ITEM NO: ACTIVITY DESCRIPTION START DATE FINISH DATE DAYS INDRCT DRCT

1 PRELIMINARIES
1.1 CONTRACT AWARD 01/Nov/17 01/Nov/17 1 0 0
1.2 KICK OF MEETING 02/Nov/17 02/Nov/17 1 0 0
DOCUMENTATION & DESIGN OF
2 DRAWINGS/APPROVA
2.1 SITE SURVEY & PLANNING 03/Nov/17 04/Nov/17 2 3
PREPARATION OF PROJECT
2.2 05/Nov/17 05/Nov/17 1 3
SHEDULE
2.2 DRAWING PREPARATION 06/Nov/17 06/Nov/17 1 5

2.3 QA/QC, HSE DOCUMENT 07/Nov/17 07/Nov/17 1 7


PREPARATION
DOCUMENT
2.4 SUBMISSION,VERIFICATION 08/Nov/17 08/Nov/17 1 7
& APPROVAL

3 PROCURMENT & MOBLIZATION

3.1 RFQ/PURCHASE ORDER 09/Nov/17 09/Nov/17 1 9


DELIVERY AND INSPECTION
3.2 OF MATERIALS, SHIFTING TO 10/Nov/17 10/Nov/17 1 9 3
THE STORE
MOBLIZATION OF MAN &
3.3 11/Nov/17 11/Nov/17 1 9 4
MACHINE POWER
4 CIVIL WORK
4.1 GROUND LEVELLING 12/Nov/17 12/Nov/17 1 8 6
MOBLIZATION OF MAN POWER
4.2 13/Nov/17 13/Nov/17 1 9 6
AND EQUIPMENT
TRANCHING AND FOUNDATION
4.3 14/Nov/17 14/Nov/17 2 9 7
LAYING
4.4 CONCRETE BELTING 16/Nov/17 16/Nov/17 1 8 8
BRICK WALLING AND DOOR
4.5 17/Nov/17 20/Nov/17 4 8 8
WAY STEPS
4.6 HINTED BEAM 21/Nov/17 21/Nov/17 2 8 8
4.7 TOP BRICK WALLING 23/Nov/17 24/Nov/17 2 8 9
4.8 ROOF CONCRETING 25/Nov/17 25/Nov/17 0 0 0
4.9 SHUTTER INSTALLATION 25/Nov/17 25/Nov/17 1 7 11
4.91 PLASTERING 25/Nov/17 25/Nov/17
FLOOR AND MOTOR PLATFORM
4.92 25/Nov/17 25/Nov/17
INSTALLATION
4.93 VENTILATION 25/Nov/17 25/Nov/17 1 7 12

5 FABRICATION OF PIPE SPOOLS

CONSTRUCTION OF TEMP
5.1 26/Nov/17 26/Nov/17 1 7 12
FAB.SHOP
5.2 SAND BLASTING & PAINTING 27/Nov/17
TOTAL TOTAL HRS WEIGHT
(%)

0 0
0 0

3 48

3 24

5 40

7 56 ###

7 56 ###

0 0

9 72 ###

12 96 ###

13 104 ###

0 0 ###
14 112 ###

15 120

16 256 ###

16 128 ###

16 512 ###

16 256
17 272 ###
0 0 ###
18 144 ###
0 0 ###

0 0 ###

19 152 ###

0 0 ###

19 152 ###
0 0 ###
0 0 ###
###
###

###