Method Statement:
WRAPPING OF UNDERGROUND PIPES

Project Discipline Issuing Company


Document Type Document N Rev
Code Code
PWTP2
IC PR CON 042 A
DESIGN & CONSTRUCTION OF
PUTATAN WATER TREATMENT PLANT 2

Table of Contents
1. METHOD STATEMENT ................................................................... 3

2. REFERENCE DOCUMENTS ............................................................. 3

3. MANPOWER REQUIREMENT ......................................................... 3

4. EQUIPMENT REQUIREMENT ......... ERROR! BOOKMARK NOT DEFINED.

5. MATERIALS REQUIREMENT .......................................................... 4

6. SITE PREPARATION ..................... ERROR! BOOKMARK NOT DEFINED.

7. SURFACE PREPARATION .............. ERROR! BOOKMARK NOT DEFINED.

8. SEALER AND WATERPROOFING ... ERROR! BOOKMARK NOT DEFINED.

9. PRIMER COATING ........................ ERROR! BOOKMARK NOT DEFINED.

10. TOP COATING AND TANK LINING ERROR! BOOKMARK NOT DEFINED.

11. SCHEDULE OF APPLICATION ........ ERROR! BOOKMARK NOT DEFINED.

12. ROUTINE TEST ............................. ERROR! BOOKMARK NOT DEFINED.

13. TANK LINING ACCEPTANCE.......... ERROR! BOOKMARK NOT DEFINED.

7.1 TEST SAMPLE PREPARATION ....... ERROR! BOOKMARK NOT DEFINED.

7.2 TEST PROCEDURE ........................ ERROR! BOOKMARK NOT DEFINED.

7.3 INTERPRETATION OF RESULTS .... ERROR! BOOKMARK NOT DEFINED.

7.4 TYPE OF FAILURE ......................... ERROR! BOOKMARK NOT DEFINED.

7.5 MODE OF FAILURE ....................... ERROR! BOOKMARK NOT DEFINED.

7.6 ACCEPTANCE CRITERIA ............... ERROR! BOOKMARK NOT DEFINED.

14. SAFETY ........................................ ERROR! BOOKMARK NOT DEFINED.

8.1 SAFE WORK PRACTICE ................. ERROR! BOOKMARK NOT DEFINED.

8.2 HAZAED IDENTIFICATION AND RISK ASSESSMENT CONTROL


ERROR! BOOKMARK NOT DEFINED.

8.3 PPE REQUIREMENT ...................... ERROR! BOOKMARK NOT DEFINED.

15. TESTING INSTRUMENT CALIBRATIONERROR! BOOKMARK NOT


DEFINED.

16. CONFINED SPACE EMERGENCY RESCUE PROTOCOL ............ ERROR!


BOOKMARK NOT DEFINED.
DESIGN & CONSTRUCTION OF
PUTATAN WATER TREATMENT PLANT 2

17. MULTI-GAS CALIBRATION REPORTERROR! BOOKMARK NOT


DEFINED.

DCPWTP-2
MS-040 2
DESIGN & CONSTRUCTION OF
PUTATAN WATER TREATMENT PLANT 2

1. METHOD STATEMENT

This document aims to describe the method to be adopted in protecting


the underground pipelines by the process of wrapping.

In addition, this method statement also covers and defines the material
specifications, method of cleaning, wrapping, testing, handling and
storing, etc., required for the satisfactory completion of the job.

2. PURPOSE

To provide added protection for bolt and nuts and flat washers aside
from currently approved hot dip galvanized bolts and nuts.

3. REFERENCE DOCUMENTS

1. PWTP2-QA-CR-CON-ARU-0167 SEALBOND Tank Lining System


2. PWTP2-IC-PR-CON-0034 Rectification of Structural Defects in
Concrete Structures
3. ASTM D4258 Standard Practice for Surface Cleaning Concrete for
Coating
4. PWTP2-SS-PN-CON-0001 Health, Safety and Environment Plan

4. MANPOWER REQUIREMENT

The following personnel shall be required before proceeding with the


preparatory and coating works except for the technician who will
conduct the testing for the acceptance of the tank lining.
1 Project Engineer
2 QC Engineer - Mechanical
8 Skilled Labor
4 Unskilled Labor

DCPWTP-2
MS-040 3
DESIGN & CONSTRUCTION OF
PUTATAN WATER TREATMENT PLANT 2

5. MATERIALS REQUIREMENT

The following materials shall be on site before proceeding with the


preparatory and coating works except for testing apparatus.
1 PVC Tape, 3 width
2 Polyethylene Sheet, 6 mils
3 Standard PPE

6. PROCEDURE

Wrap the recently installed flange with bolts and nuts with double
wrapped of polyethylene sheet.

After wrapping the flange bolt, nuts and washer, seal both ends of the
polyethylene sheet including the horizontal end with PVC tape, as
shown in Drawing 1. The tape shall be three wraps at both ends and
one wrap at horizontal end.

DCPWTP-2
MS-040 4