MEMORIA DE CALCULO

REDE GENERAL DE DESAGE

COTA DE
BUZON DIF. DE DESC ALCANTARILLA COTA DE FONDO
TERRENO LONG PROFUND
COTAS TOTAL
CALLE D Q V S S Rel Y
EXT. EXT.
DEL AL EXT. SUP. EXT. INF.
SUP. INF. m m l/s mm. l/s m/s m/km m/km mm DEL AL

Ca 17 de Junio E1 E1' 120.03 119.50 0.53 55.50 0.11 200 0.11 0.27 16.21 16.22 8 119.23 118.33 0.80 1.17
Ca 17 de Junio E1' 1 119.50 119.68 -0.18 55.00 0.22 200 0.22 0.36 10.00 10.00 11 118.33 117.78 1.17 1.90

Ca Maynas 2A 2 120.00 120.22 -0.22 51.50 0.10 200 0.10 0.3 10.00 10.00 7 118.89 118.38 1.11 1.85
Ca Maynas 2 1 120.22 119.68 0.54 54.00 0.21 200 0.21 0.36 11.11 11.02 10 118.38 117.78 1.85 1.90

Ca 17 de Junio 1 1A 119.68 120.05 -0.37 51.50 0.10 200 0.10 0.31 13.00 12.99 7 118.48 117.81 1.20 2.24
Ca 17 de Junio 1A 7 120.05 119.97 0.08 51.50 0.20 200 0.20 0.36 11.34 11.34 9 117.81 117.23 2.24 2.74

Psje Huascar 2 4 120.22 120.08 0.14 41.00 0.08 200 0.08 0.26 11.50 11.49 7 119.02 118.55 1.20 1.53
Psje Huascar 4 8 120.08 119.18 0.90 57.00 0.19 200 0.19 0.36 11.50 11.49 9 118.55 117.89 1.53 1.29
Ca Jaen 8 7 119.18 119.97 -0.79 58.00 0.30 200 0.40 0.45 11.50 11.50 13 117.89 117.23 1.29 2.74
Ca Jaen 7 6 119.97 120.56 -0.59 54.00 0.61 200 0.48 0.56 18.52 18.46 14 117.23 116.23 2.74 4.33

Ca Maynas 1 E2 119.68 120.00 -0.32 56.00 0.54 200 0.54 0.47 10.00 10.00 16 117.78 117.22 1.90 2.78

Ca Maynas E2' E2A 119.79 120.15 -0.36 49.50 0.10 200 0.10 0.32 15.00 14.99 7 118.59 117.85 1.20 2.30
Ca Maynas E2A E2 120.15 120.00 0.15 48.00 0.19 200 0.19 0.38 13.13 13.08 9 117.85 117.22 2.30 2.78

Psje America E2 E4 120.00 120.05 -0.05 58.50 0.85 200 0.85 0.54 10.00 10.00 20 117.22 116.64 2.78 3.42

Psje Las Leyendas E3 E3A 119.79 120.25 -0.46 48.50 0.10 200 0.10 0.34 18.00 18.00 6 118.59 117.72 1.20 2.53
Psje Las Leyendas E3A E4 120.25 120.05 0.20 48.50 0.20 200 0.20 0.46 22.27 22.31 9 117.72 116.64 2.53 3.42
COTA DE
BUZON DIF. DE DESC ALCANTARILLA COTA DE FONDO
TERRENO LONG PROFUND
COTAS TOTAL
CALLE D Q V S S Rel Y
EXT. EXT.
DEL AL EXT. SUP. EXT. INF.
SUP. INF. m m l/s mm. l/s m/s m/km m/km mm DEL AL

Psje America E4 6 120.05 120.56 -0.51 41.00 1.13 200 1.13 0.58 10.00 10.00 24 116.64 116.23 3.42 4.34

Psje Jaen E2' E3 119.79 119.79 0.00 67.00 0.13 200 0.13 0.3 10.00 10.00 9 118.59 117.92 1.20 1.87
Psje Jaen E3 E5 119.79 120.08 -0.29 39.00 0.21 200 0.21 0.35 10.00 10.00 11 117.92 117.53 1.87 2.55

Ca Jaen E5A E5 119.50 120.08 -0.58 40.00 0.08 200 0.08 0.29 13.95 19.25 6 118.30 117.53 1.20 2.55

Ca Jaen E5 E6 120.08 120.22 -0.14 47.00 0.38 200 0.38 0.5 16.00 16.00 12 117.53 116.78 2.55 3.44
Ca Jaen E6 6 120.22 120.56 -0.34 49.50 0.48 200 0.48 0.45 15.35 15.35 15 116.99 116.23 3.23 4.33

Psje America 6 13 120.56 119.95 0.61 52.50 2.32 200 2.32 0.66 8.00 8.00 34 116.23 115.81 4.33 4.14
Psje America 13 13A 119.95 119.75 0.20 7.30 3.39 200 3.39 1.02 10.00 9.59 33 115.81 115.74 4.14 4.01

Psje Miraflores E6 12 120.22 120.36 -0.14 53.00 0.10 200 0.10 0.44 35.75 35.75 5 119.02 117.13 1.20 3.24

Psje Los Olivos 21 12 120.22 120.36 -0.14 80.00 0.38 200 0.38 0.57 26.69 23.69 11 119.02 117.13 1.20 3.24

Ca C. de Araujo E 18 19 119.61 119.28 0.33 76.00 0.38 200 0.38 0.42 10.00 10.00 13 118.41 117.65 1.20 1.63
Psje Miraflores 19 12 119.28 120.36 -1.08 52.50 0.48 200 0.48 0.45 10.00 10.00 15 117.65 117.13 1.63 3.24
Psje Los Olivos 12 13 120.36 119.95 0.41 50.00 1.06 200 1.06 0.73 20.18 26.30 18 117.13 115.81 3.24 4.14

Ca C. de Arujo E 19 20 119.28 119.20 0.08 49.50 0.10 200 0.10 0.36 10.00 10.00 6 118.08 117.59 1.20 1.62
Psaje America 20 14 119.20 119.20 0.00 21.00 0.14 200 0.14 0.46 10.24 10.24 6 117.59 117.37 1.62 1.83
Psaje America 14 13A 119.20 119.75 -0.55 18.10 1.94 200 1.94 0.64 8.00 8.01 30 115.29 115.14 3.91 4.61

Ca Maynas 2A 3 120.00 118.96 1.04 51.00 0.10 200 0.10 0.36 20.39 20.39 6 119.20 118.16 0.80 0.80
Ca 15 de Junio 3 5 118.96 119.20 -0.24 39.00 0.38 200 0.38 0.42 10.00 13.00 14 118.16 117.77 0.80 1.43
Psje Trujillo 4 4A 120.08 119.50 0.58 47.00 0.09 200 0.09 0.25 10.00 10.00 7 118.88 118.41 1.20 1.09
COTA DE
BUZON DIF. DE DESC ALCANTARILLA COTA DE FONDO
TERRENO LONG PROFUND
COTAS TOTAL
CALLE D Q V S S Rel Y
EXT. EXT.
DEL AL EXT. SUP. EXT. INF.
SUP. INF. m m l/s mm. l/s m/s m/km m/km mm DEL AL

Psje Trujillo 4A 5 119.50 119.20 0.30 47.00 0.18 200 0.18 0.38 13.61 13.62 9 118.41 117.77 1.09 1.43
Ca 15 de Junio 5 9 119.20 119.39 -0.19 39.00 0.64 200 0.64 0.46 11.79 11.79 18 117.77 117.31 1.43 2.08
Psje Hipolito Unanue 11 11A 119.20 119.20 0.00 54.50 0.11 200 0.11 0.27 10.00 10.00 8 118.40 117.86 0.80 1.35
Psje Hipolito Unanue 11A 9 119.20 119.39 -0.19 54.50 0.22 200 0.22 0.33 10.00 10.00 11 117.86 117.31 1.35 2.08
Ca 15 de Junio 9 10 119.39 119.20 0.19 15.50 0.89 200 0.89 0.54 10.00 10.01 20 117.31 117.16 2.08 2.05
Ca Jaen 8 10A 119.18 119.20 -0.02 46.50 0.09 200 0.09 0.28 11.00 10.99 11 118.38 117.87 0.80 1.33
Ca Jaen 10A 10 119.20 119.20 0.00 36.00 0.16 200 0.16 0.35 19.86 19.83 8 117.87 117.16 1.33 2.05
Ca 15 de Junio 10 16 119.20 119.20 0.00 65.00 1.18 200 1.18 0.59 10.00 10.00 23 117.16 116.51 2.05 2.70

Psje Huascar 8 15 119.18 119.20 -0.02 64.00 0.13 200 0.13 0.46 10.00 10.00 6 118.38 117.74 0.80 1.46

Ca C. de Raujo 17 16A 119.20 119.20 0.00 55.50 0.11 200 0.11 0.29 10.00 10.00 7 118.00 117.45 1.20 1.76
Ca C. de Raujo 16A 16 119.20 119.20 0.00 55.50 0.22 200 0.22 0.36 10.00 10.00 10 117.45 116.89 1.76 2.31
Ca C. de Raujo 16 15 119.20 119.20 0.00 70.00 1.54 200 1.54 0.64 10.00 10.00 27 116.89 116.19 2.31 3.01
Ca C. de Raujo 15 14A 119.20 119.20 0.00 56.50 1.65 200 1.65 0.6 8.00 8.00 28 116.19 115.74 3.01 3.46
Ca C. de Raujo 14A 14 119.20 119.20 0.00 56.50 1.76 200 1.76 0.62 8.00 8.00 29 115.74 115.29 3.46 3.91

Parque 13A CB 119.75 120.00 -0.25 19.50 5.32 200 5.32 0.67 4.00 4.15 60 115.14 115.06 4.61 4.94
MEMORIA DE CALCULO

REDE GENERAL DE DESAGE

COTA DE
BUZON COTA DE FONDO
TERRENO LONG PROFUND
CALLE
EXT. EXT.
DEL AL EXT. SUP. EXT. INF.
SUP. INF. m DEL AL 1.5 2
Ca 17 de Junio E1 E1' 120.03 119.50 55.50 119.23 118.33 0.80 1.17 Existente 55.5
Ca 17 de Junio E1' 1 119.50 119.68 55.00 118.33 117.78 1.17 1.90 Existente 0 55

Ca Maynas 2A 2 120.00 120.22 51.50 118.89 118.38 1.11 1.85


Ca Maynas 2 1 120.22 119.68 54.00 118.38 117.78 1.85 1.90

Ca 17 de Junio 1 1A 119.68 120.05 51.50 118.48 117.81 1.20 2.24


Ca 17 de Junio 1A 7 120.05 119.97 51.50 117.81 117.23 2.24 2.74

Psje Huascar 2 4 120.22 120.08 41.00 119.02 118.55 1.20 1.53


Psje Huascar 4 8 120.08 119.18 57.00 118.55 117.89 1.53 1.29
Ca Jaen 8 7 119.18 119.97 58.00 117.89 117.23 1.29 2.74
Ca Jaen 7 6 119.97 120.56 54.00 117.23 116.23 2.74 4.33

Ca Maynas 1 E2 119.68 120.00 56.00 117.78 117.22 1.90 2.78 Existente 0

Ca Maynas E2' E2A 119.79 120.15 49.50 118.59 117.85 1.20 2.30 Existente 0
Ca Maynas E2A E2 120.15 120.00 48.00 117.85 117.22 2.30 2.78 Existente 0

Psje America E2 E4 120.00 120.05 58.50 117.22 116.64 2.78 3.42 Existente 0

Psje Las Leyendas E3 E3A 119.79 120.25 48.50 118.59 117.72 1.20 2.53 Existente 0
Psje Las Leyendas E3A E4 120.25 120.05 48.50 117.72 116.64 2.53 3.42 Existente 0

Psje America E4 6 120.05 120.56 41.00 116.64 116.23 3.42 4.34 Existente 0

Psje Jaen E2' E3 119.79 119.79 67.00 118.59 117.92 1.20 1.87 Existente 0 67
Psje Jaen E3 E5 119.79 120.08 39.00 117.92 117.53 1.87 2.55 Existente 0

Ca Jaen E5A E5 119.50 120.08 40.00 118.30 117.53 1.20 2.55 Existente 0

Ca Jaen E5 E6 120.08 120.22 47.00 117.53 116.78 2.55 3.44 Existente 0


Ca Jaen E6 6 120.22 120.56 49.50 116.99 116.23 3.23 4.33 Existente 0

Psje America 6 13 120.56 119.95 52.50 116.23 115.81 4.33 4.14 Existente 0
Psje America 13 13A 119.95 119.75 7.30 115.81 115.74 4.14 4.01

Psje Miraflores E6 12 120.22 120.36 53.00 119.02 117.13 1.20 3.24 Existente 0

Psje Los Olivos 21 12 120.22 120.36 80.00 119.02 117.13 1.20 3.24

Ca C. de Araujo E 18 19 119.61 119.28 76.00 118.41 117.65 1.20 1.63


Psje Miraflores 19 12 119.28 120.36 52.50 117.65 117.13 1.63 3.24
Psje Los Olivos 12 13 120.36 119.95 50.00 117.13 115.81 3.24 4.14

Ca C. de Arujo E 19 20 119.28 119.20 49.50 118.08 117.59 1.20 1.62


Psaje America 20 14 119.20 119.20 21.00 117.59 117.37 1.62 1.83
Psaje America 14 13A 119.20 119.75 18.10 115.29 115.14 3.91 4.61

Ca Maynas 2A 3 120.00 118.96 51.00 119.20 118.16 0.80 0.80


Ca 15 de Junio 3 5 118.96 119.20 39.00 118.16 117.77 0.80 1.43
Psje Trujillo 4 4A 120.08 119.50 47.00 118.88 118.41 1.20 1.09
Psje Trujillo 4A 5 119.50 119.20 47.00 118.41 117.77 1.09 1.43
Ca 15 de Junio 5 9 119.20 119.39 39.00 117.77 117.31 1.43 2.08
Psje Hipolito Unanue 11 11A 119.20 119.20 54.50 118.40 117.86 0.80 1.35
Psje Hipolito Unanue 11A 9 119.20 119.39 54.50 117.86 117.31 1.35 2.08
Ca 15 de Junio 9 10 119.39 119.20 15.50 117.31 117.16 2.08 2.05
Ca Jaen 8 10A 119.18 119.20 46.50 118.38 117.87 0.80 1.33
Ca Jaen 10A 10 119.20 119.20 36.00 117.87 117.16 1.33 2.05
Ca 15 de Junio 10 16 119.20 119.20 65.00 117.16 116.51 2.05 2.70

Psje Huascar 8 15 119.18 119.20 64.00 118.38 117.74 0.80 1.46

Ca C. de Raujo 17 16A 119.20 119.20 55.50 118.00 117.45 1.20 1.76


Ca C. de Raujo 16A 16 119.20 119.20 55.50 117.45 116.89 1.76 2.31
Ca C. de Raujo 16 15 119.20 119.20 70.00 116.89 116.19 2.31 3.01
Ca C. de Raujo 15 14A 119.20 119.20 56.50 116.19 115.74 3.01 3.46
Ca C. de Raujo 14A 14 119.20 119.20 56.50 115.74 115.29 3.46 3.91

Parque 13A CB 119.75 120.00 19.50 115.14 115.06 4.61 4.94

55.5 122
2453.90

CALCULO DEL CUAUDAL UNITARIO

Longitud total de la red 2434.40


Caudal total 4.80
Caudal unitario 0.20

INCLUYE TRAMO FINAL 2453.90


2.5 3 3.5 4.5

56

49.5
48

58.50

48.5
48.50

41.00

39.00

40

47.00
49.50

52.50

53.00
49.5 231.5 207 143
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 01
1 B1 B2 1379.42 1382.63 3.21 47.34 6.78 23.90 1378.22 1381.43 1.2 1.2 200 23.90 0.0678 2.82 0.063
2 B2 B3 1382.63 1389.45 6.82 81.58 8.36 23.90 1381.43 1387.05 1.2 2.4 200 23.90 0.0689 2.83 0.063
3 B3 B4 1389.45 1397.11 7.66 61.08 12.54 23.90 1387.05 1394.11 2.4 3.0 200 23.90 0.1156 3.41 0.0549
4 B4 B5 1397.11 1405.4 8.29 51.27 16.17 23.90 1395.91 1401.4 1.2 4.0 200 23.90 0.1071 3.32 0.056
5 B5 B6 1405.4 1417 11.60 31.48 36.85 23.90 1404.20 1412 1.2 5.0 200 23.90 0.2478 4.47 0.045
6 B6 B6' 1417 1428.56 11.56 28.44 40.65 23.90 1415.50 1426.36 1.5 2.2 200 23.90 0.3819 5.21 0.041
7 B6' B7 1428.56 1429.18 0.62 47.35 1.31 23.90 1426.36 1427.98 2.2 1.2 200 23.90 0.0342 2.20 0.076
8 B7 B8 1429.18 1431 1.82 37.9 4.80 23.90 1427.98 1429 1.2 2.0 200 23.90 0.0269 2.02 0.081
9 B8 B9 1431 1430.51 0.49 32.23 1.52 23.90 1429.00 1429.31 2.0 1.2 200 23.90 0.0096 1.37 0.11
10 B9 B10 1430.51 1433.58 3.07 92.9 3.30 23.90 1429.31 1432.08 1.2 1.5 200 23.90 0.0298 2.09 0.078
11 B10 B11 1433.58 1434.54 0.96 49.43 1.94 23.90 1432.08 1433.34 1.5 1.2 200 23.90 0.0255 1.98 0.08
12 B11 B12 1434.54 1436.41 1.87 67.31 2.78 23.90 1433.34 1435.21 1.2 1.2 200 23.90 0.0278 2.04 0.028
13 B12 B13 1436.41 1437.36 0.95 57.95 1.64 23.90 1435.21 1436.16 1.2 1.2 200 23.90 0.0164 1.68 0.093
14 B13 B14 1437.36 1439.75 2.39 63.95 3.74 23.90 1436.16 1438.55 1.20 1.20 200 23.90 0.0374 2.27 0.07
15 B14 B15 1439.75 1440.00 0.25 24.36 1.03 23.90 1438.55 1438.80 1.20 1.20 200 23.90 0.0103 1.41 0.11
16 B15 B16 1440.00 1440.54 0.54 26.99 2.00 23.90 1438.80 1439.34 1.20 1.20 200 23.90 0.0200 1.81 0.09
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 02
17 B16 B170 1440.54 1441.00 0.46 23.66 1.94 23.90 1439.34 1439.80 1.2 1.2 200 23.90 0.0194 1.79 0.088
18 B170 B18 1441.00 1441.74 0.74 23.94 3.09 23.90 1439.80 1440.24 1.2 1.5 200 23.90 0.0184 1.75 0.089
19 B18 B19 1441.74 1442.28 0.54 31.15 1.73 23.90 1440.24 1441.08 1.5 1.2 200 23.90 0.0270 2.02 0.081
20 B19 B20 1442.28 1443.41 1.13 58.65 1.93 23.90 1441.08 1442.21 1.2 1.2 200 23.90 0.0193 1.78 0.019
21 B20 B21 1443.41 1448.68 5.27 88.90 5.93 23.90 1442.21 1447.48 1.2 1.2 200 23.90 0.0593 2.68 0.065
22 B21 B22 1448.68 1454.38 5.70 74.80 7.62 23.90 1447.48 1452.38 1.2 2.0 200 23.90 0.0655 2.78 0.064
23 B22 B23 1454.38 1458.73 4.35 26.35 16.51 23.90 1452.38 1454.73 2.0 4.0 200 23.90 0.0892 3.11 0.059
24 B23 B24 1458.73 1457.65 1.08 34.01 3.18 23.90 1454.73 1456.45 4.0 1.2 200 23.90 0.0506 2.54 0.068
25 B24 B25 1457.65 1458.75 1.10 46.13 2.38 23.90 1456.45 1457.55 1.2 1.2 200 23.90 0.0238 1.93 0.083
26 B25 B26 1458.75 1460.66 1.91 54.74 3.49 23.90 1457.55 1459.46 1.2 1.2 200 23.90 0.0349 2.22 0.075
27 B26 B27 1460.66 1461.53 0.87 29.01 3.00 23.90 1459.46 1460.33 1.2 1.2 200 23.90 0.0300 2.09 0.078
28 B27 B28 1461.53 1462.56 1.03 28.96 3.56 23.90 1460.33 1461.36 1.2 1.2 200 23.90 0.0356 2.23 0.075
29 B28 B29 1462.56 1463.56 1.00 30.52 3.28 23.90 1461.36 1462.36 1.2 1.2 200 23.90 0.0328 2.17 0.076
30 B29 B30 1463.56 1465.15 1.59 8.88 17.91 23.90 1462.36 1463.15 1.2 2.0 200 23.90 0.0890 3.11 0.059
31 B30 B31 1465.15 1464.79 0.36 10.20 3.53 23.90 1463.15 1463.59 2.0 1.2 200 23.90 0.0431 2.39 0.071
32 B31 B32 1464.79 1465.65 0.86 60.71 1.42 23.90 1463.59 1464.45 1.2 1.2 200 23.90 0.0142 1.59 0.097
33 B32 B33 1465.65 1467.55 1.90 53.32 3.56 23.90 1464.45 1466.35 1.2 1.2 200 23.90 0.0356 2.23 0.075
34 B33 B34 1467.55 1468.71 1.16 74.43 1.56 23.90 1466.35 1467.51 1.2 1.2 200 23.90 0.0156 1.65 0.094
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 03
35 B34 B35 1468.71 1470.45 1.74 85.38 2.04 23.90 1467.51 1469.25 1.2 1.2 200 23.90 0.0204 1.82 0.09
36 B35 B36 1470.45 1470.72 0.27 35.95 0.75 23.90 1469.25 1469.52 1.2 1.2 200 23.90 0.0075 1.25 0.12
37 B36 B37 1470.72 1474.60 3.88 86.76 4.47 23.90 1469.52 1473.40 1.2 1.2 200 23.90 0.0447 2.42 0.07
38 B37 B38 1474.60 1477.49 2.89 56.21 5.14 23.90 1473.40 1476.29 1.2 1.2 200 23.90 0.0514 2.55 0.07
39 B38 B39 1477.49 1479.65 2.16 51.79 4.17 23.90 1476.29 1478.45 1.2 1.2 200 23.90 0.0417 2.36 0.07
40 B39 B40 1479.65 1481.95 2.30 61.90 3.72 23.90 1478.45 1480.75 1.2 1.2 200 23.90 0.0372 2.27 0.07
41 B40 B41 1481.95 1484.83 2.88 54.41 5.29 23.90 1480.75 1482.83 1.2 2.0 200 23.90 0.0382 2.29 0.07
42 B41 B42 1484.83 1484.93 0.10 23.91 0.42 23.90 1482.83 1483.53 2.0 1.4 200 23.90 0.0293 2.08 0.08
43 B42 B43 1484.93 1485.64 0.71 21.03 3.38 23.90 1483.53 1484.44 1.4 1.2 200 23.90 0.0433 2.40 0.07
44 B43 B44 1485.64 1486.34 0.70 32.32 2.17 23.90 1484.44 1484.84 1.2 1.5 200 23.90 0.0124 1.51 0.10
45 B44 B45 1486.34 1486.55 0.21 44.68 0.47 23.90 1484.84 1485.35 1.5 1.2 200 23.90 0.0114 1.47 0.10
46 B45 B46 1486.55 1488.47 1.92 35.42 5.42 23.90 1485.35 1487.27 1.2 1.2 200 23.90 0.0542 2.60 0.07
47 B46 B47 1488.47 1489.41 0.94 26.04 3.61 23.90 1487.27 1488.21 1.2 1.2 200 23.90 0.0361 2.24 0.07
48 B47 B48 1489.41 1490.68 1.27 22.22 5.72 23.90 1488.21 1489.48 1.2 1.2 200 23.90 0.0572 2.65 0.07
49 B48 B49 1490.68 1492.57 1.89 25.39 7.44 23.90 1489.48 1491.37 1.2 1.2 200 23.90 0.0744 2.91 0.06
50 B49 B50 1492.57 1494.57 2.00 51.54 3.88 23.90 1491.37 1492.37 1.2 2.2 200 23.90 0.0194 1.79 0.09
51 B50 B51 1494.57 1497.21 2.64 36.38 7.26 23.90 1492.37 1493.71 2.2 3.5 200 23.90 0.0368 2.26 0.04
52 B51 B52 1497.21 1498.60 1.39 21.16 6.57 23.90 1493.71 1495.40 3.5 3.2 200 23.90 0.0799 2.26 0.07
53 B52 B53 1498.60 1500.30 1.70 66.19 2.57 23.90 1495.40 1499.10 3.2 1.2 200 23.90 0.0559 2.63 0.66
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 04
54 B53 B54 1500.30 1501.64 1.34 72.65 1.84 23.90 1499.10 1499.94 1.2 1.7 200 23.90 0.0116 2.13 0.08
55 B54 B55 1501.64 1501.71 0.07 36.57 0.19 23.90 1499.94 1500.51 1.7 1.2 200 23.90 0.0156 1.65 0.09
56 B55 B56 1501.71 1502.49 0.78 55.81 1.40 23.90 1500.51 1501.29 1.2 1.2 200 23.90 0.0140 1.58 0.10
57 B56 B57 1502.49 1503.54 1.05 32.85 3.20 23.90 1501.29 1502.34 1.2 1.2 200 23.90 0.0320 1.58 0.10
58 B57 B58 1503.54 1507.21 3.67 70.04 5.24 23.90 1502.34 1506.01 1.2 1.2 200 23.90 0.0524 2.56 0.07
59 B58 B59 1507.21 1513.73 6.52 84.50 7.72 23.90 1506.01 1512.53 1.2 1.2 200 23.90 0.0772 2.95 0.06
60 B59 B60 1513.73 1515.67 1.94 50.43 3.85 23.90 1512.53 1514.47 1.2 1.2 200 23.90 0.0385 2.29 0.07
61 B60 B61 1515.67 1517.00 1.33 38.97 3.41 23.90 1514.47 1515.80 1.2 1.2 200 23.90 0.0341 2.19 0.08
62 B61 B62 1517.00 1520.75 3.75 68.30 5.49 23.90 1515.80 1519.55 1.2 1.2 200 23.90 0.0549 2.61 0.07
63 B62 B63 1520.75 1524.07 3.32 69.14 4.80 23.90 1519.55 1522.87 1.2 1.2 200 23.90 0.0480 2.49 0.07
64 B63 B64 1524.07 1528.79 4.72 79.11 5.97 23.90 1522.87 1526.59 1.2 2.2 200 23.90 0.0470 2.47 0.07
65 B64 B65 1528.79 1528.99 0.20 34.61 0.58 23.90 1526.59 1527.49 2.2 1.5 200 23.90 0.0260 1.99 0.08
66 B65 B66 1528.99 1528.92 0.07 32.88 0.21 23.90 1527.49 1527.72 1.5 1.2 200 23.90 0.0070 1.22 0.12
67 B66 B67 1528.92 1529.59 0.67 11.84 5.66 23.90 1527.72 1528.39 1.2 1.2 200 23.90 0.0566 2.64 0.07
68 B67 B68 1529.59 1532.10 2.51 32.10 7.82 23.90 1528.39 1529.90 1.2 2.2 200 23.90 0.0470 2.47 0.07
69 B68 B69 1532.10 1532.46 0.36 43.77 0.82 23.90 1529.90 1530.26 2.2 2.2 200 23.90 0.0082 1.29 0.11
70 B69 B70 1532.46 1532.39 0.07 4.13 1.69 23.90 1530.26 1530.39 2.2 2.0 200 23.90 0.0315 2.15 0.08
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 05
71 B70 B71 1532.39 1539.23 6.84 15.86 43.13 23.90 1530.39 1534.23 2.0 5.0 200 23.90 0.2421 4.43 0.05
72 B71 B72 1539.23 1542.33 3.10 32.29 9.60 23.90 1534.23 1538.33 5.0 4.0 200 23.90 0.1270 3.53 0.05
73 B72 B73 1542.33 1546.00 3.67 20.62 17.80 23.90 1538.33 1542.00 4.0 4.0 200 23.90 0.1780 3.98 0.05
74 B73 B74 1546.00 1550.69 4.69 18.73 25.04 23.90 1542.00 1545.69 4.0 5.0 200 23.90 0.1970 4.12 0.05
75 B74 B75 1550.69 1559.01 8.32 96.18 8.65 23.90 1548.19 1554.96 2.5 4.05 200 23.90 0.0704 2.86 0.06
76 B75 B76 1559.01 1560.51 1.50 41.28 3.63 23.90 1557.01 1558.51 2.0 2.0 200 23.90 0.0363 2.25 0.07
77 B76 B77 1560.51 1565.30 4.79 80.00 5.99 23.90 1558.51 1562.80 2.0 2.5 200 23.90 0.0536 2.59 0.07
78 B77 B78 1565.30 1577.62 12.32 82.22 14.98 23.90 1562.80 1572.62 2.5 5.0 200 23.90 0.1194 3.45 0.05
79 B78 B79 1577.62 1583.30 5.68 37.77 15.04 23.90 1572.62 1579.30 5.0 4.0 200 23.90 0.1769 3.97 0.05
80 B79 B80 1583.30 1595.00 11.70 42.79 27.34 23.90 1579.30 1590.00 4.0 5.0 200 23.90 0.2501 4.49 0.05
81 B80 B81 1595.00 1596.98 1.98 61.12 3.24 23.90 1590.00 1594.48 5.0 2.5 200 23.90 0.0733 2.90 0.06
82 B81 B82 1596.98 1601.08 4.10 56.10 7.31 23.90 1594.48 1599.88 2.5 1.2 200 23.90 0.0963 3.19 0.06
83 B82 B83 1601.08 1605.68 4.60 68.88 6.68 23.90 1599.88 1604.48 1.2 1.2 200 23.90 0.0668 2.80 0.06
84 B83 B84 1605.68 1606.52 0.84 20.41 4.12 23.90 1604.48 1605.32 1.2 1.2 200 23.90 0.0412 2.35 0.07
85 B84 B85 1606.52 1608.90 2.38 41.50 5.73 23.90 1605.32 1607.70 1.2 1.2 200 23.90 0.0573 2.65 0.07
86 B85 B86 1608.90 1611.76 2.86 50.80 5.63 23.90 1607.70 1610.56 1.2 1.2 200 23.90 0.0563 2.63 0.07
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 06
87 B86 B87 1611.76 1614.02 2.26 60.00 3.77 23.90 1610.56 1612.82 1.2 1.2 200 23.90 0.038 2.29 0.07
88 B87 B88 1614.02 1619.18 5.16 90.70 5.69 23.90 1612.82 1617.98 1.2 1.2 200 23.90 0.057 2.65 0.07
89 B88 B89 1619.18 1624.93 5.75 90.70 6.34 23.90 1617.98 1623.73 1.2 1.2 200 23.90 0.063 2.74 0.06
90 B89 B90 1624.93 1627.63 2.70 37.21 7.26 23.90 1623.73 1626.43 1.2 1.2 200 23.90 0.073 2.89 0.06
91 B89 B91 1627.63 1632.30 4.67 76.79 6.08 23.90 1626.43 1631.10 1.2 1.2 200 23.90 0.061 2.71 0.06
92 B91 B92 1632.30 1633.86 1.56 28.85 5.41 23.90 1631.10 1632.66 1.2 1.2 200 23.90 0.054 2.59 0.07
93 B91 B93 1633.86 1638.66 4.80 71.50 6.71 23.90 1632.66 1637.46 1.2 1.2 200 23.90 0.067 2.81 0.06
94 B93 B94 1638.66 1643.08 4.42 65.72 6.73 23.90 1637.46 1641.88 1.2 1.2 200 23.90 0.067 2.81 0.06
95 B93 B95 1643.08 1648.12 5.04 78.92 6.39 23.90 1641.88 1646.92 1.2 1.2 200 23.90 0.064 2.76 0.06
96 B95 B96 1648.12 1652.89 4.77 66.40 7.18 23.90 1646.92 1651.69 1.2 1.2 200 23.90 0.072 2.88 0.06
97 B96 B97 1652.89 1654.62 1.73 25.35 6.82 23.90 1651.69 1653.42 1.2 1.2 200 23.90 0.068 2.82 0.06
98 B97 B98 1654.62 1656.27 1.65 21.60 7.64 23.90 1607.70 1655.07 1.2 1.2 200 23.90 2.193 9.73 0.03
99 B98 B99 1656.27 1657.57 1.30 18.40 7.07 23.90 1653.42 1656.37 1.2 1.2 200 23.90 0.160 3.83 0.05
100 B99 B100 1657.57 1658.82 1.25 18.60 6.72 23.90 1656.37 1657.62 1.2 1.2 200 23.90 0.067 2.81 0.06
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 07
101 B100 B101 1658.82 1665.44 6.62 93.50 7.08 23.90 1657.62 1664.24 1.2 1.2 200 23.90 0.071 2.86 0.06
102 B101 B102 1665.44 1670.77 5.33 80.00 6.66 23.90 1664.24 1669.57 1.2 1.2 200 23.90 0.067 2.81 0.06
103 B102 B103 1670.77 1672.92 2.15 35.20 6.11 23.90 1669.57 1671.72 1.2 1.2 200 23.90 0.061 2.71 0.06
104 B103 B104 1672.92 1675.85 2.93 44.80 6.54 23.90 1671.72 1674.65 1.2 1.2 200 23.90 0.065 2.77 0.06
105 B104 B105 1675.85 1679.57 3.72 60.00 6.20 23.90 1674.65 1678.37 1.2 1.2 200 23.90 0.062 2.73 0.06
106 B105 B106 1679.57 1682.53 2.96 52.30 5.66 23.90 1678.37 1681.33 1.2 1.2 200 23.90 0.057 2.65 0.07
107 B106 B107 1682.53 1685.27 2.74 52.55 5.21 23.90 1681.33 1684.07 1.2 1.2 200 23.90 0.052 2.56 0.07
108 B107 B108 1685.27 1687.00 1.73 30.35 5.70 23.90 1684.07 1685.80 1.2 1.2 200 23.90 0.057 2.65 0.07
109 B108 B109 1687.00 1691.33 4.33 99.10 4.37 23.90 1685.80 1690.13 1.2 1.2 200 23.90 0.044 2.41 0.07
110 B109 B110 1691.33 1693.10 1.77 55.30 3.20 23.90 1690.13 1691.90 1.2 1.2 200 23.90 0.032 2.41 0.04
111 B110 B111 1693.10 1694.62 1.52 44.60 3.41 23.90 1691.90 1693.42 1.2 1.2 200 23.90 0.034 2.20 0.08
112 B111 B112 1694.62 1696.15 1.53 37.92 4.03 23.90 1693.42 1694.95 1.2 1.2 200 23.90 0.040 2.33 0.07
113 B112 B113 1696.15 1697.62 1.47 37.58 3.91 23.90 1694.95 1696.42 1.2 1.2 200 23.90 0.039 2.31 0.07
114 B113 B114 1697.62 1699.46 1.84 41.45 4.44 23.90 1696.42 1698.26 1.2 1.2 200 23.90 0.044 2.41 0.07
115 B114 B115 1699.46 1700.92 1.46 28.85 5.06 23.90 1678.37 1699.72 1.2 1.2 200 23.90 0.740 6.58 0.03
116 B115 B116 1700.92 1702.86 1.94 32.50 5.97 23.90 1699.72 1701.66 1.2 1.2 200 23.90 0.060 2.70 0.07
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

B
117 B116 B117 1702.86 1705.75 2.89 42.30 6.83 23.90 1701.66 1704.55 1.2 1.2 200 23.90 0.068 2.82 0.06
118 B117 B118 1705.75 1710.93 5.18 83.60 6.20 23.90 1704.55 1709.73 1.2 1.2 200 23.90 0.062 2.73 0.06
119 B118 B119 1710.93 1714.08 3.15 50.20 6.27 23.90 1709.73 1712.88 1.2 1.2 200 23.90 0.063 2.74 0.06
120 B119 B120 1714.08 1715.91 1.83 31.40 5.83 23.90 1712.88 1714.71 1.2 1.2 200 23.90 0.058 2.66 0.07
121 B120 B121 1715.91 1717.21 1.30 20.00 6.50 23.90 1714.71 1716.01 1.2 1.2 200 23.90 0.065 2.77 0.06
122 B121 B122 1717.21 1721.54 4.33 43.00 10.07 23.90 1716.01 1720.34 1.2 1.2 200 23.90 0.101 3.25 0.06
123 B122 B123 1721.54 1727.34 5.80 65.50 8.85 23.90 1720.34 1726.14 1.2 1.2 200 23.90 0.089 3.11 0.06
124 B123 B124 1727.34 1731.13 3.79 45.70 8.29 23.90 1726.14 1729.93 1.2 1.2 200 23.90 0.083 3.03 0.06
125 B124 B125 1731.13 1732.83 1.70 20.50 8.29 23.90 1729.93 1731.63 1.2 1.2 200 23.90 0.083 3.03 0.06
126 B125 B126 1732.83 1734.90 2.07 19.00 10.89 23.90 1731.63 1733.70 1.2 1.2 200 23.90 0.109 3.34 0.06
127 B126 B127 1734.90 1736.30 1.40 12.05 11.62 23.90 1733.70 1735.10 1.2 1.2 200 23.90 0.116 3.41 0.05
128 B127 B128 1736.30 1738.60 2.30 9.00 25.56 23.90 1735.10 1737.40 1.2 1.2 200 23.90 0.256 4.52 0.05
129 B128 B129 1738.60 1744.00 5.40 20.35 26.54 23.90 1737.40 1742.80 1.2 1.2 200 23.90 0.265 4.58 0.05
130 B129 B130 1744.00 1746.40 2.40 11.65 20.60 23.90 1742.80 1745.20 1.2 1.2 200 23.90 0.206 4.19 0.05
131 B130 B131 1746.40 1753.39 6.99 29.25 23.90 23.90 1745.20 1752.19 1.2 1.2 200 23.90 0.239 4.42 0.05
132 B131 B132 1753.39 1757.14 3.75 17.00 22.06 23.90 1752.19 1755.94 1.2 1.2 200 23.90 0.221 4.29 0.05
133 B132 B133 1757.14 1758.12 0.98 16.60 5.90 23.90 1755.94 1756.92 1.2 1.2 200 23.90 0.059 2.68 0.07
134 B133 B134 1758.12 1758.80 0.68 10.40 6.54 23.90 1756.92 1757.60 1.2 1.2 200 23.90 0.065 2.77 0.06
135 B134 B135 1758.80 1760.44 1.64 20.00 8.20 23.90 1757.60 1759.24 1.2 1.2 200 23.90 0.082 3.02 0.06
136 B135 B136 1760.44 1761.70 1.26 23.10 5.45 23.90 1759.24 1760.50 1.2 1.2 200 23.90 0.055 2.61 0.07
137 B136 B137 1761.70 1761.80 0.10 15.10 0.66 23.90 1760.50 1760.60 1.2 1.2 200 23.90 0.007 1.22 0.12
138 B137 B138 1761.80 1762.66 0.86 31.20 2.76 23.90 1760.60 1761.46 1.2 1.2 200 23.90 0.028 2.05 0.08
139 B138 B139 1762.66 1763.21 0.55 16.60 3.31 23.90 1761.46 1762.01 1.2 1.2 200 23.90 0.033 2.17 0.08
140 B139 B140 1763.21 1765.29 2.08 65.20 3.19 23.90 1762.01 1764.09 1.2 1.2 200 23.90 0.032 2.15 0.08
141 B140 B141 1765.29 1766.34 1.05 25.42 4.13 23.90 1764.09 1765.14 1.2 1.2 200 23.90 0.041 2.35 0.07
142 B141 B142 1766.34 1767.12 0.78 17.78 4.39 23.90 1765.14 1765.92 1.2 1.2 200 23.90 0.044 2.41 0.07
143 B142 B143 1767.12 1767.88 0.76 23.12 3.29 23.90 1765.92 1766.68 1.2 1.2 200 23.90 0.033 2.17 0.08
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 09
144 B143 B144 1767.88 1771.31 3.43 82.48 4.16 23.90 1766.68 1770.11 1.2 1.2 200 23.90 0.042 2.37 0.07
145 B144 B145 1771.31 1773.05 1.74 24.3 7.16 23.90 1770.11 1771.85 2.4 1.2 200 23.90 0.072 2.88 0.06
146 B145 B146 1773.05 1782.19 9.14 86.35 10.58 23.90 1771.85 1779.79 1.2 2.4 200 23.90 0.092 3.14 0.06
147 B146 B147 1782.19 1787.77 5.58 38.35 14.55 23.90 1781.00 1786.57 2.4 1.2 200 23.90 0.145 3.70 0.05
148 B147 B148 1787.77 1795.51 7.74 61.80 12.52 23.90 1786.57 1794.31 1.2 1.2 200 23.90 0.125 3.51 0.05
149 B148 B149 1795.51 1804.23 8.72 60.10 14.51 23.90 1794.31 1803.03 1.2 1.2 200 23.90 0.145 3.70 0.05
150 B149 B150 1804.23 1808.26 4.03 29.10 13.85 23.90 1803.03 1807.06 1.2 1.2 200 23.90 0.138 3.63 0.05
151 B150 B151 1808.26 1813.65 5.39 40.00 13.48 23.90 1807.06 1812.45 1.2 1.2 200 23.90 0.135 3.60 0.05
152 B151 B152 1813.65 1822.10 8.45 69.66 12.13 23.90 1812.45 1820.90 1.2 1.2 200 23.90 0.121 3.47 0.05
153 B152 B153 1822.10 1827.10 5.00 44.14 11.33 23.90 1820.90 1825.90 1.2 1.2 200 23.90 0.113 3.47 0.05
154 B153 B154 1827.10 1831.94 4.84 35.20 13.75 23.90 1825.90 1830.74 1.2 1.2 200 23.90 0.138 3.63 0.05
155 B154 B155 1831.94 1836.94 5.00 48.60 10.29 23.90 1830.74 1835.74 1.2 1.2 200 23.90 0.103 3.27 0.06
156 B155 B156 1836.94 1838.26 1.32 19.20 6.87 23.90 1835.74 1837.06 1.2 1.2 200 23.90 0.069 2.83 0.06
157 B156 B157 1838.26 1839.84 1.58 17.00 9.29 23.90 1837.06 1838.64 1.2 1.2 200 23.90 0.093 3.16 0.06
158 B157 B158 1839.84 1842.02 2.18 22.48 9.70 23.90 1838.64 1840.82 1.2 1.2 200 23.90 0.097 3.20 0.06
159 B158 B159 1842.02 1843.83 1.81 18.27 9.91 23.90 1840.82 1842.63 1.2 1.2 200 23.90 0.099 3.23 0.06
160 B159 B160 1843.83 1849.28 5.45 55.60 9.80 23.90 1842.63 1848.08 1.2 1.2 200 23.90 0.098 3.21 0.06
161 B160 B161 1849.28 1851.76 2.48 27.55 9.00 23.90 1848.08 1850.56 1.2 1.2 200 23.90 0.090 3.12 0.06
162 B161 B162 1851.76 1854.24 2.48 26.30 9.43 23.90 1850.56 1853.04 1.2 1.2 200 23.90 0.094 3.17 0.06
163 B162 B163 1854.24 1856.41 2.17 21.86 9.93 23.90 1853.04 1855.21 1.2 1.2 200 23.90 0.099 3.23 0.06
164 B163 B164 1856.41 1858.11 1.70 19.74 8.61 23.90 1855.21 1856.91 1.2 1.2 200 23.90 0.086 3.07 0.06
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 10
165 B164 B165 1858.11 1860.30 2.19 28.00 7.82 23.90 1856.91 1859.10 1.2 1.2 200 23.90 0.078 2.96 0.06
166 B165 B166 1860.30 1863.59 3.29 51.70 6.36 23.90 1859.10 1862.39 1.2 1.2 200 23.90 0.064 2.76 0.06
167 B166 B167 1863.59 1866.32 2.73 42.50 6.42 23.90 1862.39 1865.12 1.2 1.2 200 23.90 0.064 2.76 0.06
168 B167 B168 1866.32 1867.44 1.12 17.30 6.47 23.90 1865.12 1866.24 1.2 1.2 200 23.90 0.065 2.77 0.06
169 B168 B169 1867.44 1869.14 1.70 14.90 11.41 23.90 1866.24 1867.94 1.2 1.2 200 23.90 0.114 3.39 0.06
170 B169 B170 1869.14 1870.30 1.16 14.10 8.23 23.90 1867.94 1869.10 1.2 1.2 200 23.90 0.082 3.02 0.06
171 B170 B171 1870.30 1872.62 2.32 35.90 6.46 23.90 1869.10 1871.42 1.2 1.2 200 23.90 0.065 2.77 0.06
172 B171 B172 1872.62 1879.29 6.67 77.27 8.63 23.90 1871.42 1878.09 1.2 1.2 200 23.90 0.086 3.07 0.06
173 B172 B173 1879.29 1885.33 6.04 68.53 8.81 23.90 1878.09 1884.13 1.2 1.2 200 23.90 0.088 3.09 0.06
174 B173 B174 1885.33 1890.82 5.49 73.90 7.43 23.90 1884.13 1889.62 1.2 1.2 200 23.90 0.074 2.91 0.06
175 B174 B175 1890.82 1893.19 2.37 30.30 7.82 23.90 1889.62 1891.99 1.2 1.2 200 23.90 0.078 2.96 0.06
176 B175 B176 1893.19 1894.66 1.47 14.25 10.32 23.90 1891.99 1893.46 1.2 1.2 200 23.90 0.103 3.27 0.06
177 B176 B177 1894.66 1897.89 3.23 25.75 12.54 23.90 1893.46 1896.69 1.2 1.2 200 23.90 0.125 3.51 0.05
178 B177 B178 1897.89 1901.46 3.57 33.40 10.69 23.90 1896.69 1900.26 1.2 1.2 200 23.90 0.107 3.32 0.06
179 B178 C1 1901.46 1903.21 1.75 15.50 11.29 23.90 1900.26 1902.61 1.2 0.6 200 23.90 0.152 3.92 0.05
180 C1 C2 1903.21 1911.90 8.69 91.10 9.54 23.90 1902.61 1911.30 0.6 0.6 200 23.90 0.095 3.18 0.06
181 C2 C3 1911.90 1914.02 2.12 27.80 7.63 23.90 1911.30 1913.42 0.6 0.6 200 23.90 0.076 2.94 0.06
182 C3 C4 1914.02 1914.78 0.76 16.70 4.55 23.90 1913.42 1914.18 0.6 0.6 200 23.90 0.046 2.45 0.07
183 C4 C5 1914.78 1919.97 5.19 61.65 8.42 23.90 1914.18 1919.37 0.6 0.6 200 23.90 0.084 2.98 0.06
184 C5 C6 1919.97 1932.80 12.83 43.25 29.66 23.90 1919.37 1932.20 0.6 0.6 200 23.90 0.297 4.81 0.04
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 11
185 C6 C7 1932.80 1933.08 0.28 6.70 4.18 23.90 1932.20 1932.48 0.6 0.6 200 23.90 0.042 2.37 0.07
186 C7 C8 1933.08 1934.99 1.91 56.44 3.38 23.90 1932.48 1934.39 0.6 0.6 200 23.90 0.034 2.20 0.08
187 C8 C9 1934.99 1935.32 0.33 15.36 2.15 23.90 1934.39 1934.72 0.6 0.6 200 23.90 0.021 1.84 0.09
188 C9 C10 1935.32 1936.84 1.52 43.39 3.50 23.90 1934.72 1936.24 0.6 0.6 200 23.90 0.035 2.22 0.08
189 C10 C11 1936.84 1937.27 0.43 23.58 1.82 23.90 1936.24 1936.67 0.6 0.6 200 23.90 0.018 1.74 0.09
190 C11 C12 1937.27 1937.88 0.61 23.87 2.56 23.90 1936.67 1937.28 0.6 0.6 200 23.90 0.026 1.99 0.08
191 C12 C13 1937.88 1938.41 0.53 28.26 1.88 23.90 1937.28 1937.81 0.6 0.6 200 23.90 0.019 1.77 0.09
192 C13 C14 1938.41 1938.59 0.18 20.52 0.88 23.90 1937.81 1937.99 0.6 0.6 200 23.90 0.009 1.34 0.11
193 C14 C15 1938.59 1938.85 0.26 35.28 0.74 23.90 1937.99 1938.26 0.6 0.6 200 23.90 0.008 1.28 0.11
194 C15 C16 1938.85 1938.88 0.03 8.02 0.37 23.90 1938.26 1938.28 0.6 0.6 200 23.90 0.002 1.06 0.13
195 C16 C17 1938.88 1939.06 0.18 30.86 0.58 23.90 1938.28 1938.46 0.6 0.6 200 23.90 0.006 1.06 0.13
196 C17 C18 1939.06 1939.62 0.56 10.12 5.53 23.90 1938.46 1939.02 0.6 0.6 200 23.90 0.055 2.61 0.07
197 C18 C19 1939.62 1940.38 0.76 11.21 6.78 23.90 1939.02 1939.78 0.6 0.6 200 23.90 0.068 2.82 0.06
198 C19 C20 1940.38 1941.74 1.36 96.61 1.41 23.90 1939.78 1941.14 0.6 0.6 200 23.90 0.014 1.58 0.10
199 C20 C21 1941.74 1943.01 1.27 44.21 2.87 23.90 1941.14 1942.41 0.6 0.6 200 23.90 0.029 2.10 0.08
200 C21 C22 1943.01 1943.08 0.07 9.00 0.78 23.90 1942.41 1942.48 0.6 0.6 200 23.90 0.008 0.97 0.15
201 C22 C23 1943.08 1943.15 0.07 11.53 0.61 23.90 1942.48 1942.55 0.6 0.6 200 23.90 0.006 0.97 0.15
202 C23 C24 1943.15 1944.36 1.21 38.85 3.11 23.90 1942.55 1943.76 0.6 0.6 200 23.90 0.031 2.12 0.08
203 C24 C25 1944.36 1944.56 0.20 26.28 0.76 23.90 1943.76 1943.96 0.6 0.6 200 23.90 0.008 1.28 0.12
204 C25 C26 1944.56 1944.92 0.36 23.05 1.56 23.90 1943.96 1944.32 0.6 0.6 200 23.90 0.016 1.63 0.10
205 C26 C27 1944.92 1944.98 0.06 13.02 0.46 23.90 1944.32 1944.38 0.6 0.6 200 23.90 0.005 1.15 0.13
206 C27 C28 1944.98 1945.30 0.32 18.11 1.77 23.90 1944.38 1944.70 0.6 0.6 200 23.90 0.018 1.74 0.09
207 C28 C29 1945.30 1945.63 0.33 16.59 1.99 23.90 1944.70 1945.03 0.6 0.6 200 23.90 0.020 1.81 0.09
208 C29 C30 1945.63 1946.02 0.39 22.30 1.75 23.90 1945.03 1945.42 0.6 0.6 200 23.90 0.017 1.70 0.09
209 C30 C31 1946.02 1947.74 1.72 36.87 4.67 23.90 1945.42 1947.14 0.6 0.6 200 23.90 0.047 2.47 0.07
210 C31 C32 1947.74 1948.00 0.26 21.56 1.21 23.90 1947.14 1947.40 0.6 0.6 200 23.90 0.012 1.50 0.10
211 C32 C33 1948.00 1949.55 1.55 46.17 3.36 23.90 1947.40 1948.95 0.6 0.6 200 23.90 0.034 2.20 0.08
212 C33 C34 1949.55 1950.04 0.49 31.84 1.54 23.90 1948.95 1949.44 0.6 0.6 200 23.90 0.015 1.63 0.10
213 C34 C35 1950.04 1951.55 1.51 47.36 3.19 23.90 1949.44 1950.95 0.6 0.6 200 23.90 0.032 2.15 0.08
214 C35 C36 1951.55 1951.80 0.25 16.18 1.55 23.90 1950.95 1951.20 0.6 0.6 200 23.90 0.015 1.63 0.10
215 C36 C37 1951.80 1951.97 0.17 16.46 1.03 23.90 1950.95 1951.37 0.6 0.6 200 23.90 0.026 1.99 0.08
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 12
216 C37 C38 1951.97 1952.45 0.48 15.53 3.09 23.90 1951.37 1951.85 0.6 0.6 200 23.90 0.031 2.10 0.08
217 C38 C39 1952.45 1954.08 1.63 54.18 3.01 23.90 1951.85 1953.48 0.6 0.6 200 23.90 0.030 2.10 0.08
218 C39 C40 1954.08 1956.76 2.68 82.63 3.24 23.90 1953.48 1956.16 0.6 0.6 200 23.90 0.032 2.15 0.08
219 C40 C41 1956.76 1958.64 1.88 86.70 2.17 23.90 1956.16 1958.04 0.6 0.6 200 23.90 0.022 1.84 0.09
220 C41 C42 1958.64 1958.72 0.08 22.34 0.36 23.90 1958.04 1958.12 0.6 0.6 200 23.90 0.004 1.06 0.13
221 C42 C43 1958.72 1959.16 0.44 20.04 2.20 23.90 1958.12 1958.56 0.6 0.6 200 23.90 0.022 1.81 0.09
222 C43 C44 1959.16 1959.34 0.18 40.09 0.45 23.90 1958.56 1958.74 0.6 0.6 200 23.90 0.004 1.06 0.13
223 C44 C45 1959.34 1959.68 0.34 60.13 0.57 23.90 1958.74 1959.08 0.6 0.6 200 23.90 0.006 1.15 0.13
224 C45 C46 1959.68 1959.90 0.22 37.90 0.58 23.90 1959.08 1959.30 0.6 0.6 200 23.90 0.006 1.15 0.13
225 C46 C47 1959.90 1960.00 0.10 18.73 0.53 23.90 1959.30 1959.40 0.6 0.6 200 23.90 0.005 1.06 0.13
226 C47 C48 1960.00 1960.18 0.18 23.54 0.76 23.90 1959.40 1959.58 0.6 0.6 200 23.90 0.008 1.28 0.11
227 C48 C49 1960.18 1960.29 0.11 20.04 0.55 23.90 1959.58 1959.69 0.6 0.6 200 23.90 0.005 1.06 0.13
228 C49 C50 1960.29 1960.46 0.17 20.04 0.85 23.90 1959.69 1959.86 0.6 0.6 200 23.90 0.008 1.28 0.11
229 C50 C51 1960.46 1960.65 0.19 28.92 0.66 23.90 1959.86 1960.05 0.6 0.6 200 23.90 0.007 1.22 0.12
230 C51 C52 1960.65 1960.78 0.13 11.16 1.16 23.90 1960.05 1960.18 0.6 0.6 200 23.90 0.012 1.50 0.10
231 C52 C53 1960.78 1961.15 0.37 8.96 4.13 23.90 1960.18 1960.55 0.6 0.6 200 23.90 0.041 2.35 0.07
232 C53 C54 1961.15 1961.52 0.37 19.35 1.91 23.90 1960.55 1960.92 0.6 0.6 200 23.90 0.019 1.77 0.09
233 C54 C55 1961.52 1961.77 0.25 40.19 0.62 23.90 1960.92 1961.17 0.6 0.6 200 23.90 0.006 1.15 0.13
234 C55 C56 1961.77 1962.60 0.83 37.81 2.20 23.90 1961.17 1962.00 0.6 0.6 200 23.90 0.022 1.87 0.09
235 C56 C57 1962.60 1964.76 2.16 39.07 5.53 23.90 1962.00 1964.16 0.6 0.6 200 23.90 0.055 2.61 0.07
236 C57 C58 1964.76 1965.24 0.48 26.56 1.81 23.90 1964.16 1964.64 0.6 0.6 200 23.90 0.018 1.74 0.09
237 C58 C59 1965.24 1966.54 1.30 17.89 7.27 23.90 1964.64 1965.94 0.6 0.6 200 23.90 0.073 2.89 0.06
238 C59 B179 1966.54 1976.58 10.04 83.20 12.07 23.90 1965.94 1973.58 0.6 3.0 200 23.90 0.092 3.09 0.06
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 13
239 B179 B180 1976.58 1975.82 0.76 17.10 4.44 23.90 1973.58 1974.61 3.0 1.2 200 23.90 0.060 2.70 0.07
240 B180 B181 1975.82 1981.89 6.07 30.07 20.19 23.90 1974.61 1980.69 1.2 1.2 200 23.90 0.202 4.16 0.05
241 B181 B182 1981.89 1983.97 2.08 17.29 12.03 23.90 1980.69 1982.77 1.2 1.2 200 23.90 0.120 3.46 0.05
242 B182 B183 1983.97 1985.71 1.74 24.75 7.03 23.90 1982.77 1984.51 1.2 1.2 200 23.90 0.070 2.85 0.06
243 B183 B184 1985.71 1987.92 2.21 30.09 7.34 23.90 1984.51 1986.72 1.2 1.2 200 23.90 0.073 2.89 0.06
244 B184 B185 1987.92 1989.94 2.02 26.29 7.68 23.90 1986.72 1988.74 1.2 1.2 200 23.90 0.077 2.95 0.06
245 B185 B186 1989.94 1993.23 3.29 42.18 7.80 23.90 1988.74 1992.03 1.2 1.2 200 23.90 0.078 2.96 0.06
246 B186 B187 1993.23 1994.93 1.70 34.81 4.88 23.90 1992.03 1993.73 1.2 1.2 200 23.90 0.049 2.51 0.07
247 B187 B188 1994.93 2000.18 5.25 77.98 6.73 23.90 1993.73 1998.98 1.2 1.2 200 23.90 0.067 2.81 0.06
248 B188 B189 2000.18 2003.24 3.06 49.58 6.17 23.90 1998.98 2002.04 1.2 1.2 200 23.90 0.062 2.73 0.06
249 B189 B190 2003.24 2007.00 3.76 53.46 7.03 23.90 2002.04 2005.81 1.2 1.2 200 23.90 0.071 2.86 0.06
250 B190 B191 2007.00 2010.63 3.63 47.14 7.70 23.90 2005.81 2009.44 1.2 1.2 200 23.90 0.077 2.95 0.06
251 B191 B192 2010.63 2012.72 2.09 32.58 6.41 23.90 2009.44 2011.52 1.2 1.2 200 23.90 0.064 2.76 0.06
252 B192 B193 2012.72 2017.21 4.49 76.59 5.86 23.90 2011.52 2016.01 1.2 1.2 200 23.90 0.059 2.68 0.07
253 B193 B194 2017.21 2018.80 1.59 33.67 4.72 23.90 2016.01 2017.59 1.2 1.2 200 23.90 0.047 2.47 0.07
254 B194 B195 2018.80 2020.32 1.52 56.26 2.70 23.90 2017.59 2019.12 1.2 1.2 200 23.90 0.027 2.02 0.08
255 B195 B196 2020.32 2022.69 2.37 40.96 5.79 23.90 2019.12 2021.49 1.2 1.2 200 23.90 0.058 2.66 0.07
256 B196 B197 2022.69 2026.55 3.86 31.82 12.13 23.90 2021.49 2025.35 1.2 1.2 200 23.90 0.121 3.47 0.05
257 B197 B198 2026.55 2027.40 0.85 17.79 4.78 23.90 2025.35 2026.2 1.2 1.2 200 23.90 0.048 2.49 0.07
258 B198 B199 2027.40 2028.89 1.49 22.46 6.63 23.90 2026.20 2027.7 1.2 1.2 200 23.90 0.067 2.81 0.06
259 B199 B200 2028.89 2029.77 0.88 19.31 4.56 23.90 2027.70 2028.57 1.2 1.2 200 23.90 0.045 2.43 0.07
260 B200 B201 2029.77 2030.20 0.43 7.17 6.00 23.90 2028.57 2029 1.2 1.2 200 23.90 0.060 2.70 0.07
CLCULO HIDRULICO DE COLECTOR PRIMARIO

BUZON COTA DE TERRENO BUZONES COLECTOR

DESCARGA S
COTA COTA DIF. PEND. COTA PROF.
D Q
Razante
V Tir. (Y)
TRAMOS TOTAL (l/s) COTA PROF.
DEL AL TERREN TERREN COTAS LONG TERRENO (8) FONDO BUZON
FONDO BUZON
(1) (2) O INICIO O FINAL (m) (m) (6) (%) INICIO LLEGADA mm. l/s m/m m/s m.
FINAL (10) INICIO (11)
(3) (4) (5) (7) (9) (12) (13) (14) (15) (16) (17)

VER PLANO AL - 14
261 B201 B202 2030.20 2033.38 3.18 36.70 8.66 23.90 2029.00 2032.18 1.2 1.2 200 23.90 0.087 3.08 0.06
262 B202 B203 2033.38 2039.77 6.39 90.60 7.05 23.90 2032.18 2038.57 1.2 1.2 200 23.90 0.071 2.86 0.06
263 B203 B204 2039.77 2043.96 4.19 29.25 14.32 23.90 2038.57 2042.76 1.2 1.2 200 23.90 0.143 3.68 0.05
264 B204 B205 2043.96 2048.15 4.19 45.35 9.24 23.90 2042.76 2046.95 1.2 1.2 200 23.90 0.092 3.14 0.06
265 B205 B206 2048.15 2050.20 2.05 23.30 8.80 23.90 2046.95 2049 1.2 1.2 200 23.90 0.088 3.09 0.06
266 B206 B207 2050.20 2052.62 2.42 34.30 7.06 23.90 2049.00 2051.42 1.2 1.2 200 23.90 0.071 2.86 0.06
267 B207 B208 2052.62 2054.12 1.50 24.25 6.19 23.90 2051.42 2052.92 1.2 1.2 200 23.90 0.062 2.73 0.06
268 B208 B209 2054.12 2059.32 5.20 85.68 6.07 23.90 2052.92 2058.12 1.2 1.2 200 23.90 0.061 2.71 0.06
269 B209 B210 2059.32 2062.22 2.90 35.54 8.16 23.90 2058.12 2061.02 1.2 1.2 200 23.90 0.082 3.02 0.06
270 B210 B211 2062.22 2068.42 6.20 54.51 11.37 23.90 2061.02 2067.22 1.2 1.2 200 23.90 0.114 3.39 0.06
271 B211 B212 2068.42 2073.42 5.00 63.10 7.92 23.90 2067.22 2072.22 1.2 1.2 200 23.90 0.079 2.98 0.06
272 B212 B213 2073.42 2076.53 3.11 46.70 6.66 23.90 2072.22 2075.33 1.2 1.2 200 23.90 0.067 2.81 0.06
273 B213 B214 2076.53 2079.38 2.85 50.20 5.68 23.90 2075.33 2078.18 1.2 1.2 200 23.90 0.057 2.65 0.07
274 B214 B215 2079.38 2084.98 5.60 77.60 7.22 23.90 2078.18 2083.78 1.2 1.2 200 23.90 0.072 2.88 0.06
275 B215 B216 2084.98 2088.41 3.43 42.40 8.09 23.90 2083.78 2087.21 1.2 1.2 200 23.90 0.081 3.00 0.06
276 B216 B217 2088.41 2092.55 4.14 40.00 10.35 23.90 2087.21 2091.35 1.2 1.2 200 23.90 0.103 3.27 0.06
277 B217 B218 2092.55 2098.19 5.64 54.35 10.38 23.90 2091.35 2096.99 1.2 1.2 200 23.90 0.104 3.28 0.06
VER PLANO AL - 15
278 B218 B219 2098.19 2100.84 2.65 35.88 7.39 23.90 2096.99 2099.64 0.0 1.2 200 23.90 0.074 2.91 0.06
279 B219 B220 2100.84 2103.80 2.96 34.49 8.58 23.90 2099.64 2102.6 1.2 1.2 200 23.90 0.086 3.07 0.59
280 B220 B221 2103.80 2106.56 2.76 35.58 7.76 23.90 2102.60 2105.36 1.2 1.2 200 23.90 0.078 2.96 0.06
281 B221 B222 2106.56 2111.64 5.08 68.44 7.42 23.90 2105.36 2110.44 1.2 1.2 200 23.90 0.074 2.91 0.06
282 B222 B223 2111.64 2117.69 6.05 60.73 9.96 23.90 2110.44 2116.49 1.2 1.2 200 23.90 0.100 3.24 0.06
283 B223 B224 2117.69 2124.04 6.35 61.45 10.33 23.90 2116.49 2122.84 1.2 1.2 200 23.90 0.103 3.27 0.06
284 B224 B225 2124.04 2127.30 3.26 35.47 9.19 23.90 2122.84 2126.10 1.2 1.2 200 23.90 0.092 3.14 0.06
285 B225 B226 2127.30 2130.15 2.85 25.83 11.03 23.90 2126.10 2128.95 1.2 1.2 200 23.90 0.110 3.35 0.06
286 B226 BE1 2130.15 2138.5 8.35 100.02 8.35 23.90 2128.95 2135.90 1.2 2.6 200 23.90 0.069 2.83 0.06

Datos Considerados:

(*) Explicacin de columnas de clculo:

(1) = Buzn Superior


(2) = Buzn Inferior
(3) = Cota Terreno del Buzn Superior
(4) = Cota Terreno del Buzn Inferior
(5) = Diferencia de Cotas : (1) -(4)
metrado de buzones:
(por rangos)

Buzon tipo I fc=175 kg/cm2 Prof. 1.20-1.50 m 102


Buzon tipo I fc=175 kg/cm2 Prof. 1.51-1.75 m 5
Buzon tipo I fc=175 kg/cm2 Prof. 1.76-2.00 m 7
Buzon tipo I fc=175 kg/cm2 Prof. 2.01-2.50 m 4
Buzon tipo I fc=175 kg/cm2 Prof. 2.51-3.00 m 8
Buzon tipo II fc=175 kg/cm2 Prof. 3.01-3.50 m 0
Buzon tipo II fc=175 kg/cm2 Prof. 4.01-4.50 m 2
Buzon tipo II fc=175 kg/cm2 Prof. 4.51-5,00 m 1

TOTAL 129