Below, find a sample construction schedule.

It is provided to give you an idea of what to


expect when building a new home.

Land/Lot Development
o Purchase
o Clear Title (if not already owned)
o Accessible to Modular Transporter (conduct site accessibility study)
conduct prior to purchase if not already owned
o Perk / Probe Test (or public sewer if available)
conduct prior to purchase if not already owned
o Land Surveyed (if not already owned)
Forms/Procedures/Permits
o Select Modular Home and Options
o Develop and Finalize Prints, Plans, Options, Finishes and Specs
o Contracts Signed
o Sign-Off on Plans and Specs
o Secure Financing
o Set Target Occupancy Date
o Issue Deposit
o Establish Construction Activities/Schedule
o Obtain and Post Permits
Building
Electrical
Plumbing
Mechanical
Road/Culvert
o Application for Gas/Electrical Service
o Site Survey (stake out)
Foundation and Sitework
o Order Steel Beams and Columns
o Deliver Dumpster and Port-a-Potty
o Site Preparation, Remove Obstacles
o Layout and Excavation
o Form Footings
o Pour Footings
o Footing Inspection
o Install Footing Drains and Basement Stone
o Install Under-Slab Utilities
o Block Delivery/Foundation Systems
o Construct/Install Foundation Walls
o Inspect Foundation Drains
o Apply Foundation Damp-Proofing and Vapor Barrier
o Install Anchor Clips/Bolts, Sill Plate and Sealer
o Install Sump Pump Crock and Rough Plumbing
o Install Basement Windows
o Install Foundation Drain Tile and Cover
o Prep Opening in Floor for Posts/Support Columns
o Pour Basement Floor
o Backfill
Site Preparation
o Foundations and Footings are Completed
o Foundation is Square and Level
o Foundation and Footings have passed Inspection
o Obstacles for Crane and Transporters have been Removed
o Access Route for Crane and Transporters is planned
o Crane Pad is Ready and Firm
o Set Crew and Crane Schedules are Confirmed
o Bulldozer and Operator Scheduled and Confirmed
o Utility Crews have been Scheduled for Turn-off / Turn-on (if applicable)
o Weather Forecast for Set Day looks Adequate
o Payment for Delivery Day Confirmed and Available
Modular Home Set
o Modules Delivered/Received
o Unwrap Modules
o Check Inventory of Ship-Loose Materials
o Mark Mating Lines on the Foundation
o Locate Pick-Points on the Modules, Prepare for Lifting
o Module Set
o Fasten and Check Module
o Prepare Mating Surfaces
o Prepare Wires, Pipes, Ducts and Stairs
o Posts/Support Columns Set/Installed
o Stairs to Basement Set/Installed
o Lift Jointed Roof Sections with Crane
o Lift Dormers and Other Roof Elements
o Make the Home Weather-Tight and Secure
o Sign Set-Release
Exterior Finishing
o Siding Completed
o Masonry Work Completed
o Prime, Paint or Stain Exterior Surfaces
o Install Shutters
o Install Chimney Stack
o Install Gutters and Downspouts
o Optional Garages Completed
o Optional Porches, Decks and Patios Completed
Interior Electrical
o Install Circuit Breaker Box
o Install Meter Box, Conduit Master, Service Entrance Cable & Basement Cable
o Connect Wiring of Modular Units and Tie-In to Junction Box
o Connect Service in Garage and Outbuildings if Applicable
o Install Sump Pump
o Install 220v Service for Range/Dryer
o Electrical Inspection
Plumbing Connections
o Drill/Install Well & Pump or Hook-Up to Public System
o Install/Inspect Septic and Drainage Systems or Hook-Up to Public Systems
o Install Shower Doors
o Install Supply and Drain Lines/Connect to Stubbing
o Install Gas Pipes to Range/Dryer/Water Heater if Applicable
o Check and Tighten Shut-Off Valves
o Plumbing Inspection
HVAC
o Install/Connect AC System
o Install Oil Tank and Line to Furnace if Applicable
o Install Electric Water Heater and Connect to Breaker Box
o Connect Chimney Flue Into Furnace
o For Baseboard Electrical Heat, Connect Circuits at Junction Box
o Vent Dryer
o Install Security System
o Connect Central Vac System
o Mechanical Inspection
Interior Finishing
o Finish/Patch Drywall
o Paint Interior Walls
o Finish Interior Trim and Doors/Adjust
o Install or Seam Vinyl, Hardwood, Laminate or Carpeting at Mate Walls
o Clean-Up
Exterior Final Finish
o Complete Garage Floors, Steps, Service Walks, etc.
o Install Exterior Lights and Bulbs
o Finish Grading
o Landscaping
o Garage Doors
o Exterior Clean-Up
Closing
o Punch List
o Final Clean-up - Remove Dumpsters & Port-a-Potty
o Walk Through with Customer
o Final Building Inspection
o Occupancy Permit
o Owner Occupancy