Sie sind auf Seite 1von 1

Case 1: Alma Electronics

Knowledge in electronics is very important in an electronics assembly plant. The best way to
learn about electronics is by enrolling to an engineering course.
Ther i g h t c o u r s e s f o r M r . M a l l a r i s s o n s a r e ! a c h e l o r o f " c i e n c e i
n E l e c t r o n i c s Engineering# !achelor of "cience in Electrical Engineering# and !achelor
of "ciencein $ndustrial Engineering. %ne course for each of his sons. His son that
will be an electronics engineer will have Knowledge regarding the parts that are produced
and assembled in the plant. The other son that will be an electrical engineer will
also have knowledge about electronics. The one that will be an industrial engineer will be
responsible for the (uality and improvement of the processes involved in
theplant.

Case ): R.E. Construction

Engineer Estabillo s doubt about his ability was a good thing. $f he did
notapprehend his situation and pushed through with his plan to hire more employees#then
soon he may have been overwhelmed by duties he cannot handle alone. &ehas
two choices: either he learn more about management or hire someone that canhelp him
manage or supervise. My advice for Mr. Estabillo would be to do both.
&es h o u l d t a ' e t h e o p p o r t u n i t y o f h i s + r m t o g r o w . " i n c e t h e n e e d
f o r b e t t e r management is urgent# he should hire someone to help him in the
managementresponsibilities. At the same time# he can further study about management
to dealwith future e,pansion of his +rm.

Case -: Motorbus Company

The ob of Engr. Ancheta as the new manager is to ma'e the operations in themaintenance department as
effecient and effective as possible. The old method of purchasing which causes delays in the delivery of needed
parts is the root cause of their problem. The previous manager# Engr. Inductivo# was not able to provide a
solution so he resigned. Now# I think what Engr. Ancheta must do is to make achange in their purchasing and
delivery method. Saving the information regarding the parts used and the frequency of its replacement he should
make a list of theseparts and estimate the minimum number to be purchased so that parts would be ust enough
and not over stocked. So when a part needs replacement it can be taken from the storage room without waiting
for the approval of the purchase request. Also within a month# the number of buses will be doubled. Maintenance
units should also be increased proportional to the number of buses available

Das könnte Ihnen auch gefallen