross arm, insulator etc.
removing touchings and conveyance of materials.
217 Stringing one km LT Addl conductor (Weasel) after fitting crossarm, but km 4016.00
without realigning existing conductor, incl. fitting cross arm, insulator etc.
removing touchings and conveyance of materials.

218 Stringing one km LT Addl conductor (Rabbit) where fitting of crossarm or km 3245.00
realigning existing conductoris not required, incl. fitting insulators, removing
touchings and conveyance of materials.
219 Stringing one km LT Addl conductor (Weasel) where fitting of crossarm or km 2474.00
realigning existing conductoris not required, incl. fitting insulators, removing
touchings and conveyance of materials.
220 Conversion of one km LT Sph 2 wire to 3ph 4 wire line incl. dismantling km 22593.00
existing 2 conductors, stringing 3 Rabbit & 1 Weasel incl. conveyance.

221 Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, No 142.00
connecting with bolt&nut etc.
222 Providing Guarding for LT line one span for road crossing. No 2988.00

223 Fitting one No. LT lightning arrestor in LT OH line and giving connections No 48.00
excluding earthing.
224 Conversion of one km LT Sph 3 wire line to 3ph 5 wire line incl. dismantling km 26923.00
existing 3 conductors, stringing 3 ACSR Rabbit & 2 waeasel including
conveyance .
225 Stringing one km LT Addl conductor (Weasel) after fitting crossarm & km 7464.00
realigning one of the existing conductors, incl. fitting cross arm, insulator etc.
removing touchings and conveyance of materials.

251 Giving one single phase WP service connection, as per standards, incl. No 952.00
conveyance of materials.
252 Giving one three phase WP service connection (upto 10kW) as per standards, No 1459.00
incl. conveyance of materials.
253 Giving one three phase WP service connection (above 10kW to 25kW) as per No 1585.00
standards, incl. conveyance of materials.
254 Giving one three phase WP service connection (above 25 kW) as per No 2227.00
standards, incl. conveyance of materials.
255 Converting single phase WP service connection to three phase service No 2034.00
connection, incl. conveyance of materials.
256 Converting three phase WP service connection to single phase service No 1785.00
connection, incl. conveyance of materials.
257 Constructing one span Sph OH line for giving S/C using PSC pole with one No 2148.00
stay incl. digging& back filling 2 pits, cutting tree branches .

258 Constructing one span Sph OH line for giving S/C using PSC pole with PSC No 2709.00
strut incl. digging& back filling 2 pits, cutting tree branches.

259 Constructing one span Sph OH line for giving S/C using PSC pole without No 1593.00
stay/strut incl. digging& back filling pit, cutting tree branches.

260 Constructing one span 3ph OH line for giving S/C using PSC pole with one stay No 2502.00
incl. digging& back filling 2 pits, cutting tree branches.

261 Constructing one span 3ph OH line for giving S/C using PSC pole with PSC No 3063.00
strut incl. digging& back filling 2 pits, cutting tree branches.

262 Constructing one span 3ph OH line for giving S/C using PSC pole without No 1948.00
stay/strut incl. digging& back filling pit, cutting tree branches.

263 Conversion of one span Sph 2 wire OH line to 3ph 4 wire line, incl. dismantling No 904.00
existing line, stringing new Rabbit for phase and Weasel for neutral
incl.conveyance.
264 Insertion of one LT PSC pole in existing Sph OH line incl. digging & back No 1304.00
filling pit, fitting cross arm, insulator, binding etc.
265 Insertion of one LT PSC pole in existing 3ph OH line incl. digging & back No 1402.00
filling pit, fitting cross arm, insulator, binding etc.
266 Providing WP support with PSC pole incl. digging & back filling pit. No 1149.00

267 Installing one pole top service connection box Sph 6way and giving No 57.00
connections.
268 Installing one pole top service connection box 3ph 6way and giving No 73.00
connections.
269 Giving one single phase service connection in panel board. No 171.00
270 Giving one three phase service connection in panel board. No 227.00
271 Converting single phase WP service connection to three phase(5kW to 10kW) No 2570.00
service connection, incl. conveyance of materials.

272 Converting single phase WP service connection to three phase(above 10kW ) No 2827.00
service connection, incl. conveyance of materials.

273 Conversion of one span Sph 3 wire OH line to 3ph 5 wire line, incl. dismantling No 1077.00
existing line, stringing new Rabbit for phase and Weasel for neutral
incl.conveyance.
301 Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new PSC pole No 2686.00
in place and refitting of all items incl. conveyance (except pole).

302 Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new 'A' type No 3268.00
pole in place and refitting of all items incl. conveyance (except pole).

303 Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new 4 legged No 4902.00
pole in place and refitting of all items incl. conveyance (except pole).

304 Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in No 3098.00
place and refitting of all items incl. conveyance (except pole).

305 Renewal of existing damaged/old 11kV PSC/RCC Pole with new 'A' type pole No 3680.00
in place and refitting of all items incl. conveyance (except pole).

306 Renewal of existing damaged/old 11kV PSC/RCC Pole with new 4 legged pole No 5520.00
in place and refitting of all items incl. conveyance (except pole).

307 Renewal of existing damaged/old 11kV 'A' type pole with new 'A' type pole in No 3741.00
place and refitting of all items incl. conveyance (except pole).

308 Renewal of existing damaged/old 11kV 4 legged pole with new 4 legged pole in No 5611.00
place and refitting of all items incl. conveyance (except pole).

309 Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new PSC DP in No 6998.00
place and refitting of all items incl. conveyance (except poles).

310 Renewal of existing damaged/old 11kV PSC DP with new PSC DP in place No 7822.00
and refitting of all items incl. conveyance (except poles).

311 Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new 'A' type No 8026.00
DP in place and refitting of all items incl. conveyance (except poles).

312 Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new 4 legged No 12039.00
pole DP in place and refitting of all items incl. conveyance (except poles).

313 Renewal of existing damaged/old 11kV PSC/RCC DP with new 'A' type DP in No 8850.00
place and refitting of all items incl. conveyance (except poles).

314 Renewal of existing damaged/old 11kV PSC/RCC DP with new 4 legged pole No 13276.00
DP in place and refitting of all items incl. conveyance (except poles).

315 Renewal of existing damaged/old 11kV 'A' type DP with new 'A' type DP in No 9107.00
place and refitting of all items incl. conveyance (except poles).

316 Renewal of existing damaged/old 11kV 4 legged pole DP with new 4 legged No 13661.00
pole DP in place and refitting of all items incl. conveyance (except poles).
317 Renewing damaged TW/RSJ/Rail Transformer DP structure with new PSC No 19811.00
Transformer DP and re-erecting all accessories & Transformer. (excluding
renewal of pipe earthing).

318 Renewing damaged TW/RSJ/Rail Transformer DP structure with new 'A' type No 20325.00
Transformer DP and re-erecting all accessories & Transformer (excluding
renewal of pipe earthing).

319 Renewing damaged TW/RSJ/Rail Transformer DP structure with new 4 legged No 22093.00
pole Transformer DP and re-erecting all accessories & Transformer (excluding
renewal of pipe earthing).

320 Renewing damaged PSC/RCC Transformer DP structure with new PSC No 20635.00
Transformer DP and re-erecting all accessories

321 Renewing damaged PSC/RCC Transformer DP structure with new 'A' type No 21149.00
Transformer DP and re-erecting all accessories & Transformer (excluding
renewal of pipe earthing).

322 Renewing damaged PSC/RCC Transformer DP structure with new 4 legged No 23329.00
pole Transformer DP and re-erecting all accessories & Transformer (excluding
renewal of pipe earthing).

323 Renewal of one damaged HT Pin insulator. No 171.00


324 Additional rate for refitting/redoing one Disc set while renewing any type of No 426.00
11kV cut pole
325 Additional rate for reinstalling LT line on the renewed 11kV pole having both No 440.00
HT and LT (HT/LT) lines.
326 Renewal of existing damaged/old 11kV Stay with new stay in place incl. No 1089.00
excavation & backfilling of pit and conveyance.
327 Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. No 334.00

328 Replacing/inserting HT Stay insulator on the existing stay. No 334.00


329 Renewal of existing damaged/old 11kV Strut with new PSC strut in place incl. No 2708.00
excavation & backfilling pit and conveyance (except pole).

330 Renewal of existing damaged/old 11kV Strut with new 'A' type strut in place No 2965.00
incl. excavation & backfilling pit and conveyance (except pole).

331 Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal No 4130.00
of PSC pole (used for fly stay) and refitting of all items and conveyance (except
conveyance of pole).
332 Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal No 4515.00
of 'A' type pole and refitting of all items and conveyance (except pole).

333 Re-Tensioning one span 11kV line incl. replacing insulators, tightening stay, No 429.00
cutting tree branches and conveyance.
334 Re-joining one snapped HT conductor after removing damaged portion incl. re- No 981.00
tensioning and conveyance of all materials complete.
335 Repairing one limb of AB switch by replacing male and female contacts, No 413.00
damaged insulators etc. and reconnecting the same.
336 Replacing one set AB switch incl. dismantling existing AB, giving connections No 2477.00
etc.
337 Renewal of one No. 11kV LA incl. conveyance, reconnecting and dismantling No 142.00
old LA (excluding earthing).
338 Renewal of one No. 11kV DO Fuse incl. conveyance, reconnecting and No 142.00
dismantling old DO Fuse (excluding earthing).
339 Renewing 11kV Jumper connection for one phase from OH line to Transformer No 440.00
through AB, DO and LA using Copper/ACSR conductor.
340 Renewing one 11kV Jumper using Copper/ACSR conductor as per standard No 256.00
specification (in loop formation for tapping from line).
341 Renewing one 11kV Jumper connection using Copper/ACSR conductor as per No 179.00
standard specification.
342 Renewing one V cross arm on the 11kV Pole incl. dismantling and conveyance. No 480.00

343 Renewing one 1.8m Channel cross arm on the 11kV Pole incl. dismantling and No 480.00
conveyance.
344 Renewing one damaged cross arm with 100x50mm, 2.4m/3m Channel cross No 418.00
arm on the 11kV DP incl. dismantling and conveyance.

345 Renewing one damaged cross arm with 35x35x5mm, 2.4m/3m Channel cross No 392.00
arm on the 11kV DP incl. dismantling and conveyance.

346 Providing stay (temporary nature) by piling Cut Ends in kole land incl. No 852.00
fabrication of cut ends and conveyance.
347 Straightening one slanted 11kV pole after unbinding the line and rebinding the No 670.00
line after work.
348 Straightening one slanted 11kV Cut pole after lowering down the existing line No 1109.00
and stringing the line after work.
349 Dismantling CT/PTunit, erecting new CT/PTunit in place incl. loading & No 4760.00
unloading at site.
350 Dismantling 25kVA Tr., erecting new 25kVA Tr. in place incl. loading & No 4548.00
unloading at site.
351 Dismantling 63kVA Tr., erecting new 63kVA Tr. in place incl. loading & No 4760.00
unloading at site.
352 Dismantling 100kVA Transformer, erecting new 100kVA Transformer, giving No 6878.00
connections incl. loading & unloading at site.
353 Dismantling 160kVA Transformer, erecting new 160kVA Transformer, giving No 7091.00
connections incl. loading & unloading at site.
354 Dismantling 250kVA Transformer, erecting new 250kVA Transformer, giving No 7883.00
connections incl. loading & unloading at site.
355 Dismantling 315kVA Transformer, erecting new 315kVA Transformer, giving No 8096.00
connections incl. loading & unloading at site.
356 Dismantling 500kVA Transformer, erecting new 500kVA Transformer, giving No 8309.00
connections incl. loading & unloading at site.
357 Enhancing 63kVA Transformer with new 100kVA Transformer, giving No 6010.00
connections incl. loading & unloading at site.
358 Enhancing 100kVA Transformer with 160kVA Transformer, giving No 6480.00
connections etc. incl. loading & unloading at site.
359 Enhancing 160kVA Transformer with 250kVA Transformer, giving No 6795.00
connections etc. incl. loading & unloading at site.
360 Enhancing 250kVA Transformer with 315kVA Transformer, giving No 7485.00
connections etc. incl. loading & unloading at site.
361 Enhancing 315kVA Transformer with 500kVA Transformer, giving No 7697.00
connections etc. incl. loading & unloading at site.

362 Reconductoring one km 11kV old line of 3 conductors with new ACSR km 29367.00
Raccoon incl. cutting of tree branches and conveyance.
391 Reconductoring one km 11kV old line of 3 conductors with new ACSR Rabbit km 25938.00
incl. cutting of tree branches and conveyance.
392 Renewal of existing damaged/old 11kV Fly stay with new Fly stay (excluding No 668.00
stay-pole & stay-rod) including conveyance.
393 Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. refitting No 668.00
of all items and conveyance.
363 Drilling hole of various sizes on existing Channel/Cross Arm. No 10.00

364 Drilling oval shaped hole of various sizes on existing Channel/Cross No 25.00
Arm/GI/MS cleat etc.
365 Cutting Channel/Cross Arm/Angle Iron into two pieces. No 43.00
401 Renewal of existing damaged/old LT TW/RSJ/Rail (Sph line) pole with new No 1812.00
PSC pole in place and refitting of all items incl. conveyance (except pole).

402 Renewal of existing damaged/old LT PSC/RCC (Sph line) pole with new PSC No 2069.00
pole in place and refitting of all items incl. conveyance (except pole).

403 Renewal of existing damaged/old LT TW/RSJ/Rail (3ph line) pole with new No 2050.00
PSC pole in place and refitting of all items incl. conveyance (except pole).

404 Renewal of existing damaged/old LT PSC/RCC (3ph line) pole with new PSC No 2307.00
pole in place and refitting of all items incl. conveyance (except pole).

405 Additional rate for refitting/redoing one Shackle set and reshackling one span No 202.00
while renewing any type of pole.
406 Renewal of existing damaged/old LT stay with new stay in place and refitting of No 703.00
all items and conveyance of all materials.
407 Renewal of existing damaged/broken old LT stay with existing stay rod. No 257.00

408 Replacing/inserting LT stay insulator on the existing stay. No 257.00


409 Renewal of existing damaged/old LT Strut with new PSC strut in place and No 1545.00
refitting of all items incl. conveyance (except pole).
410 Renewal of damaged LT Fly stay with new Fly stay incl. renewal of new PSC No 2586.00
pole (used for fly stay) and refitting of all items, conveyance (except conveyance
of pole).
411 Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening No 155.00
stay, cutting tree branches incl. conveyance.
412 Reshackling one span LT 3ph 4 wire OH line, replacing insulators, tightening No 291.00
stay, cutting tree branches incl. conveyance.
413 Reshackling one span LT OH Addl conductor, replacing insulators, tightening No 68.00
stay, cutting tree branches incl. conveyance.
414 Re-joining snapped one LT conductor after removing damaged portion incl. No 415.00
Reshackling and conveyance of all materials complete.
415 Renewing one LT Jumper using Copper/ACSR conductor as per standard No 85.00
specification (in loop formation for tapping from line).
416 Renewing one LT Jumper connection using Copper/ACSR conductor as per No 60.00
standard specification.
417 Providing/Inserting 2 line spacer on the existing LT OH line. No 52.00
418 Providing/Inserting 3 line spacer on the existing LT OH line. No 62.00
419 Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and No 519.00
refitting all items to the new pole.
420 Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and No 1051.00
refitting all items to the new pole.
421 Straightening one Slanted LT pole after unbinding the line and rebinding the No 608.00
line after work.
422 Straightening one Slanted LT Cut pole after unbinding the line and rebinding No 824.00
the line after work.
423 Reconductoring one km LT Sph 2 wire OH old line with new ACSR Rabbit km 11785.00
conductor incl. conveyance of materials.
424 Reconductoring one km LT 3ph 4 wire OH old line with new 3 ACSR Rabbit km 24926.00
and one Weasel conductor incl. conveyance of materials.

425 Reconductoring one km LT OH one old conductor with New ACSR Rabbit km 5893.00
conductor incl. conveyance of materials.
426 Reconductoring one km LT OH one old conductor with New ACSR Weasel km 5303.00
conductor incl. conveyance of materials.
427 Reconductoring one km LT single ph 3 wire OH old line with new 2 ACSR km 17088.00
Rabbit and one weasel condutor incl conveyance of materials

428 Stringing one km LT Addl conductor (Weasel) after relocating one of the km 4330.00
existing conductor, incl. fitting insulators, removing touchings and conveyance
of materials.
429 Renewal of damaged LT Fly stay with new Fly stay incl. refitting of all items, No 514.00
conveyance .
451 Dismantling and reconnecting Sph service connection from the OH line incl. No 57.00
lowering down the WP portion.

452 Dismantling and reconnecting 3ph service connection from the OH line incl. No 88.00
lowering down the WP portion.
453 Redoing Sph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral No 514.00
link etc, and conveyance of material.

454 Redoing 3ph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral No 648.00
link etc, and conveyance of material.

455 Shifting one Sph metering equipment with all fittings at new location and No 488.00
redoing the WP service wire.
456 Shifting one 3ph metering equipment with all fittings at new location and No 643.00
redoing the WP service wire.
457 Shifting one 3ph metering equipment (with CT) with all fittings at new location No 964.00
and redoing the WP service wire.
476 Changing faulty Sph Energy meter with new meter, giving connection incl. No 67.00
conveyance of meter to the site and back to store.

477 Changing faulty 3ph Energy meter with new meter, giving connection incl. No 124.00
conveyance of meter to the site and back to store.

478 Changing faulty 3ph CT meter with new meter & CT, giving connection incl. No 697.00
conveyance of meter to the site and back to store.

501 Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, No 648.00
strut etc. and stacking the same.
502 Dismantling (without damage) one No. 11kV TW/RSJ/Rail pole after No 1066.00
disconnecting stays, strut etc. and stacking the same.
503 Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut No 1060.00
etc. and stacking the same.
504 Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting No 1847.00
stays, strut etc. and stacking the same.
505 Dismantling one damaged 11kV 'A' type pole after disconnecting stays, strut No 1317.00
etc. and stacking the same.
506 Dismantling (without damage) one 11kV 'A' type pole after disconnecting No 1849.00
stays, strut etc. and stacking the same.
507 Dismantling one damaged 11kV 4 legged pole after disconnecting stays, strut No 1976.00
etc. and stacking the same.
508 Dismantling (without damage) one 11kV 4 legged pole after disconnecting No 2773.00
stays, strut etc. and stacking the same.
509 Dismantling one damaged HT TW/RSJ/Rail Strut pole incl. removal of clamps No 490.00
and stacking.
510 Dismantling (without damage) one HT TW/RSJ/Rail Strut pole incl. removal of No 917.00
clamps and stacking.
511 Dismantling one damaged HT PSC/RCC Strut pole incl. removal of clamps No 903.00
and stacking.
512 Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of No 1692.00
clamps and stacking.
513 Dismantling (without damage) one km 11kV line (3 conductors), cross arm, km 8168.00
insulators, disc, rolling the conductor and stacking.
514 Dismantling (without damage) one HT stay incl. back filling, and bringing back No 534.00
to section store.
515 Dismantling one V cross arm/Channel cross arm from existing Pole, and No 114.00
bringing back to section store.
516 Dismantling one Channel cross arm from existing DP structure, and bringing No 167.00
back to section store.
517 Dismantling (without damage) one AB switch from existing structure and No 991.00
bringing back to section store.
518 Dismantling one HT pin insulator with pin and bring back to section store. No 114.00

519 Dismantling one damaged AB switch from existing structure. No 697.00


520 Dismantling transformer station in DP structure excluding the rate of No 8825.00
dismantling earthing
521 Dismanling transformer station with transformer erected in plinth excluding No 8424.00
the rate of dismantling transformer
551 Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, No 339.00
strut etc. and stacking the same.

552 Dismantling (without damage) one LT TW/RSJ/Rail pole after disconnecting No 610.00
stays, strut etc. and stacking the same.
553 Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut No 596.00
etc. and stacking the same.
554 Dismantling (without damage) one LT PSC/RCC pole after disconnecting No 1137.00
stays, strut etc. and stacking the same.
555 Dismantling (without damage) LT stay incl. digging pit in all classes of soil and No 277.00
backfilling
556 Dismantling one damaged LT TW/RSJ/Rail Strut pole incl. removal of clamps No 301.00
and stacking.
557 Dismantling (without damage) one LT TW/RSJ/Rail Strut pole incl. removal of No 555.00
clamps and stacking.
558 Dismantling one damaged LT PSC/RCC Strut pole incl. removal of clamps and No 558.00
stacking.
559 Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of No 939.00
clamps and stacking.
560 Dismantling one LT 2 line cross arm from existing pole. No 41.00
561 Dismantling one LT 4 line cross arm from existing pole. No 62.00
562 Dismantling single phase WP service connection with meter & all accessories No 512.00
and bringing back to section store.
563 Dismantling three phase WP service connection with meter & all accessories No 761.00
and bringing back to section store.
564 Dismantling (without damage) one span of HT or LT cradling and stacking the No 723.00
same neatly and in good condition for re-use.
565 Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, km 4400.00
insulators and stacking the conductors in rolls.
566 Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, km 8353.00
insulators and stacking the conductors in rolls.
567 Dismantling (without damage) one km LT additional conductor line, cross km 1982.00
arms, insulators and stacking the conductors in rolls.
568 Dismantling one section fuse 114.00
569 Dismantling one section fuse from distribution box 192.00
570 Dismantling three phase CT Connected WP service connection No 991.00

601 Wiring and installing one new ordinary street light fitting on existing pole and No 185.00
giving connections.

602 Wiring and installing one new CFL street light fitting on existing pole and No 185.00
giving connections.
603 Wiring and installing one new LED street light fitting on existing pole and No 185.00
giving connections.
604 Dismantling (without damage) one ordinary street light/CFL/LED fitting from No 93.00
the pole and stacking.
605 Dismantling one ordinary street light/CFL/LED fitting from pole, repairing and No 278.00
refitting the same in position and giving connection.
606 Wiring and installing new set 2x40W fluorescent tube fitting on existing poles No 297.00
incl. giving connection.
607 Dismantling one set 2x40 W fluorescent tube fitting from pole, repairing and No 445.00
refitting the same in position and giving connection.
608 Replacing bulb on existing street light. No 45.50
609 Replacing CFL/LED on existing street light. No 45.50
610 Dismantling one ordinary street light/CFL/LED fitting from existing pole and No 291.00
refitting the same on newly erected pole and reconnecting.

611 Dismantling one 2x40W fluorescent tube fitting from the existing pole and No 445.00
refitting the same on newly erected pole and reconnecting.

612 Wiring and installing new set SV lamp fitting on existing poles incl. giving No 927.00
connection (without using aerial lift).
613 Wiring and installing new set MV lamp fitting on existing poles incl. giving No 927.00
connection (without using aerial lift).
614 Wiring and installing new set Metal halide lamp fitting on existing poles incl. No 927.00
giving connection (without using aerial lift).
615 Wiring and installing new set SV lamp fitting on existing poles incl. giving No 463.00
connection (using aerial lift).
616 Wiring and installing new set MV lamp fitting on existing poles incl. giving No 463.00
connection (using aerial lift).
617 Wiring and installing new set Metal halide lamp fitting on existing poles incl. No 463.00
giving connection (using aerial lift).
618 Dismantling SV/MV/Metal halide lamp fitting, repairing & refitting the same in No 1390.00
position and giving connection (without using aerial lift).

619 Dismantling SV/MV/Metal halide lamp fitting, repairing & refitting the same in No 695.00
position and giving connection (using aerial lift).
620 Dismantling SV/MV/Metal halide lamp fitting from the existing pole and No 1390.00
refitting the same on newly erected pole and reconnecting (without using aerial
lift).
621 Dismantling SV/MV/Metal halide lamp fitting from the existing pole and No 695.00
refitting the same on newly erected pole and reconnecting (using aerial lift).

622 Replacing holder, fused bulb/CFL, changing wires, giving connection etc. of No 93.00
street light incl. conveyance of all materials.
623 Wiring and installing new set 1x40W fluorescent tube fitting on existing poles No 241.00
incl. giving connection.
624 Dismantling one set 1x40 W fluorescent tube fitting from pole, repairing and No 361.00
refitting the same in position and giving connection.
625 Dismantling one 1x40W fluorescent tube fitting from the existing pole and No 361.00
refitting the same on newly erected pole and reconnecting.

651 Clearing touchings on HT lines 11kV, cutting tree branches, bamboo clusters, km 1184.00
coconut cudjans etc. as specified by dept. (Urban/Town).
652 Clearing touchings on HT lines 11kV, cutting tree branches, bamboo clusters, km 1586.00
coconut cudjans etc. as specified by dept. (Rural/Remote).

653 Clearing touchings on HT/LT lines, cutting tree branches, bamboo clusters, km 1421.00
coconut cudjans etc. as specified by dept. (Urban/Town).

654 Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, km 1903.00
coconut cudjans etc. as specified by dept. (Rural/Remote).

655 Clearing touchings on 33kV lines, cutting tree branches, bamboo clusters, km 1777.00
coconut cudjans etc. as specified by dept. (Urban/Town).

656 Clearing touchings on 33kV lines, cutting tree branches, bamboo clusters, km 2378.00
coconut cudjans etc. as specified by dept. (Rural/Remote).

657 Clearing touchings on LT lines, cutting tree branches, bamboo clusters, coconut km 1100.00
cudjans etc. as specified. (Urban/Town).

658 Clearing touchings on LT lines, cutting tree branches, bamboo clusters, coconut km 1339.00
cudjans etc. as specified. (Rural/Remote).
676 Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of No 280.00
trunks/branches, removing the root completely and stacking.
677 Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of No 477.00
trunks/branches, removing the root completely and stacking.
678 Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting of No 732.00
trunks/branches, removing the root completely and stacking.

679 Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, No 422.00
removing root completely and stacking (where space for falling trees is not
enough).
680 Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting branches, No 760.00
removing root completely and stacking (where space for falling trees is not
enough).
681 Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting branches, No 1072.00
removing root completely and stacking (where space for falling trees is not
enough).
701 Loading HT TW/RSJ/Rail pole from the stacking place and unloading the same No 206.00
at work site (transport by vehicle).

702 Loading HT PSC pole from the stacking place and unloading the same at work No 450.00
site (transport by vehicle).
703 Loading HT 'A' type pole from the stacking place and unloading the same at No 535.00
work site (transport by vehicle).
704 Loading HT 4 legged pole from the stacking place and unloading the same at No 752.00
work site (transport by vehicle).
705 Loading LT TW/RSJ/Rail pole from the stacking place and unloading the same No 149.00
at work site (transport by vehicle).
706 Loading LT PSC pole from the stacking place and unloading the same at work No 283.00
site (transport by vehicle).
707 Unloading one Transformer (upto and incl. 160kVA) from vehicle to ground No 798.00
incl. conveyance upto 25m.
708 Unloading one Transformer (above 160kVA) from vehicle to ground incl. No 1338.00
conveyance upto 25m.
709 Loading one Transformer (upto and incl. 160kVA) from ground to vehicle incl. No 1055.00
conveyance upto 25m.
710 Loading one Transformer (above 160kVA) from ground to vehicle incl. No 1595.00
conveyance upto 25m.
711 Dismantling one Transformer upto 160kVA from structure and loading to No 1164.00
vehicle incl. disconnecting HT/LT/Earth connections.
712 Dismantling one Transformer above 160kVA from plinth and loading to vehicle No 1434.00
incl. disconnecting HT/LT/Earth connections.
713 Dismantling one Transformer (upto and incl. 160kVA) from existing structure No 1434.00
to ground.
714 Dismantling one Transformer (above 160kVA) from existing plinth to ground. No 1705.00

726 Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 Trip 1207.35
poles excluding loading & unloading.

727 Transporting poles by hired vehicle to a distance beyond 5km and carrying upto km 40.00
4 poles. (Running km).
728 Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to Trip 1207.35
250kVA Transformers / RMUs excluding loading & unloading.

729 Transporting Transformers by hired vehicle to a distance beyond 5km and upto km 40.00
2 No. of 63 to 250kVA Transformers / RMUs (Running km).

751 Engaging one boat man with Boat/Country Boat/Vallam. day 586.00

752 Transporting HT TW/RSJ/Rail Poles by Country boat/Vallam upto 6km incl. No 292.00
loading, unloading and hire charges.
753 Transporting HT TW/RSJ/Rail Poles by Country boat/Vallam beyond 6km. km 51.40

754 Transporting HT PSC Poles by Country boat/Vallam upto 6km incl. loading, No 667.00
unloading and hire charges.
755 Transporting HT PSC Poles by Country boat/Vallam beyond 6km. km 77.00
756 Transporting 'A' type Poles by Country boat/Vallam upto 6km incl. loading, No 786.00
unloading and hire charges.
757 Transporting 'A' type Poles by Country boat/Vallam beyond 6km. km 103.00
758 Transporting 4 legged poles by Country boat/Vallam upto 6km incl. loading, No 1179.00
unloading and hire charges.
759 Transporting 4 legged poles by Country boat/Vallam beyond 6km. km 154.00
760 Transporting LT TW/RSJ/Rail Poles by Country boat/Vallam upto 6km incl. No 235.00
loading, unloading and hire charges.
761 Transporting LT TW/RSJ/Rail Poles by Country boat/Vallam beyond 6km. km 30.80
762 Transporting LT PSC Poles by Country boat/Vallam upto 6km incl. loading, No 559.00
763 unloading
TransportingandLT
hire charges.
PSC Poles by Country boat/Vallam beyond 6km. km 62.00
764 Transporting 63/100/160kVA Transformer by Country boat/Vallam upto 6km No 1127.00
incl. loading, unloading and hire charges.
765 Transporting 63/100/160kVA Transformer by Country boat/Vallam beyond km 154.00
6km.
766 Transporting 250/315/500kVA Transformer by Country boat/Vallam upto 6km No 1345.00
incl. loading, unloading and hire charges.
767 Transporting 250/315/500kVA Transformer by Country boat/Vallam beyond km 154.00
6km.
776 Pole numbering using printed Aluminium sheets / Painting the surface of pole No 54.00
with anti algal yellow paint and painting Letters with black paint as specified
incl. cost of paint.

777 Preparing index register (book & soft copy) showing name of Transformer, No 5.00
post numbers, consumer numbers as specified.
778 Traffic signal painting of pole 1.5m height using black and white paints in No 228.00
alternate rings of 25cm width incl. cost of paint as specified.

779 Supplying and fixing permanently, screen printed consumer premises No 21.50
identification number card of size 10x7cm using screw/adhesives as specified.

780 Painting 'A' pole structure with one coat Synchromate primer and two coat grey No 1646.00
enamel/aluminium paint incl. cost of paint.
781 Numbering of Tree (marking for cutting the tree) using yellow enamel paint as No 11.00
specified incl. cost of paint.
782 Repainting 25 kVA transformers at site No 1717.00

783 Repainting 50/63 kVA transformers at site No 2016.00

784 Repainting 100 kVA transformers at site No 2530.00

785 Repainting 160 kVA transformers at site No 3381.00

786 Repainting 250 kVA transformers at site No 5097.00

787 Repainting 500 kVA transformers at site No 6776.00

801 Loading HT TW/RSJ/Rail pole to Hand cart from the stacking place and No 199.00
unloading the same at work site.

802 Transporting one HT TW/RSJ/Rail pole by Hand cart - limited to 4km P/km 199.00
(excluding loading and unloading)
803 Transporting one HT TW/RSJ/Rail pole by Head load for an average distance P/km 811.00
of one km (limited to 0.3km).
804 Fitting and erecting one HT TW Pole in position incl. fitting cross arm, digging No 1109.00
& back filling pit, drawing earth leads.
805 Fitting and erecting one HT RSJ Pole in position incl. fitting cross arm, digging No 1109.00
& back filling pit, drawing earth leads.
806 Fitting and erecting one HT Rail Pole in position incl. fitting cross arm, digging No 1109.00
& back filling pit, drawing earth leads.
807 Fitting and erecting one HT DP using TW pole in position incl. fitting 2 channel No 3510.00
cross arm, digging & back filling pit, drawing earth leads.

808 Fitting and erecting one HT DP using RSJ pole in position incl. fitting 2 No 3510.00
channel cross arm, digging & back filling pit, drawing earth leads.

809 Fitting and erecting one HT DP using Rail pole in position incl. fitting 2 No 3510.00
channel cross arm, digging & back filling pit, drawing earth leads.

810 Fitting and providing one Strut using HT TW pole incl. digging & back filling No 981.00
pit.
811 Fitting and providing one Strut using HT RSJ pole incl. digging & back filling No 981.00
pit.
812 Fitting and providing one Strut using HT Rail pole incl. digging & back filling No 981.00
pit.
813 Fitting and providing one HT Fly stay for 11kV pole using HT TW pole incl. No 2015.00
digging & back filling pits, drawing earth leads.
814 Fitting and providing one HT Fly stay for 11kV pole using HT RSJ pole incl. No 2015.00
digging & back filling pits, drawing earth leads.
815 Fitting and providing one HT Fly stay for 11kV pole using HT Rail pole incl. No 2015.00
digging & back filling pits, drawing earth leads.
816 Insertion of one HT TW pole in existing line incl. digging & backfilling pit, No 1203.00
fitting cross arm, insulators, binding etc.
817 Insertion of one HT RSJ pole in existing line incl. digging & backfilling pit, No 1203.00
fitting cross arm, insulators, binding etc.
818 Insertion of one HT Rail pole in existing line incl. digging & backfilling pit, No 1203.00
fitting cross arm, insulators, binding etc.
826 Loading LT TW/RSJ/Rail pole to Hand cart from the stacking place and No 93.00
unloading the same at work site.
827 Transporting one LT TW/RSJ/Rail pole by Hand cart - limited to 4km P/km 93.00
(excluding loading and unloading).
828 Transporting one LT TW/RSJ/Rail pole by Head load - for an average distance P/km 412.00
of one km (limited to 0.3km).
829 Erecting one LT TW Pole in position incl. digging & back filling pit. No 679.00
830 Erecting one LT RSJ Pole in position incl. digging & back filling pit. No 679.00

831 Erecting one LT Rail Pole in position incl. digging & back filling pit. No 679.00

832 Providing Strut using LT TW pole incl. digging and back filling pit. No 602.00
833 Providing Strut using LT RSJ pole incl. digging and back filling pit. No 602.00

834 Providing Strut using LT Rail pole incl. digging and back filling pit. No 602.00

835 Providing Fly stay for LT pole using LT TW pole incl. digging and back filling No 1296.00
pit.
836 Providing Fly stay for LT pole using LT RSJ pole incl. digging and back filling No 1296.00
pit.
837 Providing Fly stay for LT pole using LT Rail pole incl. digging and back filling No 1296.00
pit.
838 Constructing one span Sph OH line for giving S/C using TW pole with one stay No 1634.00
incl. digging & back filling 2 pits, cutting tree branches.

839 Constructing one span Sph OH line for giving S/C using RSJ pole with one stay No 1634.00
incl. digging & back filling 2 pits, cutting tree branches.

840 Constructing one span Sph OH line for giving S/C using Rail pole with one stay No 1634.00
incl. digging & back filling 2 pits, cutting tree branches.

841 Constructing one span Sph OH line for giving S/C using TW pole with TW No 1681.00
strut incl. digging& back filling 2 pits, cutting tree branches.
842 Constructing one span Sph OH line for giving S/C using RSJ pole with RSJ No 1681.00
strut incl. digging & back filling 2 pits, cutting tree branches.

843 Constructing one span Sph OH line for giving S/C using Rail pole with Rail No 1681.00
strut incl. digging& back filling 2 pits, cutting tree branches.

844 Constructing one span Sph OH line for giving S/C using TW pole without No 1079.00
stay/strut incl. digging& back filling pit, cutting tree branches.

845 Constructing one span Sph OH line for giving S/C using RSJ pole without No 1079.00
stay/strut incl. digging& back filling pit, cutting tree branches.

846 Constructing one span Sph OH line for giving S/C using Rail pole without No 1079.00
stay/strut incl. digging& back filling pit, cutting tree branches.

847 Constructing one span 3ph OH line for giving S/C using TW pole with one stay No 1988.00
incl. digging & back filling 2 pits, cutting tree branches.

848 Constructing one span 3ph OH line for giving S/C using RSJ pole with one stay No 1988.00
incl. digging& back filling 2 pits, cutting tree branches.

849 Constructing one span 3ph OH line for giving S/C using Rail pole with one stay No 1988.00
incl. digging& back filling 2 pits, cutting tree branches.

850 Constructing one span 3ph OH line for giving S/C using TW pole with TW No 2035.00
strut incl. digging& back filling 2 pits, cutting tree branches.
851 Constructing one span 3ph OH line for giving S/C using RSJ pole with RSJ No 2035.00
strut incl. digging& back filling 2 pits, cutting tree branches.

852 Constructing one span 3ph OH line for giving S/C using Rail pole with Rail No 2035.00
strut incl. digging & back filling 2 pits, cutting tree branches.

853 Constructing one span 3ph OH line for giving S/C using TW pole without No 1434.00
stay/strut incl. digging& back filling pit, cutting tree branches.

854 Constructing one span 3ph OH line for giving S/C using RSJ pole without No 1434.00
stay/strut incl. digging& back filling pit, cutting tree branches.

855 Constructing one span 3ph OH line for giving S/C using Rail pole without No 1434.00
stay/strut incl. digging& back filling pit, cutting tree branches.

856 Providing WP support with TW pole incl. digging & back filling pit. No 635.00
857 Renewal of existing damaged/old 11kV pole with new TW pole in place and No 1862.00
refitting of all items incl. conveyance (except pole).

858 Renewal of existing damaged/old 11kV pole with new RSJ pole in place and No 1862.00
refitting of all items incl. conveyance (except pole).
859 Renewal of existing damaged/old 11kV pole with new Rail pole in place and No 1862.00
refitting of all items incl. conveyance (except pole).
860 Renewal of existing damaged/old 11kV DP with new TW DP in place and No 5350.00
refitting of all items incl. conveyance (except poles).

861 Renewal of existing damaged/old 11kV DP with new RSJ DP in place and No 5350.00
refitting of all items incl. conveyance (except poles).

862 Renewal of existing damaged/old 11kV DP with new Rail DP in place and No 5350.00
refitting of all items incl. conveyance (except poles).

863 Renewing damaged Transformer DP structure with new TW Transformer DP No 18162.00


and re-erecting all accessories & Transformer (excluding renewal of pipe
earthing).

864 Renewing damaged Transformer DP structure with new RSJ Transformer DP No 18162.00
and re-erecting all accessories & Transformer (excluding renewal of pipe
earthing).

865 Renewing damaged Transformer DP structure with new Rail Transformer DP No 18162.00
and re-erecting all accessories & Transformer (excluding renewal of pipe
earthing) .

866 Renewal of existing damaged/old 11kV Strut with new TW strut in place incl. No 1471.00
excavation & backfilling of pit and conveyance (except pole).

867 Renewal of existing damaged/old 11kV Strut with new RSJ strut in place incl. No 1471.00
excavation & backfilling of pit and conveyance (except pole).
868 Renewal of existing damaged/old 11kV Strut with new Rail strut in place incl. No 1471.00
excavation & backfilling of pit and conveyance (except pole).

869 Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal No 3022.00
of HT TW pole and refitting of all items and conveyance (except pole).

870 Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal No 3022.00
of HT RSJ pole and refitting of all items and conveyance (except pole).

871 Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal No 3022.00
of HT Rail pole and refitting of all items and conveyance (except pole).

872 Renewal of existing damaged/old LT (Sph line) pole with new TW pole in No 1298.00
place and refitting of all items incl. conveyance (except pole).

873 Renewal of existing damaged/old LT (Sph line) pole with new RSJ pole in No 1298.00
place and refitting of all items incl. conveyance (except pole).

874 Renewal of existing damaged/old LT (Sph line) pole with new Rail pole in No 1298.00
place and refitting of all items incl. conveyance (except pole).

875 Renewal of existing damaged/old LT (3ph line) pole with new TW pole in No 1536.00
place and refitting of all items incl. conveyance (except pole).

876 Renewal of existing damaged/old LT (3ph line) pole with new RSJ pole in No 1536.00
place and refitting of all items incl. conveyance (except pole).

877 Renewal of existing damaged/old LT (3ph line) pole with new Rail pole in No 1536.00
place and refitting of all items incl. conveyance (except pole).

878 Renewal of existing damaged/old LT Strut with new TW strut in place and No 774.00
refitting of all items incl. conveyance (except pole).

879 Renewal of existing damaged/old LT Strut with new RSJ strut in place and No 774.00
refitting of all items incl. conveyance (except pole).

880 Renewal of existing damaged/old LT Strut with new Rail strut in place and No 774.00
refitting of all items incl. conveyance (except pole).

881 Renewal of damaged LT Fly stay with new Fly stay incl. new LT TW pole in No 1815.00
place and refitting of all items, conveyance (except pole).

882 Renewal of damaged LT Fly stay with new Fly stay incl. new LT RSJ pole in No 1815.00
place and refitting of all items, conveyance (except pole).

883 Renewal of damaged LT Fly stay with new Fly stay incl. new LT Rail pole in No 1815.00
place and refitting of all items, conveyance (except pole).

926 Excavation of cable trench in all classes of soil and backfilling after laying of m 181.00
cable (excluding laying of cable).

927 Additional rate for excavation of cable trench in exceptionally hard conditions m 106.00
( like in *ordinary rock).
928 Laying HT XLPE UG cable (of sizes upto and incl. 3x185 sqmm) as per m 259.00
specification excl. excavation and backfilling.

929 Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. m 304.00
3x300 sqmm) as per specification excl. excavation and backfilling.

930 Doing straight joint on cables of sizes upto and incl. 3x185 sqmm using the No 1857.00
cable jointing kit supplied departmentally as per specification.

931 Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. No 1909.00
3x300 sq mm using the cable jointing kit supplied departmentally as per
specification.
932 Doing one cable end termination on cables of sizes upto and incl. 3x185 sqmm No 1086.00
using the cable jointing kit supplied departmentally.

933 Doing one cable end termination on cables of sizes beyond 3x185 sqmm and No 1137.00
upto and incl. 3x300 sq mm using the cable jointing kit supplied
departmentally.
934 Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special No 691.00
type cable clamps incl. cost of extra materials if needed and giving necessary
connections.
935 Excavation of cable trench (soil surface) and digging out the faulty cable from m 161.00
the trench and refilling after work. (excluding joining).

936 Additional rate for excavating trench on tarred/concrete surface of specified m 161.00
size.

937 Dismantling faulty cable end from the structure/pole and mounting the same No 448.00
after redoing End termination and giving connections. (excluding end
termination).
951 Constructing Transformer plinth inclusive of cost of all materials (as per No 36650.00
specification).

952 Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material No 3717.00
(as per specification).
953 Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS m2 1713.00
flat and 8 mm MS rod as specified, incl cost of transportation & foundation

954 Providing yard metalling with 6mm & 40mm thick blue metal as specified after m2 649.00
constructing a curb wall.

956 Providing Transformer fencing using GI chain link. m2 1422.00


957 Brick work in cement mortar for superstructure as per the direction of m3 8855.00
departmental staff.

955 Providing one Earth using earth pipe incl. digging & backfilling pit and supply No 2965.00
of charcoal, salt, sand etc.

0 Cost of installation & commissioning including transportation of materials of 0.00


Data Aquisition compatible Extensible type Ring Main Unit without of
different specifications

991 RMU Bus Couplers / Add-On units with Load Break switch(s) & Earth switch No 27065.00

992 RMUs with two nos load break switches & one VCB No 40376.00

993 Additional rate for RMUs with one additional Load Break switch / VCB No 8689.00

994 Coupling of Busbars Set 2811.00

995

1001

1002

1003

1004

1005

1006

1007

1008

1009

1010
1011

1012

1013

1014

1015

1016

1017

1018

1019

1020

1021

1022

1023

1024

1025

1026

1027

1028

1029
1030

1031

1032

1033

1034

1035

1036

1037

1038

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048
1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

Materials Rate
1 PSC Pole 7m E
2 PSC Pole 8m E
3 PSC Pole 9m E
4 A Pole 10m E
5 A Pole 11m E
6 A Pole 12m E
7 A Pole 13m E
8 A Pole 14m E
9 Pin insulator with pin and packing clamp - LT E
10 Pin insulator with pin - LT E
11 Packing clamp - LT E
12 Pin insulator with pin -11kV E
13 Tension Set with Insulator Disc - 11 kV E
14 Disc insulator 11 kV E
15 Composite Disc Insulator -11kV E
16 Hard ware fittings 11kV E
17 MS Cleat E
18 GI Cleat E
19 Pole top bracket - F Type -11 kV E
20 Shackle insulator with strap bolt and nut LT E
21 Shackle insulator - LT E
22 GI Strap with bolt and nut E
23 Line spacer -2 Line E
24 Line spacer -4 Line E
25 Stay Set Complete - 11 kV E
26 Stay Set Complete - LT E
27 Stay insulator - 11 kV E
28 Stay insulator - LT E
29 Stay rod - HT E
30 Stay rod - LT E
31 Stay Tightner - HT E
32 Stay Tightner - LT E
33 RCC stayblock E
34 AB Switch 11kV 400A E
35 Flexible copper belt for AB switch E
36 Aluminium connector for AB switch - 400A E
37 Female contact for AB switch - 400A E
38 Male contact for AB switch - 400A E
39 Insulator for AB switch - 11 kV E
40 Drop Out Fuse Unit 11 kV E
41 Fuse Unit 63A E
42 Fuse Unit 100A E
43 Fuse Unit 200A E
44 Fuse Unit 300A E
45 HRC fuse unit E
46 Fuse wire kg
47 Lightning Arrestor 11KV E
48 2 Line cross arm E
49 2 Line cross arm with clamp, bolt and nut E
50 4 Line cross arm E
51 4 Line cross arm with clamp, bolt and nut E
52 Clamp for 2/4 line cross arm E
53 Channel cross arm - 1.8m E
54 Channel cross arm - 1.8m with clamp, bolt and nut E
55 Channel cross arm - 2.4m E
56 Channel cross arm - 2.4m with clamp, bolt and nut E
57 Channel cross arm - 3m E
58 Channel cross arm - 3m with clamp, bolt and nut E
59 Clamp for channel cross arm E
60 V Cross arm - 11 kV E
61 Clamp for V Cross arm E
62 GI Bolt and nut (assorted size) kg
63 PG clamp (Raccoon) E
64 ACSR Raccoon km
65 ACSR Rabbit km
66 ACSR Weasel km
67 ACSR Squirrel km
68 Aluminium armoured cable 3.5C x 150 sq.mm - LT mtr
69 PVC cable 1.5 Single Core (WP Wire 1.5 sq.mm) Coil
70 PVC cable 1/1.8 Twin Core (WP Wire 2.5 sq.mm) Coil
71 PVC cable 1/2.8 Twin Core (WP Wire 6 sq.mm) Coil
72 PVC cable 25 sq.mm Single Core m
73 PVC cable 50 sq.mm Single core m
74 PVC cable 70 sq.mm Single core m
75 PVC cable 95 sq.mm Single core m
76 PVC cable 120 sq.mm Single core m
77 PVC cable 150 sq.mm Single core m
78 PVC cable 185 sq.mm Single core m
79 XLPE cable 25 sq.mm Single core - LT m
80 XLPE Cable 50 sq.mm Single core - LT m
81 XLPE Cable 70 sq.mm Single core - LT m
82 XLPE Cable 95 sq.mm Single core - LT m
83 XLPE Cable 120 sq.mm Single core - LT m
84 XLPE Cable 150 sq.mm Single core - LT m
85 XLPE Cable 185 sq.mm Single core - LT m
86 XLPE Cable 3 x 300 sq.mm UG Cable m
87 End termination kit (Push on type) 300 sq.mm XLPE cable E
88 End termination kit (Heat shrinkable type) 300 sq.mm XLPE cable E
89 Straight joint kit (Heat shrinkable type) 300 sq.mm XLPE cable E
90 Straight joint kit - 3X300 sq.mm XLPE cable E
91 Aluminium Crimping socket 50 sq.mm E
92 Aluminium Crimping socket 70 sq.mm E
93 Aluminium Crimping socket 95 sq.mm E
94 Aluminium Crimping socket 120 sq.mm E
95 Aluminium Crimping socket 150 sq.mm E
96 Aluminium Crimping socket 185 sq.mm E
97 Earth pipe 2.5m - 40mm E
98 HT Stay wire E
99 GI Wire 5mm (No.6) kg
100 Transformer 25 kVA E
101 Transformer 50/63 kVA E
102 Transformer 100 kVA E
103 Transformer 160 kVA E
104 Transformer 250 kVA E
105 Transformer 315 kVA E
106 Transformer 500 kVA E
107 Transformer 100 kVA - 3 star rated E
108 Transformer 160 kVA - 3 star rated E
109 Silica gel kg
110 Single phase static meter E
111 Three phase static meter E
112 Three phase static CT meter E
113 DTR meter E
114 LT TOD meter E
115 CT - 100/5 E
116 CT - 150/5 E
117 CT - 200/5 E
118 CT/PT unit - 11 kV E
119 DTR Box E
120 Fluorescent Lamp - 40W E
121 Double tube fluorescent street light fitting with bracket, clamp, B&N E
122 Pipe fittings for fluorescent tube with clamp, bolt & nut E
123 Sealing Lead kg
124 Sealing wire kg
125 Polycarbonate meter seal E
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
HT LINE WORKS
LT LINE WORKS
SERVICE
CONNECTION
HT MAINTENANCE
WORK
FABRICATING
WORKS

LT MAINTENANCE
WORK
MAINTENANCE OF
SERVICE
CONNECTION
METER
CHANGING

DISMANTLING
HT
DISMANTLING
LT

STREET LIGHT
CLEARING
TOUCHINGS (HT)
CLEARING
TOUCHINGS (LT)

Tree Cutting

LOADING AND
UNLOADING
Transportation of
Transformer/pole
by lorry

Transportation of
Tr./pole by Country
boat
Painting

TW/RSJ/RAIL - HT
TW/RSJ/RAIL - LT
TW/RSJ/RAIL HT
MAINTENANCE
TW/RSJ/RAIL LT
MAINTENANCE

UG CABLE
CIVIL WORKS
Earthing

Installation of RMU

Custom Works
POLES

LINE MATERIALS
CABLE AND CONDUCTORS
TRANSFORMERS AND SPARES

METERING EQUIPMENTS

ELECTRIC LIGHT FITTINGS

OTHERS
Particulars in detail
Surveying one km 11kV line using Theodolite.
Surveying one km 11kV line using Ranging Rod.
Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation).

Transporting one HT PSC pole by Hand cart - normally limited to 4km (excluding loading and unloading).
Loading HT 'A' type pole of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding transportation).

Transporting 'A' type pole of all sizes by Hand cart - normally limited to 4km (excluding loading and unloading).
Loading HT Four legged lattice structure of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding trans

Transporting Four legged lattice structure of all sizes by Hand cart - normally limited to 4km (excluding loading and unloading).
Transporting one HT PSC pole by Head load- for an average distance of one km where transportation by hand cart is not possible. (normally li

Transporting 'A' type pole of all sizes by Head load- for an average distance of one km where transportation by hand cart is not possible. (norm

Transporting Four legged lattice structure of all sizes by Head load- for an average distance of one km where transportation by hand cart is not
to 0.3km).
Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standar
of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
Fitting and erecting one HT 'A' type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per stan
length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).
Fitting and erecting one HT Four legged lattice structure in position including fitting cross arm, digging and back filling pit in ordinary soil (as
sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).

Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point.

Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling p
sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).

Fitting and erecting one HT Double Pole Structure using 'A' type pole in position including fitting 2 No. channel cross arm, digging and back fi
drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).

Fitting and erecting one HT Double Pole Structure using Four legged lattice structure in position including fitting 2 channel cross arms, digging
ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).

Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.

Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.

Fitting and providing one Strut using 'A' type pole, including digging and back filling pit in ordinary soil.

Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing suffici
to the ground for earthing (excluding provision of earthing).
Fitting and providing one HT Fly stay for 11kV pole using 'A' type pole including digging and back filling pits in ordinary soil, drawing sufficie
the ground for earthing (excluding provision of earthing).
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc.,
GI earth leads to the ground for earthing (excluding provision of earthing).
Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding e
of GI earth leads to the ground for earthing (excluding provision of earthing).
Insertion of one HT Four legged lattice structure in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insul
sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.

Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock.

Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock.

Additional rate for excavation of Pit for 'A' type pole in Laterite.
Additional rate for excavation of Pit for 'A' type pole in Hard Laterite.

Additional rate for excavation of Pit for 'A' type pole in Soft Rock.
Additional rate for excavation of Pit for 'A' type pole in Rock.
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and
wherever necessary excluding cut point works.
Stringing of one km 11kV line with ACSR Rabbit (3 conductors) after fitting insulators and giving jumper connections including cutting and r
wherever necessary excluding cut point works.
Fitting and erecting one HT Double Pole Structure using PSC pole in position, providing 2 stays, fitting 8 channel cross arms, fitting AB switch
etc., drawing GI earthing leads (separate GI strip for LA through insulated conduit) to the ground, mounting of 100kVA Transformer on DP st
Transformer belt, fixing 2way distribution box, DTR meter with box, giving all HT & LT connections upto OH lines, fixing/sign writing all sta
including digging & back filling pit in ordinary soil excluding provision of pipe earthing, yard fencing and metaling.

Fitting 6 channel cross arms, AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines, etc. on existing DP structure, Fixing
for one set (3No.) of LT fuses, drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mo
poles.
Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distrib
set (3No.) of LT fuses, , drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting

Fitting 3 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LT connections upto OH lines, etc. on existing DP structure, fixing distribu
set (3No.) of LT fuses, drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting o

Erecting one CT-PT unit to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site, bu
transporting CT-PT.
Erecting one 25kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading
transporting transformer.
Erecting one 63kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading
transporting transformer.
Erecting one 100kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading
transporting transformer.
Erecting one 160kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading
transporting transformer.
Erecting one 100kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place
excluding cost for transporting transformer.
Erecting one 160kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place
excluding cost for transporting transformer.

Erecting one 250kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place
excluding cost for transporting transformer.

Erecting one 315kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place
excluding cost for transporting transformer.

Erecting one 500kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place
excluding cost for transporting transformer.

Installing one DTR Meter with box (normal size 40x25x100cm) on existing poles including fixing of 3 CTs on bus bar, laying and termination
lugs, fixing of meters, capacitors, control fuses and giving the complete connections including conveyance of materials.
Installing one Border Meter with box (normal size 40x25x100cm) on existing poles including laying and termination of control cable using pro
control fuses and giving the complete connections including conveyance of materials.
Erection of LT 2 way distribution box (normal size 130x40x90cm) on existing cross arm, giving connection including cable and earth connecti

Erection of LT 3 way distribution box (normal size 160x40x90cm) on existing cross arm, giving connection including cable and earth connecti

Erection of LT 4 way distribution box (normal size 190x40x90cm) on existing cross arm, giving connection including cable and earth connecti

Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line.

Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum dista
pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling.
Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure a
distance between different earth pipes in loose soil.
Providing one Driven Earth using Steel rod of size 19mm dia, 2.5m length at a minimum distance of 1.5m away from the pole/structure and m
between different earth pipes in loose soil.
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.

Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.

Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.

Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distanc
pole/structure in ordinary soil & backfilling.
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.

Fitting one set (3No.) 11kV DO Fuse and giving connection.


Fitting one set AB switch, DO fuse (3No.), LA (3No.), giving all connections from HT line to Transformer bush and drawing earth leads to the
excluding provision of earthing and fixing channels.
Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, exclu

Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles).

Fitting one Additional V cross arm in existing single pole including conveyance of materials.
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.

Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials.

Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials.

Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV DP including conveyance of materials.

Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.

Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.

Providing Bucket type cradling for one span 11kV line using 8 SWG GI wire including provision of two stays and drawing sufficient length of
ground for earthing, excluding provision of earthing
Providing barbed wire anti-climbing protection (2.5m height) for one 11kV pole.
Providing special type anti-climbing protection (2.5m height) for one 11kV pole.

Additional rate for providing one HT Pin with insulator, complete on any type of HT pole.
Additional rate for providing one F top bracket complete, on any type of HT pole.
Additional rate for excavation of Pit for 4 legged pole in Laterite.
Additional rate for excavation of Pit for 4 legged pole in Hard Laterite.

Additional rate for excavation of Pit for 4 legged pole in Soft Rock.
Additional rate for excavation of Pit for 4 legged pole in Rock.
Fitting one Additional 2.4m Channel cross arm in existing single pole including conveyance of materials.

Insertion of one HT PSC pole in existing HT/LT line including digging & back filling of pit in ordinary soil, fitting cross arm, insulator, bindin
length of GI earth leads to the ground for earthing (excluding provision of earthing).
Installing one DTR Meter with box of suitable size at a minimum height of 1.25 m above the ground level, in the existing Channel/Angle cross
including fixing of 3 CTs on bus bar, laying and termination of control cable using proper lugs, fixing of meters, control fuses and giving conne
conveyance of materials
Loading LT PSC pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation).

Transporting one LT PSC pole by Hand cart - (normally limited to 4km (excluding loading and unloading).

Transporting one LT PSC pole by Head load - for an average distance of one km where transportation by hand cart is not possible. (normally l

Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil.

Providing Stay for LT poles including digging & back filling pit in ordinary soil.
Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil.
Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil.

Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite.

Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite.
Additional rate for excavation of one Pit for LT Pole/LT Stay in Soft Rock.

Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for on
line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase & Neutral and AC
for one km LT single phase 3 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (exce

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel
three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from s

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel
for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles)

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Rabbit)
realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all mate
stacking place.
Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Weasel)
realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all mate
stacking place.

Stringing, shackling, fitting insulators (excluding fitting of cross arm) and binding, giving jumper connection etc. for one km additional conduc
existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary an
(except poles) from stacking place.
Stringing, shackling, fitting insulators (excluding fitting of cross arm) and binding, giving jumper connection etc. for one km additional conduc
existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary an
(except poles) from stacking place.
Conversion of one km LT single phase 2 wire line to LT three phase 4 wire line including dismantling the existing 2 conductors, stringing 3 A
Phase & one Weasel for Neutral including conveyance of materials.

Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc.

Providing Guarding for LT line using No.8 SWG GI wire one span for road crossing and drawing sufficient length of GI earthing leads to the
excluding provision of earthing.
Fitting one No. LT lightning arrestor in LT OH line and giving connections excluding earthing.

Conversion of one km LT single phase 3 wire line to LT three phase 5 wire line including dismantling the existing 3 conductors, stringing 3 AC
two Weasel (for Neutral & Street Main) conductors including conveyance of materials.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Weasel)
realignment of one of the existing conductor, including cutting and removing tree branches wherever necessary and conveyance of all materials
place.

Giving one single phase WP service connection including conveyance of materials, fixing meter, drawing WP wire, with GI support wire etc. a

Giving one three phase WP service connection (upto 10kW) including conveyance of materials, fixing meter, drawing WP wire with GI supp
Giving one three phase WP service connection (above 10kW to 25kW) including conveyance of materials, fixing meter, drawing WP wire wi
standards.
Giving one three phase WP service connection using CT including conveyance of materials, fixing meter, CT, drawing WP wire etc. as per st

Converting single phase WP service connection to three phase service connection by replacing existing single phase meter with three phase
support wire and other accessories including conveyance of all materials.
Converting three phase WP service connection to single phase service connection by replacing existing three phase meter with single phase
support wire and other accessories including conveyance of all materials.
Constructing one span single phase OH line for giving service connection using PSC pole with one stay including digging & back filling 2 pits
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span single phase OH line for giving service connection using PSC pole with PSC strut (without stay) including digging & ba
soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

Constructing one span single phase OH line for giving service connection using PSC pole without stay/strut including digging & back filling pi
removing tree branches, excluding WP portion and transportation of poles.

Constructing one span three phase OH line for giving service connection using PSC pole with one stay including digging & back filling 2 pits
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span three phase OH line for giving service connection using PSC pole with PSC strut (without stay) including digging & ba
soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

Constructing one span three phase OH line for giving service connection using PSC pole without stay/strut including digging & back filling pi
removing tree branches, excluding WP portion and transportation of pole.

Conversion of one span OH single phase 2 wire service line to three phase 4 wire service line including dismantling existing conductors, string
Rabbit for phase and Weasel for neutral) including conveyance of all materials.

Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator,
transportation of poles.
Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator,
transportation of poles.
Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles.

Installing one pole top service connection box single phase 6 way and giving connections.

Installing one pole top service connection box three phase 6 way and giving connections.

Giving one single phase service connection in existing panel board.


Giving one three phase service connection in existing panel board.
Converting single phase WP service connection to three phase service connection by replacing existing single phase meter with three phase
support wire and other accessories including conveyance of all materials.

Converting single phase WP service connection to three phase service connection by replacing existing single phase meter with three phase
support wire and other accessories including conveyance of all materials.

Conversion of one span OH single phase 2 wire line to three phase 5 wire line including dismantling existing conductors, stringing new conduc
and Weasel for neutral) including conveyance of all materials.
Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new PSC pole in place including excavation, erection of new pole, backfilling
etc. and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new 'A' type pole in place including excavation, erection of new pole, backfilli
items etc. and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new Four legged lattice structure in place including excavation, erection of new
refitting of all items etc. and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit
and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV PSC/RCC Pole with new 'A' type pole in place including excavation, erection of new pole, backfilling
etc. and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV PSC/RCC Pole with new Four legged lattice structure in place including excavation, erection of new p
refitting of all items etc. and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV 'A' type pole with new 'A' type pole in place including excavation of pole pit, erection of new pole, bac
items etc. and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV Four legged lattice structure with new Four legged lattice structure in place including excavation of pol
backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV TW/RSJ/Rail DP (2 channel cross arm) with new PSC DP in place including excavation, erection of n
refitting of all items etc. and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV PSC DP (2 channel cross arm) with new PSC DP in place including excavation, erection of new pole,
all items etc. and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new 'A' type DP in place including excavation, erection of new pole, backfilling
etc. and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new Four legged lattice structure DP in place including excavation, erection of
refitting of all items etc. and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV PSC/RCC DP with new 'A' type DP in place including excavation, erection of new pole, backfilling pi
and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV PSC/RCC DP with new Four legged lattice structure DP in place including excavation, erection of new
refitting of all items etc. and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV 'A' type DP with new 'A' type DP in place including excavation of pole pit, erection of new pole, back
items etc. and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV Four legged lattice structure DP with new Four legged lattice structure DP in place including excavatio
pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.
Renewing one damaged/old TW/RSJ/Rail Transformer DP structure with a new PSC Transformer DP including excavation, dismantling acces
fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories
new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

Renewing one damaged/old TW/RSJ/Rail Transformer DP structure with a new 'A' type Transformer DP including excavation, dismantling ac
fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories
new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

Renewing one damaged/old TW/RSJ/Rail Transformer DP structure with a new Four legged lattice structure Transformer DP including excava
like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re ere
Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal o

Renewing one damaged PSC/RCC Transformer DP structure with a new PSC Transformer DP including excavation, dismantling accessories l
LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including
as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

Renewing one damaged PSC/RCC Transformer DP structure with a new 'A' type Transformer DP including excavation, dismantling accessori
LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories includ
DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

Renewing one damaged PSC/RCC Transformer DP structure with a new Four legged lattice structure Transformer DP including excavation, d
AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting
Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal o

Renewal of one damaged HT Pin insulator.


Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole.

Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines.

Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items
materials.
Renewal of existing damaged/broken old 11kV Stay to the existing stay rod.

Replacing/inserting HT Stay insulator on the existing stay.


Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating,
all items and conveyance of all materials except pole.

Renewal of any type of existing damaged/old 11kV Strut with new 'A' type strut in place including excavation & backfilling of pit, consolidatin
of all items and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV Fly stay with new Fly stay including renewal of PSC pole (used for fly stay) in place, excavation & bac
dismantling and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV Fly stay with new Fly stay including renewal of 'A' type pole in place including excavation & backfillin
dismantling and refitting of all items and conveyance of all materials except pole.

Re-Tensioning one span 11kV line including replacing pin insulators, pin binding, jumpering, replacing insulators cross arms disc, tightening s
wherever necessary, including conveyance of all materials complete.
Re-joining one snapped HT conductor after removing damaged portion including re-tensioning and conveyance of all materials complete.
Repairing one limb of AB switch by replacing male and female contacts, damaged insulators, applying petroleum jelly, lubricants etc. and reco
reconditioning of the operating mechanism.
Replacing one set AB switch including dismantling existing AB, giving connections etc.

Renewal of one No. 11kV LA including conveyance, reconnecting and dismantling old LA (excluding earthing).

Renewal of one No. 11kV DO Fuse including conveyance, reconnecting and dismantling old DO Fuse (excluding earthing).

Renewing 11kV Jumper connection for one phase from OH line to Transformer through AB switch, DO Fuse and connection to LA using Cop
standard specification including dismantling old jumpers.
Renewing one 11kV Jumper connection using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line)

Renewing one 11kV Jumper connection using Copper/ACSR conductor as per standard specification.

Renewing one V Cross arm on the 11kV Pole including dismantling and conveyance.

Renewing one 1.8m Channel cross arm on the 11kV Pole including dismantling and conveyance.

Renewing one damaged cross arm with 100x50mm, 2.4m/3m Channel cross arm on the 11kV DP including dismantling and conveyance.

Renewing one damaged cross arm with 35x35x5mm, 2.4m/3m Channel cross arm on the 11kV DP including dismantling and conveyance.

Providing stay (temporary nature) by piling Cut Ends in kole land providing insulator, including fabrication of cut ends and conveyance of mat

Straightening one slanted 11kV pole after unbinding the line and binding the line after work.

Straightening one slanted 11kV Cut pole after lowering down the existing line and stringing the line after work.

Dismantling existing CT/PT unit, erecting new CT/PT unit in place, giving connections etc. including loading/unloading of old and new CT/PT

Dismantling existing 25kVA Transformer, erecting new 25kVA Transformer in place, giving connections etc. including loading/unloading of o
Transformer at site.
Dismantling existing 63kVA Transformer, erecting new 63kVA Transformer in place, giving connections etc. including loading/unloading of o
Transformer at site.
Dismantling existing 100kVA Transformer, erecting new 100kVA Transformer in place, giving connections etc. including loading/unloading o
site.
Dismantling existing 160kVA Transformer, erecting new 160kVA Transformer in place, giving connections etc. including loading/unloading o
site.
Dismantling existing 250kVA Transformer, erecting new 250kVA Transformer in place, giving connections etc. including loading/unloading o
site.
Dismantling existing 315kVA Transformer, erecting new 315kVA Transformer in place, giving connections etc. including loading/unloading o
site.
Dismantling existing 500kVA Transformer, erecting new 500kVA Transformer in place, giving connections etc. including loading/unloading o
site.
Enhancing Transformer by dismantling existing 63kVA Transformer, erecting new 100kVA Transformer in place, giving connections etc. inclu
old and new Transformer at site.
Enhancing Transformer by dismantling existing 100kVA Transformer, erecting new 160kVA Transformer in place, giving connections etc. inc
old and new Transformer at site.
Enhancing Transformer by dismantling existing 160kVA Transformer, erecting new 250kVA Transformer in place, giving connections etc. inc
old and new Transformer at site.
Enhancing Transformer by dismantling existing 250kVA Transformer, erecting new 315kVA Transformer in place, giving connections etc. inc
old and new Transformer at site.
Enhancing Transformer by dismantling existing 315kVA Transformer, erecting new 500kVA Transformer in place, giving connections etc. inc
old and new Transformer at site.

Reconductoring one km 11kV Copper/old AAC/ACSR line of 3 conductors with new ACSR Raccoon including cutting of tree branches wher
of materials to and from the stacking place.
Reconductoring one km 11kV Copper/old AAC/ACSR line of 3 conductors with new ACSR Rabbit including cutting of tree branches wherev
materials to and from the stacking place.
Renewal of existing damaged/old 11kV Fly stay with new Fly stay (where replacement of stay-pole / stay-rod is not required) in place , disman
including conveyance.
Renewal of existing damaged/old 11kV Fly stay with new Fly stay where renewal of PSC pole (used for fly stay), stay plate, stay rod etc is not
dismantling and refitting of all other items required for fly stay and conveyance of all materials.
Drilling hole of various sizes on existing Channel/Cross Arm.

Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc.

Cutting Channel/Cross Arm/Angle Iron into two pieces.


Renewal of existing damaged/old LT TW/RSJ/Rail (single phase line) pole with new PSC pole in place including excavation of pole pit, erectio
and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection o
and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT TW/RSJ/Rail (three phase line) pole with new PSC pole in place including excavation of pole pit, erectio
and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT PSC/RCC (three phase line) pole with new PSC pole in place including excavation of pole pit, erection o
and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole.

Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitti
conveyance of all materials.
Renewal of existing damaged/broken old LT stay in existing stay rod.

Replacing/inserting LT stay insulator on the existing stay.


Renewal of existing damaged/old LT Strut of any type with new PSC strut in place including excavation of pit, erection of new strut, backfillin
and refitting of all items and conveyance of all materials except pole.
Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including renewal of PSC pole (used for fly stay) in place, e
new Fly stay, backfilling, dismantling & refitting of all items and conveyance of all materials except pole.

Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening sta
wherever necessary including conveyance of all materials.
Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening sta
wherever necessary including conveyance of all materials.
Reshackling one span LT OH Additional conductor including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay,
wherever necessary including conveyance of all materials complete.
Re-joining one snapped LT conductor after removing damaged portion including Reshackling and conveyance of all materials complete.

Renewing one LT Jumper connection using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line).

Renewing one LT Jumper connection using Copper/ACSR conductor as per standard specification.

Providing/Inserting 2 line spacer on the existing LT OH line.


Providing/Inserting 3 line spacer on the existing LT OH line.
Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting t
binding etc. complete.
Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting t
binding etc. complete.
Straightening one slanted LT pole after unbinding the line and binding the line after work.

Straightening one slanted LT Cut Pole after lowering down the existing line and stringing the line after work.

Reconductoring (changing) one km LT single phase 2 wire OH Copper/old AAC/ACSR conductor line with new ACSR Rabbit conductor incl
materials to and from the stacking place.
Reconductoring (changing) one km LT three phase 4 wire OH Copper/old AAC/ACSR conductor line with new 3 ACSR Rabbit and one AC
including conveyance of materials to and from the stacking place.

Reconductoring (changing) one km LT OH Copper/old AAC/ACSR one conductor with new ACSR Rabbit conductor including conveyance o
stacking place.
Reconductoring (changing) one km LT OH Copper/old AAC/ACSR one conductor with new ACSR Weasel conductor including conveyance o
stacking place.
Reconductoring (changing) one km LT single phase 3 wire OH Copper/old AAC/ACSR conductor line with new 2 ACSR Rabbit and one AC
including conveyance of materials to and from the stacking place.

Stringing, shackling, fitting insulators (excluding fitting of cross arm) and binding, giving jumper connection etc. for one km additional conduc
existing LT line (where relocation of one existing conductor is also required) including cutting and removing tree branches wherever necessar
materials (except poles) from stacking place.
Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay where renewal of PSC pole (used for fly stay), stay plate, st
including dismantling & refitting of all items and conveyance of all materials.
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after com

Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after co

Redoing single phase WP service connection complete including lowering down the guy wire portion, repairing or changing WP wire, GI wire
Energy Meter cutout, neutral link etc., if necessary and reconnecting the same including conveyance of material to site from Section office at v

Redoing three phase WP service connection complete including lowering down the guy wire portion, repairing or changing WP wire, GI wire
Energy Meter cutout, neutral link etc., if necessary and reconnecting the same including conveyance of material to site from Section office at v

Shifting one No. single phase service connection metering equipment with all fittings including lowering down the WP service wire, dismantlin
making damage and refitting the same at new location and redoing the WP service wire with all fittings.
Shifting one No. three phase service connection metering equipment with all fittings including lowering down the WP service wire, dismantlin
making damage and refitting the same at new location and redoing the WP service wire with all fittings.
Shifting one No. three phase service connection metering equipment (CT connected) with all fittings including lowering down the WP service
Board without making damage and refitting the same at new location and redoing the WP service wire with all fittings.
Changing Faulty single phase energy meter including Dismantling of old meter, connecting of new meter/giving electric connection including c
the site and returning old meters to section store.

Changing Faulty three phase energy meter including Dismantling of old meter, connecting of new meter/giving electric connection including
the site and returning old meters to section store.

Changing Faulty three phase CT energy meter including Dismantling of old meter, replacing CTs, renewing PT connection, connecting new m
connection including conveyance of new meter to the site and returning old meters to section store.

Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling (without damage) one No. 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling one damaged 11kV 'A' type pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling (without damage) one 11kV 'A' type pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling one damaged 11kV Four legged lattice structure after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling (without damage) one 11kV Four legged lattice structure after disconnecting stays, strut etc. attached thereon and stacking the sam

Dismantling one damaged HT TW/RSJ/Rail Strut pole including removal of clamps and stacking.

Dismantling (without damage) one HT TW/RSJ/Rail Strut pole including removal of clamps and stacking.

Dismantling one damaged HT PSC/RCC Strut pole including removal of clamps and stacking.

Dismantling (without damage) one HT PSC/RCC Strut pole including removal of clamps and stacking.

Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper co
conductor and stacking the materials.
Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store.

Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store.

Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store.

Dismantling (without damage) one AB switch from existing structure and bringing back to section store.

Dismantling one HT pin insulator with pin and bring back to section store.

Dismantling one damaged AB switch from existing structure and bringing back to section store.
Dismantling transformer station with transformer erected in DP structure by dismantling HT Double Pole Structure using PSC pole after disco
channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipments, CTs, Distribution Box, statu
excluding the rate of dismantling transformer, earthing, stay sets & fencing.
Dismanling plinth mounted transformer station by dismantling HT Double Pole Structure using PSC pole after disconnecting stay wires, 8 cha
DO fuse, LA, GI earthing leads, DTR meter with box, Distribution Box, statutory display boards etc. but excluding the rate of dismantling tra
earthing, stayone
Dismantling setsdamaged
& fencing.
LT TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling (without damage) one LT TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.

Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling.

Dismantling one damaged LT TW/RSJ/Rail Strut pole including removal of clamps and stacking.

Dismantling (without damage) one LT TW/RSJ/Rail Strut pole including removal of clamps and stacking.

Dismantling one damaged LT PSC/RCC Strut pole including removal of clamps and stacking.

Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking.

Dismantling one LT 2 line cross arm with clamp from existing pole and stacking.
Dismantling one LT 4 line cross arm with clamp from existing pole and stacking.
Dismantling single phase WP service connection with meter & all accessories and bringing back to section store.

Dismantling three phase WP service connection with meter & all accessories and bringing back to section store.

Dismantling (without damage) one span of HT or LT cradling and stacking the same neatly and in good condition for re-use.

Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the condu

Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the condu

Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls p

Dismantling one section fuse from structure and bringing back to section store.
Dismantling one section fuse from distribution box and bringing back to section store.
Dismantling three phase CT connected WP service connection with metering equipmets & all other accessories and bringing back to section st

Wiring and installing one new ordinary street light fitting on existing pole and giving connections.

Wiring and installing one new CFL street light fitting on existing pole and giving connections.

Wiring and installing one new LED street light fitting on existing pole and giving connections

Dismantling (without damage) one ordinary street light/CFL/LED fitting from the pole and stacking.
Dismantling one ordinary street light/CFL/LED fitting from existing pole cleaning, rewiring, repairing/replacing the holder, changing bulbs an
position and giving connection.
Wiring and installing new set 2x40W fluorescent tube fitting on existing poles including giving connection.

Dismantling one set 2x40 W fluorescent tube fitting from existing pole cleaning, rewiring, repairing/replacing holder, changing tubes and refitti
giving connection.
Replacing bulb on existing street light.
Replacing CFL/LED on existing street light.
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting

Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole including disconnecting and

Wiring and installing new set Sodium Vapour lamp fitting on existing poles including giving connection (without using aerial lift).

Wiring and installing new set Mercury Vapour lamp fitting on existing poles including giving connection (without using aerial lift).

Wiring and installing new set Metal Halide lamp fitting on existing poles including giving connection (without using aerial lift).

Wiring and installing new set Sodium Vapour lamp fitting on existing poles including giving connection (using aerial lift).

Wiring and installing new set Mercury Vapour lamp fitting on existing poles including giving connection (using aerial lift).

Wiring and installing new set Metal Halide lamp fitting on existing poles including giving connection (using aerial lift).

Dismantling one Sodium Vapour/Mercury Vapour/Metal Halide lamp fitting from existing pole, cleaning, rewiring, repairing/replacing holder,
capacitor etc. and refitting the same in position and giving connection (without using aerial lift).

Dismantling one Sodium Vapour/Mercury Vapour/Metal Halide lamp fitting from existing pole, cleaning, rewiring, repairing/replacing holder,
capacitor etc. and refitting the same in position and giving connection (using aerial lift).
Dismantling one Sodium Vapour/Mercury Vapour/Metal Halide lamp fitting from the existing pole and refitting the same on newly erected pol
reconnecting wires (without using aerial lift).
Dismantling one Sodium Vapour/Mercury Vapour/Metal Halide lamp fitting from the existing pole and refitting the same on newly erected pol
reconnecting wires (using aerial lift).

Replacing holder, fused bulb/CFL, changing wires, giving connection etc. of street light including conveyance of all materials.

Wiring and installing new set 1x40W fluorescent tube fitting on existing poles including giving connection.

Dismantling one set 1x40 W fluorescent tube fitting from existing pole cleaning, rewiring, repairing/replacing holder, changing tubes and refitti
giving connection.
Dismantling one 1x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole including disconnecting and

Clearing touchings on 11kV HT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1
as specified by dept. (Urban/Town).
Clearing touchings on 11kV HT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1
as specified by dept. (Rural/Remote).

Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m
specified by dept. (Urban/Town).

Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m
specified by dept. (Rural/Remote).

Clearing touchings on 33kV lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 2.0m
specified by dept. (Urban/Town).

Clearing touchings on 33kV lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 2.0m
specified by dept. (Rural/Remote).

Clearing touchings on LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m fro
specified. (Urban/Town).

Clearing touchings on LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m fro
specified. (Rural/Remote).
Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the
etc. 1 No.
Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing th
stacking etc. 1 No.
Cutting trees having girth beyond 120cm but upto and including 180cm (felling trees including cutting of trunks and branches) and removing t
stacking etc. 1 No.

Cutting trees having girth beyond 30cm but upto and including 60cm, in between the line and Buildings where space for falling trees is not ava
including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.

Cutting trees having girth beyond 60cm but upto and including 120cm, in between the line and Buildings where space for falling trees is not av
including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.

Cutting trees having girth beyond 120cm but upto and including 180cm in between the line and Buildings where space for falling trees is not a
including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.

Labour charges for loading HT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transportation by any vehicle).

Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).

Labour charges for loading HT 'A' type pole from the stacking place and unloading the same at work site (transportation by any vehicle).

Labour charges for loading HT Four legged lattice structure from the stacking place and unloading the same at work site (transportation by any

Labour charges for loading LT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transportation by any vehicle).

Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
Unloading one Transformer (upto and including 160kVA) from any vehicle to ground including conveyance upto 25m at site.

Unloading one Transformer (above 160kVA) from any vehicle to ground including conveyance upto 25m at site.

Loading one Transformer (upto and including 160kVA) from ground to any vehicle including conveyance upto 25m at site.

Loading one Transformer (above 160kVA) from ground to any vehicle including conveyance upto 25m at site.

Dismantling one Transformer (upto and including 160kVA) from existing structure and loading to any vehicle directly, including disconnecting

Dismantling one Transformer (above 160kVA) from existing plinth and loading to any vehicle directly, including disconnecting HT/LT/Earth c

Dismantling one Transformer (upto and including 160kVA) from existing structure to ground, including disconnecting HT/LT/Earth connectio

Dismantling one Transformer (above 160kVA) from existing plinth to ground, including disconnecting HT/LT/Earth connections.

Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.

Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 numbers of poles. (Running km)

Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring
loading& unloading charges.

Transporting Transformers by hired vehicle to a distance beyond 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ri
km).

Engaging one boat man with Boat/Country Boat/Vallam.

Transporting HT TW/RSJ/Rail Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country b

Transporting HT TW/RSJ/Rail Poles by Country boat/Vallam beyond 6km.

Transporting HT PSC Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Valla

Transporting HT PSC Poles by Country boat/Vallam beyond 6km.


Transporting 'A' type Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Valla

Transporting 'A' type Poles by Country boat/Vallam beyond 6km.


Transporting Four legged lattice structures by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Cou

Transporting Four legged lattice structures by Country boat/Vallam beyond 6km.


Transporting LT TW/RSJ/Rail Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country b

Transporting LT TW/RSJ/Rail Poles by Country boat/Vallam beyond 6km.


Transporting LT PSC Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Valla
Transporting LT PSC Poles by Country boat/Vallam beyond 6km.
Transporting 63/100/160kVA Transformer by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Cou

Transporting 63/100/160kVA Transformer by Country boat/Vallam beyond 6km.

Transporting 250/315/500kVA Transformer by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Co

Transporting 250/315/500kVA Transformer by Country boat/Vallam beyond 6km.

Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers ar
numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and clea
of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2
width. including cost of paint.
Preparing index register (book & soft copy) showing name of Transformer, post numbers, consumer numbers (in separate column of excel she

Object Marking (traffic signal painting) in one LT, HT, HT/LT pole for a height of 1.5m from ground level using approved quality primer one
black and fluorescent white paint in alternate rings of 25cm width including cost of paints.

Supplying and fixing permanently, screen printed consumer premises identification number card of size 10x7cm using screw/adhesives. (Con.N
1.5cm width & 0.5cm thickness, Name of section of character 1cm height, 1cm width & 0.25cm thickness).

Painting 'A' pole structure with one coat Synchromate primer and two coat grey enamel paint/aluminium paint including cost of paint.

Numbering of Tree (marking for cutting the tree) using yellow enamel paint as specified including cost of paint.

Scrapping and cleaning of old paint,rust,oil etc. over the old 25 transformer installed at site (DP or plint) and applying one or more coat of syn
coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc

Scrapping and cleaning of old paint,rust,oil etc. over the old 50/63 kVA transformer installed at site (DP or plint) and applying one or more co
(over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, convey

Scrapping and cleaning of old paint,rust,oil etc. over the old 100 kVA transformer installed at site (DP or plint) and applying one or more coat
(over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, convey

Scrapping and cleaning of old paint,rust,oil etc. over the old 160 kVA transformer installed at site (DP or plint) and applying one or more coat
(over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, convey

Scrapping and cleaning of old paint,rust,oil etc. over the old 250 kVA transformer installed at site (plinth) and applying one or more coat of sy
coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc

Scrapping and cleaning of old paint,rust,oil etc. over the old 500 kVA transformer installed at site (plinth) and applying one or more coat of sy
coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc

Loading HT TW/RSJ/Rail pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation).

Transporting one HT TW/RSJ/Rail pole by Hand cart - normally limited to 4km (excluding loading and unloading)
Transporting one HT TW/RSJ/Rail pole by Head load - for an average distance of one km where transportation by hand cart is not possible. (n

Fitting and erecting one HT TW Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil, drawing suffici
leads to the ground for earthing (excluding provision of earthing).
Fitting and erecting one HT RSJ Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil, drawing suffic
leads to the ground for earthing (excluding provision of earthing).
Fitting and erecting one HT Rail Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil, drawing suffic
leads to the ground for earthing (excluding provision of earthing).
Fitting and erecting one HT Double Pole Structure using TW pole in position including fitting 2 No. channel cross arm, digging and back fillin
sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

Fitting and erecting one HT Double Pole Structure using RSJ pole in position including fitting 2 No. channel cross arm, digging and back fillin
sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

Fitting and erecting one HT Double Pole Structure using Rail pole in position including fitting 2 No. channel cross arm, digging and back fillin
sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

Fitting and providing one Strut using HT TW pole, including digging and back filling pit in ordinary soil.

Fitting and providing one Strut using HT RSJ pole, including digging and back filling pit in ordinary soil.

Fitting and providing one Strut using HT Rail pole, including digging and back filling pit in ordinary soil.

Fitting and providing one HT Fly stay for 11kV pole using HT TW pole, including digging and back filling pits in ordinary soil, drawing suffici
to the ground for earthing (excluding provision of earthing).
Fitting and providing one HT Fly stay for 11kV pole using HT RSJ pole, including digging and back filling pits in ordinary soil, drawing suffici
to the ground for earthing (excluding provision of earthing).
Fitting and providing one HT Fly stay for 11kV pole using HT Rail pole, including digging and back filling pits in ordinary soil, drawing suffic
to the ground for earthing (excluding provision of earthing).
Insertion of one HT TW pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc.,
GI earth leads to the ground for earthing (excluding provision of earthing).
Insertion of one HT RSJ pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc.,
GI earth leads to the ground for earthing (excluding provision of earthing).
Insertion of one HT Rail pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc.,
GI earth leads to the ground for earthing (excluding provision of earthing).
Loading LT TW/RSJ/Rail pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation).

Transporting one LT TW/RSJ/Rail pole by Hand cart - normally limited to 4km (excluding loading and unloading).

Transporting one LT TW/RSJ/Rail pole by Head load - for an average distance of one km where transportation by hand cart is not possible. (n

Erecting one LT TW Pole in position including digging & back filling pit in ordinary soil.
Erecting one LT RSJ Pole in position including digging & back filling pit in ordinary soil.

Erecting one LT Rail Pole in position including digging & back filling pit in ordinary soil.

Providing Strut using LT TW pole including digging and back filling pit in ordinary soil.
Providing Strut using LT RSJ pole including digging and back filling pit in ordinary soil.

Providing Strut using LT Rail pole including digging and back filling pit in ordinary soil.

Providing Fly stay for LT pole using LT TW pole including digging and back filling pit in ordinary soil.

Providing Fly stay for LT pole using LT RSJ pole including digging and back filling pit in ordinary soil.

Providing Fly stay for LT pole using LT Rail pole including digging and back filling pit in ordinary soil.

Constructing one span single phase OH line for giving service connection using TW pole with one stay including digging & back filling 2 pits i
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span single phase OH line for giving service connection using RSJ pole with one stay including digging & back filling 2 pits i
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span single phase OH line for giving service connection using Rail pole with one stay including digging & back filling 2 pits i
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span single phase OH line for giving service connection using TW pole with TW strut (without stay) including digging & bac
soil, cutting and removing tree branches, excluding WP portion and transportation of poles.
Constructing one span single phase OH line for giving service connection using RSJ pole with RSJ strut (without stay) including digging & bac
soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

Constructing one span single phase OH line for giving service connection using Rail pole with Rail strut (without stay) including digging & bac
soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

Constructing one span single phase OH line for giving service connection using TW pole without stay/strut including digging & back filling pit
removing tree branches, excluding WP portion and transportation of poles.

Constructing one span single phase OH line for giving service connection using RSJ pole without stay/strut including digging & back filling pit
removing tree branches, excluding WP portion and transportation of poles.

Constructing one span single phase OH line for giving service connection using Rail pole without stay/strut including digging & back filling pit
removing tree branches, excluding WP portion and transportation of poles.

Constructing one span three phase OH line for giving service connection using TW pole with one stay including digging & back filling 2 pits
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span three phase OH line for giving service connection using RSJ pole with one stay including digging & back filling 2 pits
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span three phase OH line for giving service connection using Rail pole with one stay including digging & back filling 2 pits
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span three phase OH line for giving service connection using TW pole with TW strut (without stay) including digging & bac
soil, cutting and removing tree branches, excluding WP portion and transportation of poles.
Constructing one span three phase OH line for giving service connection using RSJ pole with RSJ strut (without stay) including digging & ba
soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

Constructing one span three phase OH line for giving service connection using Rail pole with Rail strut (without stay) including digging & ba
soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

Constructing one span three phase OH line for giving service connection using TW pole without stay/strut including digging & back filling pi
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span three phase OH line for giving service connection using RSJ pole without stay/strut including digging & back filling pi
removing tree branches, excluding WP portion and transportation of pole.

Constructing one span three phase OH line for giving service connection using Rail pole without stay/strut including digging & back filling pi
removing tree branches, excluding WP portion and transportation of pole.

Providing WP support with TW pole including digging & back filling pit in ordinary soil. excluding transportation of poles.
Renewal of existing damaged/old 11kV pole (any type) with new TW pole in place including excavation of pole pit, erection of new pole, back
items etc. and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV pole (any type) with new RSJ pole in place including excavation of pole pit, erection of new pole, back
items etc. and conveyance of all materials except pole.
Renewal of existing damaged/old 11kV pole (any type) with new Rail pole in place including excavation of pole pit, erection of new pole, back
items etc. and conveyance of all materials except pole.
Renewal of existing damaged/old 11kV DP (any type) (2 channel cross arm) with new TW DP in place including excavation of pole pit, erecti
and refitting of all items etc. and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV DP (any type) (2 channel cross arm) with new RSJ DP in place including excavation of pole pit, erecti
pit and refitting of all items etc. and conveyance of all materials except poles.

Renewal of existing damaged/old 11kV DP (any type) (2 channel cross arm) with new Rail DP in place including excavation of pole pit, erecti
pit and refitting of all items etc. and conveyance of all materials except poles.

Renewing one damaged Transformer DP (any type) structure with a new TW Transformer DP including excavation, dismantling accessories li
LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including
as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

Renewing one damaged Transformer DP (any type) structure with a new RSJ Transformer DP including excavation, dismantling accessories li
LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including
as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

Renewing one damaged Transformer DP (any type) structure with a new Rail Transformer DP including excavation, dismantling accessories li
LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including
as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

Renewal of any type of existing damaged/old 11kV Strut (any type) with new TW strut in place including excavation & backfilling of pit, cons
refitting of all items and conveyance of all materials except pole.

Renewal of any type of existing damaged/old 11kV Strut (any type) with new RSJ strut in place including excavation & backfilling of pit, cons
refitting of all items and conveyance of all materials except pole.
Renewal of any type of existing damaged/old 11kV Strut (any type) with new Rail strut in place including excavation & backfilling of pit, cons
refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV Fly stay (any type) with new Fly stay including renewal of HT TW pole in place including excavation &
consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV Fly stay (any type) with new Fly stay including renewal of HT RSJ pole in place including excavation &
consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old 11kV Fly stay (any type) with new Fly stay including renewal of HT Rail pole in place including excavation &
consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old LT (single phase line) pole (any type) with new TW pole in place including excavation of pole pit, erection o
and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT (single phase line) pole (any type) with new RSJ pole in place including excavation of pole pit, erection o
and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT (single phase line) pole (any type) with new Rail pole in place including excavation of pole pit, erection o
and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT (three phase line) pole (any type) with new TW pole in place including excavation of pole pit, erection of
refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT (three phase line) pole (any type) with new RSJ pole in place including excavation of pole pit, erection of
refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT (three phase line) pole (any type) with new Rail pole in place including excavation of pole pit, erection of
refitting of all items except street light fitting etc. and conveyance of all materials except pole.

Renewal of existing damaged/old LT Strut of any type with new TW strut in place including excavation of pit, erection of new strut, backfilling
and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old LT Strut of any type with new RSJ strut in place including excavation of pit, erection of new strut, backfilling
and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old LT Strut of any type with new Rail strut in place including excavation of pit, erection of new strut, backfilling
and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including new LT TW pole in place including excavation o
stay, backfilling and dismantling and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including new LT RSJ pole in place including excavation o
stay, backfilling and dismantling and refitting of all items and conveyance of all materials except pole.

Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including new LT Rail pole in place including excavation o
stay, backfilling and dismantling and refitting of all items and conveyance of all materials except pole.

Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil includi
ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding layi

Additional rate for excavation of cable trench of appropriate size (normally 1.2m deep and 0.35m /0.5m wide for single/double run) in excep
in ordinary rock).
* (As per the PWD Standard Data book ,'ordinary rock' is defined as any material which can be quarried or split with crowbars or wedges).
Laying HT XLPE UG cable of sizes upto and including 3x185 sq mm including conveying cable from Sub Regional Store/stacking place to wo
using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags
space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of
of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling.

Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional
site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, p
5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m interv
materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling.

Doing straight joint on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplied departmentally as
providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc
departmental officers at site.
Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit su
specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and
direction of departmental officers at site.
Doing one cable end termination on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplied depart
fencing, caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental o

Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable
departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the dir
officers.
Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, te
etc.including cost of extra materials if needed and giving necessary jumper connections.

Excavation of cable trench (soil surface) and digging out the faulty portion of the cable from the trench for redoing straight through joint, re-lay
refilling and consolidating the trench as per standard specification. (excluding joining).

Additional rate for excavating trench on tarred/concrete surface of specified size.

Dismantling the faulty cable end from the structure/pole after disconnecting 11kV jumper connections and mounting the same after redoing E
jumper connections. (excluding end termination).

Constructing Transformer plinth of size 1.5x1.5x1.5m on 1.8x1.8x0.75m basement inclusive of cost of all materials. [Excavation 1.8x1.8x0.75
CM(1:6) 1.8x1.8x0.75m + 1.5x1.5x1.5m, concrete (1:2:4, 20mm) 1.5x1.5x0.10 m, plaster CM (1:3) 12mm, 1.5x1.5m, Pointing CM (1:3) 1.5

Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm)
(1:3) 12mm 0.45x0.45mx5sides.
Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 run
horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger bo
embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat o
incl cost of transportation
Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6
constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreadin

Providing Transformer fencing using steel work using 40 mm Dia GI pipes for verticals & outer frame of gate, providing gate with locking arr
horizondal brasings using 40 x 6 mm MS flat & grills with MS rods 8 mm Dia @ 10cm c/c for verticals for the gate, providing danger board &
position, concreting the base with 1:2:4 CC, applying one coat of zinc chromate primer and two coats of aluminium paint for fencing post and
fencing with 4 mm GI chain link fixed to GI post, as per detailed specifications including all charges.
Brick work in cement mortar 1:4 with country burnt bricks for superstructure as per the direction of departmental staff

Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distanc
pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including
charcoal, excluding supply of earth pipe.
Cost of construction of foundation, base plates, fixing anchor bots, loading & unloading, handling, erection, allignment and allied works for the
Aquisition compatible Extensible type Ring Main Units with terminal protector boots & extension modules, actuators for remote operatios, com
& relay contacts for SCADA, giving power & control wiring and connections, providing terminal protector, interconnecting RMU bus bar and
metered LT supply from nearest LT pole, providing 2 nos pipe earthing, cable mounting & terminations, giving connections after ascertaing pr
providing location name & warning boards, burying cables & refilling, conducting all precommissioning tests as required, complete, except cos

RMU Bus Couplers / Add-On units with Load Break switch(s) & Earth switch

RMUs with two nos load break switches & one VCB

Additional rate for RMUs with one additional Load Break switch / VCB

Coupling of Busbars
ND CONDUCTORS
ORMERS AND SPARES

G EQUIPMENTS

C LIGHT FITTINGS
KERALA STATE ELECTRICITY BOARD Ltd
Work Estimate
Name of work : under Ele.section, .

Ele.SubDivision :
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
KERALA STATE ELECTRICITY BOARD Ltd
Office of
The .... .... .... .... .... .... .... .... .... .... .... ....
.... .... .... .... .... .... .... ....

Proceeding of The ...............................................................................


Sub : Estimate sanction - under Ele.section, - reg.

ORDER No. DB / WE / ............ / 20....--.... / dt. ....................

Ref : Letter No. ..................... of ............................

ORDER
Sanction is hereby accorded to the working estimate amounting to Rs................../-
Rupees ....................................................................................... only) towards the labour and transporting portion
of the subject work.Funds to the extent may be met from :-

1- Current years budget provision of Electrical Division, under O&M/ Capital Service and charged to A/c
No. ........................

2- Amount remitted by the party/ local body/ department/ others, towards the execution of subject work and
charged to A/c No. .............................

.......................................

Acc:-Copy of the sanctioned estimate.

Copy submitted to:-


1-

2-

Copy to:-
1- Assistant Engineer, Ele.Section,

2-
KERALA STATE ELECTRICITY BOARD Ltd
Office of
The .... .... .... .... .... .... .... .... .... .... .... ....
.... .... .... .... .... .... ....

QUOTATION / TENDER NOTICE

No. DB / Quotation / ............ / 20....-.... / dt. ....................

Sealed quotations by REGISTERED POST / COURIER are invited for


........... ................ .......... ............ ............. ............. ............ .............. ............ ............ (Name of work) under
Ele.section, as per conditions stated below.
Estimate Time limit for
Quotation EMD Cost of
Name of work Amount completing
No.& Date (Rs) Tender form
(Rs) the work

ORDER
1- Quotations/Tender forms will be issuied at Office of the ...... ........... ...... ..... ..... ...... .... .... ..... ..... (Name of
office) till ..AM/PM on ...........(Date).
2- Quotation/Tender should be addressed to the undersigned and should be received at Office of the
...... ........... ...... ..... ..... ...... .... .... ..... ..... (Name of office) on or before ..AM/PM on ...........(Date).

3- Quotation/Tender shall be opened at ........AM/PM on the same day or any day fixed by the undersigned.
4- Quotation/Tender from Contractors/suppliers/Agencies within the state of Kerala will be preferred.

5- If ordered, an agreement in stamp paper worth Rs.200/- will have to be executed if necessary after furnishing the
required security deposit.

6- All other conditions prevalent in the KSE Board Ltd for the contract work shall be binding for the contractors as per
this quotation.

7- Rate quoted should be based on the total estimate amount.


8- This quotation/Tender will be firm for three months from the date of receipt.
9- The undersigned reserves the right to accept or reject any Quotation without assigning any reason there of.
10- Further details can be obtained from the .....................................office during working hours.

11- The Key and description in the Work Estimate/ Schedule of work represents the detail description of work given in the
Labour Data approved vide. BO (FTD) No.2495/2016 (No D(D&S)/D6- AE 1/ Proposal 02/ 2015) Dtd Tvpm,
25.08.2016

.......................................
Acc:-Copy of the sanctioned estimate.
KERALA STATE ELECTRICITY BOARD Ltd
QUOTATION / TENDER
Name of work : under Ele.section, .

Quotation/Tender No:/ Dt. 30-12-1899 Ele.SubDivision :


SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
KERALA STATE ELECTRICITY BOARD Ltd
Office of
DB/........ / ........./......... / dt. ................. The ......... ....... ........ ........ ........ ......... .........
............ ......... ......
To
................................................................

Sub : under Ele.section, - Orders issued - reg.

Work Order No. DB / WO / .......... / 20...--... / dt. .......................


Ref :
1 - Work Estimate sanction No. DB / WE / ....... / ......... / dt. ..................
of ...................... ..... ........... ..............................
2 - Your Quotation / Tender No. ..................... Dated. ...............................

ORDER
Your offer to carryout the subject work at the quoted rate of at 'Estimate Rate' is hereby accepted and the work is
awarded in your favour subject to the following conditions.
1- You are requested to execute the contract agreement in non judicial stamp paper worth Rs.200/- for the full fillment of the
contract within .................. days.

2- You are requested to remit an amount of Rs...................../- either by DD/Cash in this office towards the security deposit .The
EMD remitted by you for this work will be released for the part of security deposit.

3- The work may be started in consultation with the undersigned and should be completed within ............. days.
4- The safety of the workmen engaged by You is at your risk and cost. No compensation will be paid by the KSE Board Ltd
5- You are responsible for the safe custody of the KSE Board Ltd's materials/equipments issued to you for this work till the
completion of work.

6- All terms and conditions in force pertaining to contract work in KSE Board Ltd will be applicable to this work also.

7- The Key and description in the Work Estimate/ Schedule of work represents the detail description of work given in the Labour
Data approved vide. BO (FTD) No.2495/2016 (No D(D&S)/D6- AE 1/ Proposal 02/ 2015) Dtd Tvpm, 25.08.2016

Copy submitted to:- .............................................


1-

2-

Copy to:-
1-

2-
KERALA STATE ELECTRICITY BOARD Ltd
Schedule of Work (WO No: /)
Name of work : under Ele.section, .

Ele.SubDivision :
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount

0
AGREEMENT
No. ............/ 20....--..../ Dated. .................

ARTCLES OF AGREEMENT made this ................ day of ........................ between the ............................. acting for and on
behalf of the KERALA STATE ELECTRICITY BOARD Ltd (hereinafter reffered to as the 'KSE Board Ltd' which expression
shall,where the context so admits or implies be deemed to include their successors in office and assignees) of the one part AND

Sri/Smt ....................................... (hereinafter called the 'contractor') which expression shall where the context so admits or implies
be deemed to include his/her successors interest,legal representatives and assignees as well) of the other part.

WHERE AS the contractor has agreed with the KSE Board Ltd for the performance of the work set forth in the quotation/ tender
and accompaniments here unto annexed and marked as 'Schedule A' up on the conditions herein mentioned.

AND WHERE AS the performance of the said work is an act in which the public are interested and is entered into under the
orders of the KSE Board Ltd.
AND WHERE AS the Contractor has deposited in cash/DD amounting to Rs....................
(Rupees.................... .......................... .......................... .....................) at this office vide Receipt No............... Dated.................... as
Security Deposit for the due performance of this contract.

NOW THESE PRESENTS WITNESS that in consideration of the payment to be made by the KSE Board Ltd herein after
mentioned, the contractor will duly perform the said works in the said schedule set forth and will complete the same

in accordance with plans and specifications thereon to annexed on or before the day (date) ..................
and will observe fulfill and keep all the conditions therein mentioned ( which shall be deemed and taken to be a part of this contract as
if the same had been fully set out therein ) and the KSE Board Ltd both hereby agree that if the contractor shall duly perform the said
work in the manner aforesaid and observe and keep the said terms and conditions,

the KSE Board Ltd will pay or cause to be paid to the contractor at the times and in the manner in the said conditions set forth the sum
of Rs. ............/- (Rupees....................................... ................................................only) as payment for the said work.

It is also agree that the KSE Board Ltd will in no way be liable to pay compensation as per workmen's compensation act, to the
workmen engaged by the contractor should they met with accidents, if any during the execution of the contracts work.

The Key and description in the Work Estimate/ Schedule of work represents the detail description of work given in the Labour Data
approved vide. BO (FTD) No.2495/2016 (No D(D&S)/D6- AE 1/ Proposal 02/ 2015) Dtd Tvpm, 25.08.2016

Signature of (1)
.................................................

(On behalf of the KSE Board Ltd.)

Signature of (2)
.................................................

(Contractor )

Signature of witness to the (1) .........................................................


.........................................................

Signature of witness to the (2) .........................................................


.........................................................
KERALA STATE ELECTRICITY BOARD Ltd
Schedule to the Agreement. (No. /)
Name of work : under Ele.section, .

Ele.SubDivision :
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
SNo Key Particulars Unit Rate Add Qty Amount
-3-

Estimate for Additional/ Extra work


Name of Work : under Ele.Section, .

SNo Key Particulars Unit Rate Add Qty Amount

Estimate sanctioned for Rs. ................/- vide order No.


WE/ ............/ ............/ dt. ............
Esti
mat Asst.Engineer
Supe Ele.Section,
for
ple
Ad
me ..................................................
diti
ntar
onal
y
Sch/
Ext
edu
ra
le
wor
to
k
the
Agr
eem
ent
for
Ad
diti
onal
/
Ext
ra
-1-

KERALA STATE ELECTRICITY BOARD Ltd

Ele. Cicle / Ele. Division : Bill Register No


Ele. Sub Division :
Electrical Section :
1191 ME PETTY CONTRACT Bill No : 2016 AD
Debit to ( Name of Work ) Sanctioned Estimate No. Budget Provision

Work Order No:

Sub-head: .....................
Agreement No:
Name of Contractor :
Amount of contract :
Official date of commencement of work :
Date of completion as per Agreement :
Actual date of commencement of work :
Entered in Actual date of completion of work :
(1).Detailed work ledger or work abstract Adjusted receipts and issues as per part IV(Materials account) of this bill in the
MAS.Account for the month of
(2).Contractor's ledger for the month of
...
.
ACCOUNTANT ACCOUNTANT
Cash book Voucher Forwarded to CAO as enclosure to the .
Division Office No Signed
No:..
DIVISIONAL ACCOUNTANT DIVISIONAL OFFICER
NOTES
[ 1 ].This contract certificate will be in four parts. [ 4 ]. In the case of payees who can neither read nor write, their
Part I comprising the body of the bill will show the quantities mark or seal should be attested by two competent witnesses in
and value of work done: Part II embodies certificates and whose presence the nature of payments should be fully explained.
signatures of various officers

responsible for measuring,checking and payment.


Part III comprises the detailed memorandum of payment. Part
IV gives the account of materials received and issued for the [ 5 ]. The account for which the materials are purchased,
work billed for. whether for stock or for work must always be stated and name of
the officer who took over the materials must be entered, unless he
is the officer who signs the certificate
[ 2 ].This form is not to be used for payments on account or
[ 6 ]. The Officer measuring and preparing the bill should be
for settlement of running account or for settlement of running
careful to note in the columns of "remarks" in the body of the bill
accounts. Works should be
the quantity of material issued to
promtply measured up and paid for, running accounts being the contractor the value of which is to be deducted at the time of
avoided as much as possible. payment

[ 3 ].When the payee signs in Vernacular, the amount [ 7 ]. If the officer who prepares the bill has authority to make
acknowledged should be noted in Vernacular as well as in payment only one signature at the foot of the bill is necessary
English.
[ 8 ]. A receipt stamp is required for every payment exceeding
Rs.5000/-
-2-
PART - I ( Description Quantities and value of work done or supplies made )
Ref. to
Estimate As per Agreement M Book Value at
Quantities
Agreement rate
Item
Number/ Number/
Rate Per Description of work done or supplies made Book Page
of work
of work done
Remarks
Key Quantity/ Quantity/ done
No Rs Ps Unit No No Rs Ps
Weight Weight

1 2 3 4 5 6 7 8 9 10 11 12

Carried over Rs: 0.00


-3-

1 2 3 4 5 6 7 8 9 B/F Rs: 0.00 12

Carried over Rs: 0.00


- 4 (a)-
Ref. to
Estimate As per Agreement M Book Value at
Quantities Agreement
Item
Number/ Number/
Rate Per Description of work done or supplies made Book Page of work rate of work Remarks
Key Quantity/ Quantity/ done done
No
Weight Weight
Rs Ps Unit No No
Rs Ps
1 2 3 4 5 6 7 8 9 B/F 0.00 12

Carried over Rs: 0.00


- 4 (b) -

1 2 3 4 5 6 7 8 9 B/F Rs. 0.00 12

Carried over Rs: 0.00


- 4 (c)-

Ref. to
Estimate As per Agreement M Book Value at
Quantities Agreement
Number/ Number/ Description of work done or supplies made of work rate of work Remarks
Item
Key Quantity/ Quantity/
Rate Per Book Page done done
No
Weight Weight
Rs Ps Unit No No Rs Ps

1 2 3 4 5 6 7 8 9 B/F 0.00 12

Total Value of work done : 0.00


Amount to be Added/Subtracted as per agreement : 0.00
Total Value of work done as per agreement : 0.00
-5-

Extra Items of Work


1 2 3 4 5 6 7 8 9 10 11 12

Total Value of extra items of work done : 0.00


Added / Subtracted as per Supplementary Schedule : 0.00
0.00
Grand Total of the value of work done : ( 0 + 0) : Rs. 0.00
Rs.................../- (Rupees ........................................................................................)
-6-

* Submitted as Petty Contractor Bill No. .............. to the section officer for payment. The accounts of
receipts and issues of the items of materials for the work as per this bill are embodied in the statement given in part IV of this
bill.

(Dated signature or left hand thumb impression of contractor)


PART - II ( CERTIFICATES AND SIGNATURES )
( A ) Bill Preparation Section

(A).Certified that the measurements were made by


Checked calculations and verified quantities, rates, receipts ......................... on ... and are
and issues against agreement and sanctioned provisions recorded on pages - .... to .....- of Measurement
Book No.- /......
and that work has been executed satisfactorily
and that bill as claimed above represents a correct
Asst. Accountant account of the contractor's claims and liabilities
. Senior Accountant
Officer Dated signature ..
( Bill preparation section ) preparing the bill
Rank

(B) Remarks by Check - Measuring officers

Here enter the nature of the check measurements taken or other examination of work and the result of such examination.

Sub. Division officer Division Officer


C .Audit Section
Checked again the calculation and verified the rates against the contract schedule, quantities against Estimate provisions and
receipts and issues against sanctioned date

Vide I Sub Division Audit Slip No


attached Vide II Division Audit Slip No attached
Accountant .Asst. Accountant
...Head Clerk ...Senior Accountant

* This column need be filled in only when the contractor submits the bill
-7-

Figures for PART - III MEMORANDUM OF PAYMENTS


Rs Ps
works abstract 1.Total value of work done as per part I column 9
Rs. Ps
Details of Payments made

By recovery amounts creditable to the work Rs Ps

i ) Value of departmental materials or stock supplied


and used up as per Col.4 of Part IV (materials
accounts) of this bill.
(a)
ii ) Work done departmentally on account of the
Contractor as per C . B . V . No.

By recovery of amounts creditable to other works


head of accounts
(b)
(i) Hire on account of special tools and plant(b)
issued to the contractor(b)
(ii)
( c ) By cheque
TOTAL 2 ( b ) and ( c )
The Total value of work is admitted and passed for Rupees (in words)..
..

as detailed in item ( 2 ) of the memorandum of payment

Officer authorising
Certified that the bill as passed Dated signature
payment
The payee's acknowledgment should be for the gross

above has been ledgered


Rank
amount as per item 2 ie ( a + b + c )

Senior Divisional Accountant


Pay in cash. pay in cheque.

Paid in cash paid in cheque


Paid by me ....
Received Rupees (in words).
.
as per above memorandum in settlement of all my claims and liabilities.
( amount in vernacular )
Left hand thumb impression
Dated of ..

Rs (in figures) Stamp


Left hand thumb impression
Witness
Full Signature of Contractor.
-8-

PART - IV Materials Account. MCS No:


Receipt as per Issue as
Sl No Description Balance in hand Remarks
this bill per this bill
1 2 3 4 5 6
TAKEN BACK

Verified Officer Signature of Contractor


Accountant measuring Signature (at the time of payment)
Audit Section the work and Rank ..
preparing the Bill Date :..
Name of work :

Pole wise/ Consumer wise


schedule

Consumer / Pole No

0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
KERALA STATE ELECTRICITY BOARD Ltd
Name of work : under Ele.section, .

Location wise Details of Work Total Material Cost : 0.00


16% Centage Charge : 0.00
Ele.SubDivision : Total Labour Charge : 0.00 0.00
10% Supervision Charge : 0.00
Additional Charges (if any) :
Total : Rs. 0.00
Sl Labour
No
Key Qty Km Labour Particulars Charge Key Qty Materials Material cost Location / Collection particulars

1 0 0

0 TOTAL 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
Sl Labour
No
Key Qty Km Labour Particulars Charge
Key Qty Materials Material cost Location / Collection particulars

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
Sl Labour
No
Key Qty Km Labour Particulars Charge
Key Qty Materials Material cost Location / Collection particulars

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
Sl Labour
No
Key Qty Km Labour Particulars Charge
Key Qty Materials Material cost Location / Collection particulars

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
Sl Labour
No
Key Qty Km Labour Particulars Charge
Key Qty Materials Material cost Location / Collection particulars

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
Sl Labour
No
Key Qty Km Labour Particulars Charge
Key Qty Materials Material cost Location / Collection particulars

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0
Sl Labour
No
Key Qty Km Labour Particulars Charge
Key Qty Materials Material cost Location / Collection particulars

0 0 0

0 0 0

0 0 0

0 0 0
KERALA STATE ELECTRICITY BOARD Ltd

WORK AUTHORISATION ORDER

Order No. :0 Name of Section : 0


Name of Work : 0 Name of Sub Division : 0

Name of Division : 0

Anticipated Date Commencement of Work : CWIP A/c. Code :

Anticipated Date Completion of Work : Asset A/c. Code :

Anticipated Date Commission of Asset : Asset Cost Group Code :

Cost of Materials Rs.

Expenses on Labour, Transport & Sundries Rs. 0.00


Other Miscellaneous Expenses
1. Rs.

2. Rs.

TOTAL Rs. 0.00


0
0 Ten 0.0

1 One Eleven Ten 0 ( Rupees

2 Two Twelve Twenty 0

3 Three Thirteen Thirty 0

4 Four Fourteen Forty 0

Asst.Exe.Engineer, Asst.Engineer,
5 Five Fifteen Fifty 0

Ele.Sub Division, Ele.Section,


6 Six Sixteen Sixty 0

0 0
7 Seven Seventeen Seventy 0
KERALA STATE ELECTRICITY BOARD Ltd
Office of
DB/........ / ........./......... / dt. ................. The ......... ....... ........ ........ ........ ......... .........
............ ......... ......
To
................................................................

Sub : Granting Time Extension to the work - under Ele.section, - Orders issued - reg.

Time Extension Order No. DB / TE / .......... / 20...--... / dt. ....................


Ref :
1 - Work Order No. DB / WO / .......... / 20...--... / dt. ..............................

2 - Agreement No. ............/ 20....--..../ Dated. .................

3 - Request of contractor and Report of Asst.Engineer, Ele.Section, .................................

ORDER
Cosidering Your request and the recommendation of Assistant Engineer, Ele.Setion, vide ref. above, The
time of completion for the above suject work is extended up to ...................

1 - The reason stated in your request is found genuie.


2 - The time extension is granted with out imposing any penalty.
3 - The work should be completed within the specified period.
4- All terms and conditions in force pertaining to contract work in KSE Board Ltd will be applicable to this work as per the Work
order cited under ref.(1) and Agreement cited under ref.(2) will remain UnChanged.

Copy submitted to:- .............................................


1-

2-

Copy to:-
1-

2-
KERALA STATE ELECTRICITY BOARD Ltd
COMPLETION REPORT CUM CAPITALISATION SHEET
PART - I COMPLETION REPORT
Work of Authorisation No. : Name of ARU : Date of Commencement of Work :
Name of Work Name of Section : Date of Completion of Work :
0 Name of Sub Division : Date of Commission of Work :
Name of Division :
Capital Works in progress No. : Asset Code No. :
1 Cost Group Code No. :
TAKEN BACK OTHER SUNDRY MATERIALS EXPENSES ON LABOUR - TRANSPORT AND SUNDRIES
VALUE AS PER WGL
Materials
Name of

Sl.
Particulars Quantity Amount Date Particulars Amount
No. Materials Labour

Estimated
Quantity

MRCI/
STN/MCS/ RD
No/Date

TOTAL

Net Qty of
i Materials
drawn

ii Actual

Difference
between i & ii
NOTE: Quantity of Materials returned and value there of will be posted as minus entries

Exe.Engineer, Asst.Exe.Engineer, Asst.Engineer, DA/AAO/AO/FO


Ele. Division, Ele.Sub Division, Ele.Section,
0 0 0
KERALA STATE ELECTRICITY BOARD

COMPLETION REPORT CUM CAPITALISATION SHEET


PART - II CAPITALISATION SHEET

Value .
Description of Assets Asset Code No. Cost Capacity Source in the Qty / Number / Jrnl. No
Make / Model / Type Location Remarks
formed Group Code No. case of Transformer Area Date.
Rs. Ps. .

Note: Certified that the CRCS has been scrutinised with regard to issue of materials and details of assets in Part II, Capitalisation Sheet have been posted in the Register of Assets.

Exe.Engineer, Asst.Exe.Engineer, Asst.Engineer, DA/AAO/AO/FO


Ele. Division, Ele.Sub Division, Ele.Section,
0 0 0
ELECTRICITY BOARD Ltd
T CUM CAPITALISATION SHEET
COMPLETION REPORT

EXPENSES ON LABOUR - TRANSPORT AND SUNDRIES


VALUE AS PER WGL

Labour
TE ELECTRICITY BOARD

T CUM CAPITALISATION SHEET


APITALISATION SHEET

Jrnl. No
Date.
M Book Audit Note
A. The Following details are to be recorded in the M.Book and bills.
Name of Section : M Book No.---------------------------
1- Full Name of work as given in the sanctioned Estimate : 0

2- AS No. Amount of AS and : 0


Name of authority who issued the AS

3- TS No. Amount of TS and : 0


Name of authority who issued the TS

4- Working estimate sanction No, amount of working estimate : 0


and name of authority who sanctioned the working estimate

5- Work order No and name of authority who issued work order : 0

6- Number and date of Agreement : 0

7- Name and address of contractor : 0

8- Actual date of commencement of work : 12/30/1899

9- Actual date of completion of work need be filled up only after : 12/30/1899


entire work is completed.

10- Date(s) of measurement : 12/30/1899

11- Bill No : 0

12- Account No. : 0

13- In case of Deposit work/ PPS(KDP)/ MP LAD/ MLA LAD/ :


OYEC/ Other funded work-Details of remittance.

14- In the Certificate, the MCS No. And MASA No. In which the :
materials booked to be mentioned.
B. The following conditions are to be satisfied for passing the bill Put tick mark

1- Whether the work is covered by budget sanction and valid contract agreement. : Yes No NA

2- Whether a deviation statement has been prepared and attached , showing the reason : Yes No NA
for deviation.
3- Whether there is sanction for excess over estimate and proper explanation furnished : Yes No NA
for the deficiency (In case where there is deficiency).
4- Whether measurement has been done as required in para 316 & 317 of K.P.W.A : Yes No NA
code.
5- Whether acceptance of measurement of the contractor has been obtained in : Yes No NA
M.Book and proper Acknowledgement obtained in Part III of the bill.
6- Whether the work has been check measured by the AEE. : Yes No NA

7- Whether NLC of the contractor has been furnished in the M Book and bill. : Yes No NA

8- Whether prescribed certificated have been furnished in the M Book and Bills. : Yes No NA

9- Whether first page of the bill has been properly filled up with required details. : Yes No NA

10- Whether material account have been properly written up in part IV and reconciled : Yes No NA
with MRCI/Debit slips/Devolution Notes etc. and whether copies of MRCI
enclosed for verification.
11- Whether recovery of materials have been effected as per agreement. : Yes No NA

12- Whether penal recovery for materials not returned have been effected from the bill. : Yes No NA

13- Whether income tax at 2% and surcharge at 5% of income tax have been deducted : Yes No NA
from the bill.
14- Whether retention has been recovered as per rule. : Yes No NA

15- Whether Pole/ consumer wise Schedule attached. : Yes No NA

16- Whether CRCS part I and II attached. : Yes No NA

17- Whether material account furnished in the bill/M.Book. : Yes No NA

18- Whether two copies of Estimate sanction (of AS, Working estimate etc.), work : Yes No NA
order, agreement etc attached.
19- Whether corrections in the PC Bill and M Book is properly attested. : Yes No NA

20- Whether security deposit @ 5% of total amount is collected and copy of receipt is : Yes No NA
attached.
21- Whether proper tender procedure is followed. : Yes No NA

22- Whether pre measurement is done for HT/LT touching works. : Yes No NA
KERALA STATE ELECTRICITY BOARD Ltd
Name of work Estimate (Funded by Agency) / Deposit Work Estimate Total Material Cost : 0.00
16% S O C : 0.00
Total Labour Charge : 0.00
Ele.SubDivision : 10% Supervision Charge : 0.00
Ele.Section : Additional Charges (if any) :
Total : Rs. 0.00
Sl
No
Key Materials Unit Rate Qty Material cost Key Labour Particulars Unit Rate Qty Km Labour Charge
1

0 TOTAL

0
Sl
No
Key Materials Unit Rate Qty Material cost Key Labour Particulars Unit Rate Qty Km Labour Charge

0
Sl
No
Key Materials Unit Rate Qty Material cost Key Labour Particulars Unit Rate Qty Km Labour Charge

0
Sl
No
Key Materials Unit Rate Qty Material cost Key Labour Particulars Unit Rate Qty Km Labour Charge

0
Sl
No
Key Materials Unit Rate Qty Material cost Key Labour Particulars Unit Rate Qty Km Labour Charge

Das könnte Ihnen auch gefallen