considered during and after construction when specifying paint for field application?
Have special insulation applications been identified and appropriately schedule?
How are extras approved?
How are extras calculated?
How does the painting scope cover touch up and damage by other contractors?
How is contract defined with regard to schedule and congestion at any given time, is
this clear in the contract?
If multiple coats of primer are used, is each coat verified for correct surface conditions
and compatibility with prior and subsequent coats of paint?
Is actual thickness documented?
Is agency inspection completed?
Is air supply clean and free of moisture and oil?
Is ambient temperature during installation within specifications?
Is anchor profile as specified?
Is block filler required for painting of block?
Is chloride detection test satisfactory?
Is cleanliness of and dryness of abrasives satisfactory?
Is coating by approved manufacturer?
Is coating system cured per specification?
Is coating thickness verified per schedule after each coat of paint?
Is color schedule complete and understood?
Is contract lump sum, unit price or time and material?
Is contractor approval of MSDS for paint, solvent/blasting obtained prior to work?
Is contractor approval received of coatings materials prior to start of work?
Is dry film thickness of finished paint systems verified and documented?
Is drying times between coats clearly identified?
Is dust and spent grit removed after blasting?
Is dust control maintained per specification?
Is each application verified for the required number of coats?
Is each coat of paint dried and cured prior to application of subsequent coats?
Is each coat of paint uniformly and completely applied over entire surface and free of
defects?
Is electric trim plate used to verify outlet boxes?
Is final coat of paint applied after intermediate coats have been approved?
Is final inspection of paint complete?
Is finished coat acceptable?
Is finished coat of paint defect-free and uniform in appearance?
Is label information correct?
Is moisture tested prior to and after and at required intervals?
Is oil-grease removed prior to blasting?
Is opacity being achieved, per specification?
Is paint mixed, thinned, and applied in accordance with manufacturers specification?
Is paint schedule checked very carefully for access of painters?
Is prime coat applied uniformly and receives proper curing time?
Is primer in accordance with specification?
Is project adhering to a no painting during rain, wind, fog, or mist policy?
Is project using manufacturer's standard finish where possible?
Is protection of adjacent areas, surfaces, and items completed prior to painting?
Is relative humidity acceptable?
Is sandblasting needed?
Is soil sterilization installed where required?
Is spray painting owed?
Is storage area for painting materials well ventilated?
Is surface dry and free from condensation?
Is surface preparation verified per project specifications?
Is surface protection in place for opening, vents, shafts, etc?
Is temperature/dew point of storage per manufacturers instructions?
Is texture and method of application - spray, brush, roller, etc - verified as correct?
Is there a protection program for Teflon surfaces during construction and painting
operations?
Is there an inspection program, if inorganic zinc primer is specified, to inspect and
verify the application of this material?
Is tinting of undercoats performed per specification?
Is tinting used between first and second coat?
Is total DFT within the specified range?
Is wet film paint thickness taken if required?
Is workmanship and application acceptable?
Prior to painting anything, is a release to apply coatings approval form completed and
approved?
Verify that materials are per specification and are products of the same manufacturer?
Verify that paint materials are furnished by same manufacturer and approved by
[Client]?
What areas are painted prior to equipment installation?
What equipment does contractor supply?
Whats the drying time for materials prior to painting?
When is painting done, during the week, night times or weekends?
Who approves proper millage or thickness of paint?