Sie sind auf Seite 1von 35

F871 1200/1A 66KV/110V

Differential Id> Max 2.5*Ic +0.1*FLC or


Id> switch on Max 6*Ic or
Id>> 1.2*FLC
Id>> switch on 2*Id>>

Distance Zone-1 70%


Zone-1B 150%
Zone-2 150%
Zone-3 200%

Overcurrent I> 110% 1.1*FLC


Ip 150% 1.5*FLC
TMS 1
IEC Curve

Thermal Overload Alarm K-factor Max. current in primary


Time constant
Th. AL stage
Current Al Set pt 1050/1200

Common:
Distance Measurement unit KM 251 K_alf/K_alf nominal 1.5
Zero seq. RE/RL n XE/XL 253 K_alf/K_alf nominal error 3%
Inrush OFF 254 K_alf nominal CT error 10%
Inst. Trip after SOTF with Zone1B 1150A Seal in Time Man. Closure 0.3s
Zone Z1 blocked by diff active. Yes 1140A CT saturation Threshold 20A
Power Swing (All Zones ) Blocked
Power Swing Trip NO
KM (Sec) Differntial
30% of FLC 0.3 Main-1 TC-1 86-1
2*Id> 0.6
1.05 Main-2 TC-2 86-2
2.1
Time Distance
70% 0 Main-1 TC-1 86-1 Intertrip Send
150% 0
150% 0.4 Main-2 TC-2 86-2 Intertrip Send
200% 0.5
Back up O/C
0.96 NCC alarm only
1.31 Main-1 TC-1 86-1 Intertrip Send
1
NI Main-2 TC-2 86-2 Intertrip Send

1305.6/1050 1.09 Thermal


10 min Main-1 NCC alarm only
100%
0.88 Main-2 NCC alarm only
BUSBAR PROTECTION
BB protection TC-1 TC-2
1.5 BF stage-1 TC-1 TC-2
3% BF stage-2 86 BBP Intertrip Send Main-1 & Main-2
10% End Fault TC-1 TC-2
0.3s MASTER TRIP RELAY
20A 86-1 TC-1 TC-2 CB CLOSE BLOCK
86-2 TC-1 TC-2 CB CLOSE BLOCK
86 BBp TC-1 TC-2 CB CLOSE BLOCK
TRIP CIRCUIT RELAY
TC-1 FAULTY CB CLOSE BLOCK
TC-2 FAULTY CB CLOSE BLOCK

INTERTRIP RECEIVE
MAIN-1 86-1

MAIN-2 86-2

86 BBP Intertrip Send Main-1 & Main-2

trip Send Main-1 & Main-2


Intertrip Send Main-1 & Main-2

LOSE BLOCK INITIATE BF


LOSE BLOCK INITIATE BF
LOSE BLOCK INITIATE BF
7UT613 400/1 A 2500/1A
FLC 349.9 0.87475 2099.5 0.8398
Differential I> 0.2+(0.5*Kctr) 0.2+(0.5*0.2)
Kctr= Voltage variation i.e; 20
I>> 1/17.22% 5.8072009292 *1.3=

Slope 1 1.2*Kctr 0.24


Base point for slope 1
slope 2
Base point for slope 2
Pick for Add on stabilization

Duration of Add on stabilization


2nd haromonics
%th harmonics
Thermal Overload Alarm K-factor Max. current in primary 2309.5/2099
Time constant
Th. AL stage
Current Al Set pt
7SJ61
50-1 OLTC Block 130% of FLC
50-2 110% full load alarm
Back UP DMT 50-3 1.3*through fault current/ct ratio 1.3*2031.99/400
Back UP IDMT 51 150% of FLC
TSM
Curve

REF HV 50-1ph FLC 40% 0.3499


Time Delay
Differntial
0.3 Main-1 TC-1 86-1

7.549361 7.5
BUSBAR PROTECTION
0.25 (minimem slope setting) BB protection TC-1
0 BF stage-1 TC-1
0.5 BF stage-2 86 BBP
2.5
4 (I/Ino) MASTER TRIP RELAY
86-1 TC-1 TC-2
15 cycles 86-2 TC-1 TC-2
10% 5 cycle 86 BBp TC-1 TC-2
25% 5 cycle
1.1 TRIP CIRCUIT RELAY
1.2 TC-1 FAULTY CB CLOSE BLOCK
90% TC-2 FAULTY CB CLOSE BLOCK
1
Current Time
1.14 oo TAP CHANGE BLOCK
0.96 oo To NCC ALARM TO NCC
1.3*2031.99/400 6.6 0.1 TC-2
1.31 TC-2
0.42 Transformer can withstand its through fault current for 2 sec.
VI

0.35 TC-2
0.4 sec
LV TRIP COIL

TC-2 86 BBP
TC-2
86 BBP

LV TRIP COIL CB CLOSE BLOCK(HV&lv) INITIATE BF(HV & LV)


LV TRIP COIL CB CLOSE BLOCK(HV&lv) INITIATE BF(HV & LV)
LV TRIP COIL CB CLOSE BLOCK(HV&lv) INITIATE BF(HV & LV)

CB CLOSE BLOCK
CB CLOSE BLOCK

TAP CHANGE BLOCK


ALARM TO NCC
86-2 LV TRIP COIL
86-2 LV TRIP COIL

86-2 LV TRIP COIL


66KV BUSBAR 2000/1A

7SS522
Bus Bar Protection
Bus ZONE BZ 0.7
Diff Curr. Threshold 1

Check ZONE CZ 0.6


Diff Curr. Threshold 1

Breaker Failure

Current threshold for breaker failure 0.1 I/In

Time Delay for trip repeat (stage-1) 0.05 Sec

Time Delay for 50-BF(Stage-2) 0.13 Sec

stablizing factor for BF protection 0.5

End fault protection shall be ON in Outgoing feeder.


7SJ611 2000/1A

O/C O/C
51 Pickup 1.25 TC-1 TC-2 86-1
Time Dial 0.2 Sec
Curve NI BUSBAR PROTECTION
BB protection TC-1
BF stage-1 TC-1
BF stage-2 86 BBP

MASTER TRIP RELAY


86-1 TC-1 TC-2
86-2 TC-1 TC-2
86 BBP.A TC-1 TC-2
86 BBP.A TC-1 TC-2

TRIP CIRCUIT RELAY


TC-1 FAULTY CB CLOSE BLOCK
TC-2 FAULTY CB CLOSE BLOCK
86-2

TC-2 86 BBP
TC-2

CB CLOSE BLOCK INITIATE BF


CB CLOSE BLOCK INITIATE BF
CB CLOSE BLOCK INITIATE BF
CB CLOSE BLOCK INITIATE BF

CB CLOSE BLOCK
CB CLOSE BLOCK
7SJ62 11kV 2500/1A
F671 FLC 2099.517 In sec 0.839807

Back up O/C O/C STAGE-1


51 Stage 1 FLC 150% 1.26 A12-86
TMS 0.26
Curve NI
Reverse Flow Trip DIRECTIONAL
67-TOC FLC 50% 0.42 HV TC-2 LV TC LV 86
TMS 0.1
Curve NI

BF FLC 160% 1.34


Time delay 0.3 sec
stage 2 time oo

7SJ611 SBEF 750/1A


F511
SBEF pick up current is 300 A
IN secondary 0.4
SBEF-STAGE-1
Stage-1 50 Ns-1 Trip to Bus section 0.4 A12-86
Time delay 3.5 sec
SBEF-STAGE-2
Stage-2 50 Ns-2 Trip to Trafo Incomer 0.4
Time delay 4.5 sec

10% alarm to DGCC 50 1ph-1 0.1


Time delay oo
7SJ611 87NL 2500/1A
F871 FLC 2099.517 In sec 0.8398068

REF LV 50-1ph FLC 12% 0.1007768 0.1


Time Delay 0.0 Sec

Back up O/C
51 Stage 2 FLC 150% 1.26
TMS 0.42
Curve VI

BACK UP o/c
Current setting Is same but the time dial was selected differently to trip the stage-1 first.
SBEF-STAGE-1

MASTER TRIP RELAY


SBEF-STAGE-2 HV TC-2 LV TC LV 86 HV TC-1&2 LV TC LV 86 CB CLOSE BLOCK(HV&LV)
INITIATE BF 66KV & INITIATE BR FOR F671
TRIP CIRCUIT RELAY
TC FAULTY LV CB CLOSE BLOCK 11KV BBP
HV TC-1&2 LV TC LV 86 CB CLOSE BLOCK(HV&LV)
INITIATE BF 66KV & INITIATE BR FOR F671
REF
HV TC-2 LV TC LV 86

O/C STAGE-2
HV TC-1&2 LV TC LV 86

for any fault current

CB CLOSE BLOCK(HV&LV)

CB CLOSE BLOCK(HV&LV)
7SJ621 2500/1 A
O/C function should be switched off after final setting O/C
50-1 1 Only to SCS
Time 0.5
50-2 2
Time 0 11kv BBP operated From Zone-1 0r Zo
51 1 CB Trip Coil CB close Block
TMS 0.5
Curve NI BF intiation from O/G feeders
Initiate BF in F511 in A12
Breaker Failure
BF Trip
50 BF Pickup current threshold 1 A12 86
Trip-Timer 0.3 sec
Master Trip Relay
Initiate Bf in A18/A38/A28/A48

O/C stage-1 from A18 & A28


Master trip Relay

SBEF Stage-1 feo A18 and A28


Master Trip Relay
erated From Zone-1 0r Zone-2
CB close Block Initiate bf in F671 A18 & A28 Initiate BF in F511 in A12

rom O/G feeders


F511 in A12

A18/A38/A28/A48 CB Trip Coil CB Close Block

rom A18 & A28

feo A18 and A28


Back Up Over current

7SJ61 150/1A
FLC 52.48793 A
CT Sec 0.35

50 I> 110% alarm FlC*1.1 0.38


Time Delay oo
50 Ip 150% of FLC 0.52
TMS 0.8
Curve VI

50 I>> High set 1.3*Through fault current/CT ratio 7.91


Time delay 0.15

50N/51N 50N 40% of FLC 0.14


As per KM comments, it is 0.15
Time delay 0.2

Harmonic restraint 2nd Harmonic 10%


Cross block time 0.1
Maximum current for inrush restaint 2.6A

7SJ611 87NL 1500/1A


FLC 1391.25 In sec 0.93

REF LV 50-1ph FLC 20% 0.19


Time Delay
11KV BBP Operated
CB Close Block
CB Trip Coil
LV CB Trip Coil
O/C
(TMS setting was based on thermal ) Master Trip Relay 415V LV CB Protection Operated
damage curve of Transformer) A10 Master Trip Relay

O/C Mechanical Protection


Sec Master Trip Relay Bucholz
PRV
OTI
E/F WTI
Master Trip Relay
Sec

Master Trip Relay


Sec Initiate Bf in A12/A32 Initiate Bf in A18/A38/A28/A48
Max inrush=323 2.58 CB Close Block

TCS Relay faulty


CB Close Block

0.1 LV REF
0.0 Sec Master Trip Relay
11KV BBP Operated
CB Close Block
CB Trip Coil
LV CB Trip Coil

415V LV CB Protection Operated


A10 Master Trip Relay LV CB Trip Coil

Mechanical Protection
CB Trip Coil LV CB Trip Coil 86
CB Trip Coil LV CB Trip Coil 86
CB Trip Coil LV CB Trip Coil
CB Trip Coil LV CB Trip Coil

n A18/A38/A28/A48 CB Trip Coil


Cable Differential
Solkor N

O/C Relay 400/1A


7SJ802

O/C 51 In all KM network 1


TMS 0.4
Curve NI

E/F 51N In all KM network 0.3


TMS 0.4
Curve NI

Thermal Overload 49 K-Factor 0.85


Time constant 170 Min
49 Thermal Alarm stage 100%
Current overlaod Alarm set point 0.77 A

Guard Relay :
7SJ801
50-2 In all KM network 1
Time Delay 0

50N-2 In all KM network 0.2


Time Delay 0
O/C 50-1 In all KM network 4
Time Delay 0.05
Operates only with manual close signal SOTF

E/F 50N In all KM network 0.3


Time Delay 0.05
Operates only with manual close signal SOTF

Thermal
SCS Signal

Master Trip Relay & 11KV BBP operated


Initiate Bf in A12/A32 Initiate Bf in A18/A38/A28/A48
CB Close Block

TCS Relay faulty


sec CB Close Block

sec
Pilot wire
Master Trip Relay

O/C
Master Trip Relay

E/F
Master Trip Relay

CB Trip Coil
7SJ61
CT Details
System Voltage 11000 Primary 2500
Bus Rated KA 40000 Secondary 1
Knee poit vol of CT 750 Resistance 11
Imag of CT 7 CT lead resistance 0.317

For busbar tripping primary current 400 can be taken

50-1 0.16
Time delay 0.1 Sec

Setting for Busbar CT Super vision Relay 14V

Time Delay 3 sec

Busbar protection
K87Z1A K87Z1B K87Z1C K87Z1D K87Z1E
Zone-1
K87Z1A K87Z1B K87Z1C
Initiate BF in 66kv side Initiate BF in A12 A70 CB Trip Coil
B11 CB Trip coil-1 A12 CB Trip Coil Close Block for A70
B11 CB Trip coil-2 Close Block for A12 Trip relay operated A70
Close block for B11 Trip relay operated A12 Trip relay not operated A70
Close block for B11(BBP not) Trip relay not operated A12 A90 CB Trip Coil
Trip relay operated B11 A30 CB Trip Coil Close Block for A90
Initiate BF in A18 Close Block for A30 Trip relay operated A90
A18 CB Trip Coil Trip relay operated A30 Trip relay not operated A90
Close Block for A18 Trip relay not operated A30 A110 CB Trip Coil
Trip relay operated A18 A50 CB Trip Coil Close Block for A110
Trip relay not operated A18 Close Block for A50 Trip relay operated A110
Trip relay operated A50 Trip relay not operated A110
Trip relay not operated A50 A130 CB Trip Coil
Close Block for A130
Trip relay operated A130
Trip relay not operated A130
K87Z1D K87Z1E
A150 CB Trip Coil A10 CB Trip Coil
Close Block for A150 Close Block for A10
Trip relay operated A150 Trip relay operated A10
Trip relay not operated A150 Trip relay not operated A10
A170 CB Trip Coil A230 CB Trip Coil
Close Block for A170 Close Block for A230
Trip relay operated A170 Trip relay operated A230
Trip relay not operated A170 Trip relay not operated A230
A190 CB Trip Coil
Close Block for A190
Trip relay operated A190
Trip relay not operated A190
A210 CB Trip Coil
Close Block for A210
Trip relay operated A210
Trip relay not operated A210
7SJ621
UNDER FREQUENCY LOAD SHEDDING

Frequency setting
STAGE 1A 49.2
1 49
2 48.8
3 48.6
4 48.4

Time delay 100ms is come for all the stages


K94XX selected outgoing feeders CB Trip Coil
K94XX selected outgoing feeders CB Trip Coil
K94XX selected outgoing feeders CB Trip Coil
K94XX selected outgoing feeders CB Trip Coil
K94XX selected outgoing feeders CB Trip Coil
K94XX selected outgoing feeders CB Trip Coil
66 KV GIS
CT
VT
66kV GIS SF6 GAS FILLING & SF6 GAS QUALITY MEASUREMENT TEST
66kV GIS FUNCTIONAL & TIMING TEST FOR THREE POSITION SWITCHES & EARTH SWITCH
66kV GIS CIRCUIT BREAKER TEST REPORT
INDICATION CIRCUIT CHECKS TEST REPORT
MAIN BUS & RESERVE BUS CONTACT RESISTANCE TEST REPORT
HV AND PD MEASUREMENT TEST REPORT
CT Lead Resistance for HV and LV REF

66 KV LCC
ICT
Ammeter
Voltmeter
Control Relay KOA self reset
Under Voltage Relay
AC/DC Checks
Local Interlock
66KV Relay Panel
AC/DC Checks
DC Change over scheme checks
Master Trip Relay
Trip circuit supervision Relay component
All Relays and BCU component testing.
BI Verification for all Relays and BCU's.
VT Secondary Injection
Local synch check
CT Secondary Injection
CT Primary Injection
TRIP CIRCUIT SUPERVISION CHECKS TEST
TRIP COIL CURRENT MEASUREMENT TEST REPORT
TRIP LOGIC TEST
Final Setting for all the protection relays.

66KV Bus Bar


AC/DC Checks
DC Change over scheme checks
Busbar Trip Relay test report
BUSBAR PROTECTION RELAY (7SS52) TEST
Busar Trip Topology Test
Busbar Stability and Sensitivity.
11 KV SWGR

CT Testing
VT Testing
ICT Testing
Ammeter
Voltmeter
Undervoltage Relay
A/C, D/C checks
Circuit Breaker Test Report
Busbar CRM
Earth Bar CRM
Earth Switch CRM
CB HV Test
Busbar HV Test
PD Measurement
SWGR Mechanical Operations
A/C, D/C Checks
Local Interlock Check
11 KV RP

A/C, D/C checks


DC Change over scheme checks
Master Trip Relay
TCS Relay
Trip relay(Self Reset)
SolKOR-N Relay Component test
Pilot wire supervision relay receiving
Guard Relay
All Back up Relay Component Testing
Sigma relay Component testing
All BCU Testing
BI Verification
VT Secodary injection
Local Synch Check
CT Secondary injection
CT primary injection
TRIP CIRCUIT SUPERVISION CHECKS TEST
TRIP COIL CURRENT MEASUREMENT TEST REPORT
VOLTAGE SELECTION SCHEME CHECK
LOAD SHEDDING SCHEME CHECK
BREAKER FAILURE INITIATION SCHEME CHECKS
BREAKER FAILURE & BUSBAR TRIPPING SCHEME CHECKS
TRIP LOGIC TEST
Final Setting for all the protection relays.
11KV Busbar
1.BUSBAR TRIP RELAY TEST
2.CT SUPERVISION RELAY COMPONENT TEST
3.7SJ61(F87Z)RELAY COMPONENT TEST
4.AC,DC CHECKS TEST
5.DC CHANGEOVER SCHEME CHECKS TEST
6.7SJ61(F87Z)BI VERIFICATION TEST
7.BUSBAR SENSITIVITY CHECKS TEST
8.BUSBAR STABILITY CHECKS TEST
40 MVA Transformer
Visual Inspection and General Checks Tandelta Measurement
IR SFRA
OLTC Continuity test Bushing CT test
Measurement of Low voltage excitation current Mechanical Protn. BI Checks
Vector group RTCC Signal Checks
Magnetic Balance A/C, D/C- RTCC, OLTC, TCC
Short circuit impedance measurement RTCC Voltmeter
Zero sequence impedance measuremet RTCC Tapcon
Turns Ratio Transformer Stability
Magnetizing current
Winding resistance
OLTC Motor voltage and current measurement
OLTC functional test
Checking of cooling fans
Calibration of WTI & OTI
Hotspot gradient test by current injection
Mechanical protection device check upto TCC
NER
NER Test
Omicron Kit results for NER
NER CT Secondary Injection
NER A/C checks
NER 1 CT & BA-T1 NCT PRIMARY INJECTION TEST
Auxillary Transformer Test

IR AUX TR-1 TCC AC CHECKS


Winding Resistance NCT SECONDARY INJECTION TEST
Vector Group NCT PRIMARY INJECTION
Turns Ratio LV CABLE BOX MCCB TEST
Magnetizing Current STABILITY TEST
Magnetic Balance
Zero sequence impedance measuremet
Short circuit impedance measurement
Calibration of WTI & OTI
Temperature gradient test by current injection
Mechanical protection device check upto TCC
Complete CT testing
CTION TEST
LVAC LVDC

I/C, B/S & O/G CT Testing MCCB


MCCB AMMETER VOLTEMETR
CB UNDER/OVER VOLTAGE RELAY
AMMETER VOLTEMETR Batter Monitoring Relay Test
UNDER/OVER VOLTAGE RELAY BB CRM
BB CRM BB HV
BB HV A/C, D/C Checks
A/C, D/C Checks Momentary parelleling Test
Interlock & Functional checks Alarm Checks Test
CT Secondary injection Protection Tripping Test
CT primary injection
Visual Inspection checks

Baterry charger Test Report


UPS Test Report

Das könnte Ihnen auch gefallen