Sie sind auf Seite 1von 2

CM CHECKLIST

Doc No- SL/ARCI/SCL-37 REV - 0 SUBSTATION CPP Contract Ref- PL20140144 dtd.22.01.2014

Battery Charger & Battery Bank Month:


SI

10

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
ACTIVITY

11
1
2
3
4
5
6
7
8
9
No
Check whether Voltmeter and Ammeter
1
showing proper value.
Check whether all Indication lamps are
2
working.
Ensure the selector switch position in
3
Battery charger panel is in AUTO mode.
Check whether light fittings in battery
4
charger room working.
5 Ensure Exhaust fan is working.
Check Earthing connection of the panel and
6
battery stand.
Ensure Both Battery Charger panel and
7
Battery Bank are clean.
Note if any fault or tripping or damage in
8
Battery charger panel /Battery bank
Record of any activity that happened nearby
9
or above the panel.
Do Physical check up and check for any
10
(Abnormal Noise/Smell and temperature)

Checked by (Siemens) Name & Sign

Name & Sign (Shift Engg.)

Industrial Solutions & Services Page 1 of 2