WO Date:19 Nov 2017

WO NO.:94545
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_23.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:ROOF_AC_4W.
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:ROOFTOP AC 4 WEEKLY MPM
Work Decription:ROOFTOP AC 4 WEEKLY PM

NOTE: THIS PM IS TO BE PERFORMED USING THE ELECTRONIC CHECKLIST. THE ROUTINE


CHECKLIST SHOULD BE FILLED IMMEDIATELY AFTER THE COMPLETION OF THE PM
CHECKLIST.

WEAR SUITABLE PBB AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

A. STRUCTURAL INSULATED DUCTING CHECK (TO BE CHECKED WHEN AC IS ON) 1. CHECK


INSULATION OF DUCTING (CONFIRM THERE ARE NO TORN DUCT TAPES ON THE DUCT) 2.
CHECK ALL INTERFACE SEALS BETWEEN DUCTING AND AC. ENSURE THERE ARE NO
LEAKS. 3. CHECK ALL INTERFACE SEALS BETWEEN DUCTING AND PBB. ENSURE THERE
ARE NO LEAKS. 4. ANY REPAIR TO THE SEALS SHOULD BE DONE WITH THE AC OFF

B. AC PERFORMANCE PARAMETERS CHECK: 1. CONNECT DUAL MANTOOTH AND MEASURE


THE FOLLOWING READINGS: 1.1 HIGH (DISCHARGE) PRESSURE USING YELLOW JACKET
MANTOOTH 1.2 LOW (SUCTION) PRESSURE USING YELLOW JACKET MANTOOTH 1.3
SUPERHEAT VALUE 1.4 DISCHARGE TEMPERATURE 1.5 SUCTION TEMPERATURE 1.6
CONDENSER OUTLET TEMPERATURE
C. AC ELECTRICAL PARAMETERS CHECK: 1. MEASURE VOLTAGE ACROSS PHASES 1, 2
AND 3 2. MEASURE CURRENT ACROSS PHASES 1, 2 AND 3 3. MEASURE COMPRESSOR
CURRENT ACROSS PHASES 1, 2 AND 3 4. MEASURE MAIN BLOWER MOTOR CURRENT
ACROSS PHASES 1, 2 AND 3 5. MEASURE CONDENSER FAN MOTOR CURRENT ACROSS
PHASES 1, 2 AND 3

D. EVAPORATOR AND CONDENSER CHECK: 1. REMOVE AIR FILTER AND CLEAN


ACCORDINGLY USING VACUUM (DO NOT USE HIGH PRESSURE) 2. USE THE LEAK
DETECTOR TO PERFORM A COMPLETE CHECK ON ALL FREON PIPING AND FIXTURES AND
WELD JOINTS STARTING FROM THE DISCHARGE SIDE OF THE COMPRESSOR AND ENDING
WITH THE SUCTION SIDE OF THE COMPRESSOR 2. REPORT IMMEDIATELY ANY LEAKS. 3.
COMB ANY BENDS IN THE EVAPORATOR AND CONDENSER FINS 4. CHECK THE DUST
LEVEL OF EVAPORATOR AND CONDENSER AND CLEAN WITH A LOW PRESSURE WATER
HOSE FROM THE INSIDE TO THE OUTSIDE (DO NOT USE HIGH PRESSURE)

E. BELT DRIVE CHECK: 1. CHECK BELT CONDITION FOR WEAR AND TEAR 2. CHECK PULLEY
CONDITION FOR WEAR AND TEAR (ENSURE ALL ALLEN BOLTS ARE PROPERLY
TIGHTENED) 3. CHECK V-BELT ALIGNMENT USING THE SKF LPA40 LASER ALIGNMENT
TOOL 4. CHECK BELT TENSION USING BELT TENSION GAUGE 5. TURN ON THE AC AND
ALLOW TO RUN FOR 5 MINUTES. MONITOR ANY VIBRATION OR UNSUAL NOISE.

F. STRUCTURAL BODY CHECK: 1. PERFORM COMPLETE BODY CHECK AND CONFIRM ALL
PANELS ARE PROPERLY INSTALLED AND SECURELY FASTENED 2. REMOVE ALL DIRT AND
DUST OFF THE BODY WITH A WET CLOTH AND MILD SOAP 3. ENSURE ALL DIRT IS
REMOVED FROM THE CONDENSER FAN GRILL (ALL GRILLS SHOULD BE THOROUGHLY
CLEANED) 4. CHECK AND CLEAN DRAIN PIPE ENSURING IT IS FULLY OPEN (NO CLOGGING)
5. CLEAN ALL ACCESS WALKWAYS AND HANDRAILS (APPLICABLE ONLY TO ROTUNDA
AC)

G. OPERATOR PANEL CHECK: 1. CONFIRM OPERATOR PANEL DISPLAY IS OPERATIONAL.


REPLACE BATTERY IF NECESSARY. 2. CONFIRM OPERATOR PANEL SETTINGS (21
DEGREES C) 3. CLEAN OPERATOR PANEL/COVER WITH A WET CLOTH AND MID SOAP

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94546
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_23.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:ROOF_AC_4W.
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:ROOFTOP AC 4 WEEKLY MPM
Work Decription:ROOFTOP AC 4 WEEKLY PM

NOTE: THIS PM IS TO BE PERFORMED USING THE ELECTRONIC CHECKLIST. THE ROUTINE


CHECKLIST SHOULD BE FILLED IMMEDIATELY AFTER THE COMPLETION OF THE PM
CHECKLIST.

WEAR SUITABLE PBB AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

A. STRUCTURAL INSULATED DUCTING CHECK (TO BE CHECKED WHEN AC IS ON) 1. CHECK


INSULATION OF DUCTING (CONFIRM THERE ARE NO TORN DUCT TAPES ON THE DUCT) 2.
CHECK ALL INTERFACE SEALS BETWEEN DUCTING AND AC. ENSURE THERE ARE NO
LEAKS. 3. CHECK ALL INTERFACE SEALS BETWEEN DUCTING AND PBB. ENSURE THERE
ARE NO LEAKS. 4. ANY REPAIR TO THE SEALS SHOULD BE DONE WITH THE AC OFF

B. AC PERFORMANCE PARAMETERS CHECK: 1. CONNECT DUAL MANTOOTH AND MEASURE


THE FOLLOWING READINGS: 1.1 HIGH (DISCHARGE) PRESSURE USING YELLOW JACKET
MANTOOTH 1.2 LOW (SUCTION) PRESSURE USING YELLOW JACKET MANTOOTH 1.3
SUPERHEAT VALUE 1.4 DISCHARGE TEMPERATURE 1.5 SUCTION TEMPERATURE 1.6
CONDENSER OUTLET TEMPERATURE

C. AC ELECTRICAL PARAMETERS CHECK: 1. MEASURE VOLTAGE ACROSS PHASES 1, 2


AND 3 2. MEASURE CURRENT ACROSS PHASES 1, 2 AND 3 3. MEASURE COMPRESSOR
CURRENT ACROSS PHASES 1, 2 AND 3 4. MEASURE MAIN BLOWER MOTOR CURRENT
ACROSS PHASES 1, 2 AND 3 5. MEASURE CONDENSER FAN MOTOR CURRENT ACROSS
PHASES 1, 2 AND 3

D. EVAPORATOR AND CONDENSER CHECK: 1. REMOVE AIR FILTER AND CLEAN


ACCORDINGLY USING VACUUM (DO NOT USE HIGH PRESSURE) 2. USE THE LEAK
DETECTOR TO PERFORM A COMPLETE CHECK ON ALL FREON PIPING AND FIXTURES AND
WELD JOINTS STARTING FROM THE DISCHARGE SIDE OF THE COMPRESSOR AND ENDING
WITH THE SUCTION SIDE OF THE COMPRESSOR 2. REPORT IMMEDIATELY ANY LEAKS. 3.
COMB ANY BENDS IN THE EVAPORATOR AND CONDENSER FINS 4. CHECK THE DUST
LEVEL OF EVAPORATOR AND CONDENSER AND CLEAN WITH A LOW PRESSURE WATER
HOSE FROM THE INSIDE TO THE OUTSIDE (DO NOT USE HIGH PRESSURE)

E. BELT DRIVE CHECK: 1. CHECK BELT CONDITION FOR WEAR AND TEAR 2. CHECK PULLEY
CONDITION FOR WEAR AND TEAR (ENSURE ALL ALLEN BOLTS ARE PROPERLY
TIGHTENED) 3. CHECK V-BELT ALIGNMENT USING THE SKF LPA40 LASER ALIGNMENT
TOOL 4. CHECK BELT TENSION USING BELT TENSION GAUGE 5. TURN ON THE AC AND
ALLOW TO RUN FOR 5 MINUTES. MONITOR ANY VIBRATION OR UNSUAL NOISE.

F. STRUCTURAL BODY CHECK: 1. PERFORM COMPLETE BODY CHECK AND CONFIRM ALL
PANELS ARE PROPERLY INSTALLED AND SECURELY FASTENED 2. REMOVE ALL DIRT AND
DUST OFF THE BODY WITH A WET CLOTH AND MILD SOAP 3. ENSURE ALL DIRT IS
REMOVED FROM THE CONDENSER FAN GRILL (ALL GRILLS SHOULD BE THOROUGHLY
CLEANED) 4. CHECK AND CLEAN DRAIN PIPE ENSURING IT IS FULLY OPEN (NO CLOGGING)
5. CLEAN ALL ACCESS WALKWAYS AND HANDRAILS (APPLICABLE ONLY TO ROTUNDA
AC)

G. OPERATOR PANEL CHECK: 1. CONFIRM OPERATOR PANEL DISPLAY IS OPERATIONAL.


REPLACE BATTERY IF NECESSARY. 2. CONFIRM OPERATOR PANEL SETTINGS (21
DEGREES C) 3. CLEAN OPERATOR PANEL/COVER WITH A WET CLOTH AND MID SOAP

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94547
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:5
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_COND23.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:21 Oct 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:K7C_AC_4W .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:CONDENSER CASSETTE AC 4 WEEKLY MPM
Work Decription:CONDENSER CASSETTE AC 4 WEEKLY PM

NOTE: THIS PM IS TO BE PERFORMED USING THE ELECTRONIC CHECKLIST. THE ROUTINE


CHECKLIST SHOULD BE FILLED BEFORE AND IMMEDIATELY AFTER THE COMPLETION OF
THE PM CHECKLIST.

WEAR SUITABLE PBB AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

A. AC PERFORMANCE PARAMETERS CHECK: 1. CONNECT DUAL MANTOOTH AND


MEASURE THE FOLLOWING READINGS: 1.1 HIGH (DISCHARGE) PRESSURE USING YELLOW
JACKET MANTOOTH 1.2 LOW (SUCTION) PRESSURE USING YELLOW JACKET MANTOOTH
1.3 SUPERHEAT VALUE 1.4 DISCHARGE TEMPERATURE 1.5 SUCTION TEMPERATURE 1.6
CONDENSER OUTLET TEMPERATURE

B. AC ELECTRICAL PARAMETERS CHECK: 1. MEASURE VOLTAGE 2. MEASURE CURRENT 3.


MEASURE COMPRESSOR CURRENT 4. MEASURE CONDENSER FAN MOTOR CURRENT

C. CONDENSER CHECK: 1. USE THE LEAK DETECTOR TO PERFORM A COMPLETE CHECK ON


ALL FREON PIPING AND FIXTURES AND WELD JOINTS STARTING FROM THE DISCHARGE
SIDE OF THE COMPRESSOR AND ENDING WITH THE SUCTION SIDE OF THE COMPRESSOR 2.
REPORT IMMEDIATELY ANY LEAKS. 3. COMB ANY BENDS IN THE CONDENSER FINS 4.
CHECK THE DUST ON THE CONDENSER AND CLEAN WITH A LOW PRESSURE WATER HOSE
FROM THE INSIDE TO THE OUTSIDE (DO NOT USE HIGH PRESSURE)

F. STRUCTURAL BODY CHECK: 1. PERFORM COMPLETE BODY CHECK AND CONFIRM ALL
PANELS ARE PROPERLY INSTALLED AND SECURELY FASTENED. ENSURE THE CONDENSER
UNIT IS FIRMLY CONNECTED TO THE PBB STRUCTURE 2. REMOVE ALL DIRT AND DUST OFF
THE BODY WITH A WET CLOTH AND MILD SOAP 3. ENSURE ALL DIRT IS REMOVED FROM
THE CONDENSER FAN GRILL (ALL GRILLS SHOULD BE THOROUGHLY CLEANED) 4. CHECK
AND CLEAN DRAIN PIPE ENSURING IT IS FULLY OPEN (NO CLOGGING)

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94548
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:5
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_COND23.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:21 Oct 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:K7C_AC_4W .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:CONDENSER CASSETTE AC 4 WEEKLY MPM
Work Decription:CONDENSER CASSETTE AC 4 WEEKLY PM

NOTE: THIS PM IS TO BE PERFORMED USING THE ELECTRONIC CHECKLIST. THE ROUTINE


CHECKLIST SHOULD BE FILLED BEFORE AND IMMEDIATELY AFTER THE COMPLETION OF
THE PM CHECKLIST.

WEAR SUITABLE PBB AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

A. AC PERFORMANCE PARAMETERS CHECK: 1. CONNECT DUAL MANTOOTH AND


MEASURE THE FOLLOWING READINGS: 1.1 HIGH (DISCHARGE) PRESSURE USING YELLOW
JACKET MANTOOTH 1.2 LOW (SUCTION) PRESSURE USING YELLOW JACKET MANTOOTH
1.3 SUPERHEAT VALUE 1.4 DISCHARGE TEMPERATURE 1.5 SUCTION TEMPERATURE 1.6
CONDENSER OUTLET TEMPERATURE

B. AC ELECTRICAL PARAMETERS CHECK: 1. MEASURE VOLTAGE 2. MEASURE CURRENT 3.


MEASURE COMPRESSOR CURRENT 4. MEASURE CONDENSER FAN MOTOR CURRENT

C. CONDENSER CHECK: 1. USE THE LEAK DETECTOR TO PERFORM A COMPLETE CHECK ON


ALL FREON PIPING AND FIXTURES AND WELD JOINTS STARTING FROM THE DISCHARGE
SIDE OF THE COMPRESSOR AND ENDING WITH THE SUCTION SIDE OF THE COMPRESSOR 2.
REPORT IMMEDIATELY ANY LEAKS. 3. COMB ANY BENDS IN THE CONDENSER FINS 4.
CHECK THE DUST ON THE CONDENSER AND CLEAN WITH A LOW PRESSURE WATER HOSE
FROM THE INSIDE TO THE OUTSIDE (DO NOT USE HIGH PRESSURE)

F. STRUCTURAL BODY CHECK: 1. PERFORM COMPLETE BODY CHECK AND CONFIRM ALL
PANELS ARE PROPERLY INSTALLED AND SECURELY FASTENED. ENSURE THE CONDENSER
UNIT IS FIRMLY CONNECTED TO THE PBB STRUCTURE 2. REMOVE ALL DIRT AND DUST OFF
THE BODY WITH A WET CLOTH AND MILD SOAP 3. ENSURE ALL DIRT IS REMOVED FROM
THE CONDENSER FAN GRILL (ALL GRILLS SHOULD BE THOROUGHLY CLEANED) 4. CHECK
AND CLEAN DRAIN PIPE ENSURING IT IS FULLY OPEN (NO CLOGGING)

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94549
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:5
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP23.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:K7E_AC_4W .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:EVAPORATOR CASSETTE AC 4 WEEKLY MPM
Work Decription:EVAPORATOR CASSETTE TYPE AC 4 WEEKLY PM

NOTE: THIS PM IS TO BE PERFORMED USING THE ELECTRONIC CHECKLIST. THE ROUTINE


CHECKLIST SHOULD BE FILLED IMMEDIATELY AFTER THE COMPLETION OF THE PM
CHECKLIST.

WEAR SUITABLE PBB AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

A. AC ELECTRICAL PARAMETERS CHECK: 1. MEASURE EVAPORTATOR FAN MOTOR


CURRENT

B. EVAPORATOR CHECK: 1.USE THE LEAK DETECTOR TO PERFORM A COMPLETE CHECK


ON ALL FREON PIPING AND FIXTURES AND WELD JOINTS STARTING FROM THE DISCHARGE
SIDE OF THE COMPRESSOR AND ENDING WITH THE SUCTION SIDE OF THE COMPRESSOR 2.
REPORT IMMEDIATELY ANY LEAKS. 3. COMB ANY BENDS IN THE EVAPORATOR FINS 4.
CHECK THE DUST ON THE EVAPORATOR AND CLEAN WITH A LOW PRESSURE WATER
HOSE FROM THE INSIDE TO THE OUTSIDE IF NECESSARY (DO NOT USE HIGH PRESSURE) C.
STRUCTURAL BODY CHECK: 1. PERFORM COMPLETE BODY CHECK AND CONFIRM ALL
PANELS ARE PROPERLY INSTALLED AND SECURELY FASTENED. ENSURE THE CONDENSER
UNIT IS FIRMLY CONNECTED TO THE PBB STRUCTURE 2. REMOVE ALL DIRT AND DUST OFF
THE BODY WITH A WET CLOTH AND MILD SOAP 3. ENSURE ALL DIRT IS REMOVED FROM
THE CONDENSER FAN GRILL (ALL GRILLS SHOULD BE THOROUGHLY CLEANED) 4. CHECK
AND CLEAN DRAIN PIPE ENSURING IT IS FULLY OPEN (NO CLOGGING)

D. OPERATOR PANEL CHECK: 1. CONFIRM OPERATOR PANEL DISPLAY IS OPERATIONAL.


REPLACE BATTERY IF NECESSARY. 2. CONFIRM OPERATOR PANEL SETTINGS (21
DEGREES C) 3. CLEAN OPERATOR PANEL/COVER WITH A WET CLOTH AND MID SOAP

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94550
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:5
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP23.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:K7E_AC_4W .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:EVAPORATOR CASSETTE AC 4 WEEKLY MPM
Work Decription:EVAPORATOR CASSETTE TYPE AC 4 WEEKLY PM

NOTE: THIS PM IS TO BE PERFORMED USING THE ELECTRONIC CHECKLIST. THE ROUTINE


CHECKLIST SHOULD BE FILLED IMMEDIATELY AFTER THE COMPLETION OF THE PM
CHECKLIST.

WEAR SUITABLE PBB AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

A. AC ELECTRICAL PARAMETERS CHECK: 1. MEASURE EVAPORTATOR FAN MOTOR


CURRENT

B. EVAPORATOR CHECK: 1.USE THE LEAK DETECTOR TO PERFORM A COMPLETE CHECK


ON ALL FREON PIPING AND FIXTURES AND WELD JOINTS STARTING FROM THE DISCHARGE
SIDE OF THE COMPRESSOR AND ENDING WITH THE SUCTION SIDE OF THE COMPRESSOR 2.
REPORT IMMEDIATELY ANY LEAKS. 3. COMB ANY BENDS IN THE EVAPORATOR FINS 4.
CHECK THE DUST ON THE EVAPORATOR AND CLEAN WITH A LOW PRESSURE WATER
HOSE FROM THE INSIDE TO THE OUTSIDE IF NECESSARY (DO NOT USE HIGH PRESSURE) C.
STRUCTURAL BODY CHECK: 1. PERFORM COMPLETE BODY CHECK AND CONFIRM ALL
PANELS ARE PROPERLY INSTALLED AND SECURELY FASTENED. ENSURE THE CONDENSER
UNIT IS FIRMLY CONNECTED TO THE PBB STRUCTURE 2. REMOVE ALL DIRT AND DUST OFF
THE BODY WITH A WET CLOTH AND MILD SOAP 3. ENSURE ALL DIRT IS REMOVED FROM
THE CONDENSER FAN GRILL (ALL GRILLS SHOULD BE THOROUGHLY CLEANED) 4. CHECK
AND CLEAN DRAIN PIPE ENSURING IT IS FULLY OPEN (NO CLOGGING)

D. OPERATOR PANEL CHECK: 1. CONFIRM OPERATOR PANEL DISPLAY IS OPERATIONAL.


REPLACE BATTERY IF NECESSARY. 2. CONFIRM OPERATOR PANEL SETTINGS (21
DEGREES C) 3. CLEAN OPERATOR PANEL/COVER WITH A WET CLOTH AND MID SOAP

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94551
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:5
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_23
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:ROOF_AC_4W.
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:ROOFTOP AC 4 WEEKLY MPM
Work Decription:ROOFTOP AC 4 WEEKLY PM

NOTE: THIS PM IS TO BE PERFORMED USING THE ELECTRONIC CHECKLIST. THE ROUTINE


CHECKLIST SHOULD BE FILLED IMMEDIATELY AFTER THE COMPLETION OF THE PM
CHECKLIST.

WEAR SUITABLE PBB AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

A. STRUCTURAL INSULATED DUCTING CHECK (TO BE CHECKED WHEN AC IS ON) 1. CHECK


INSULATION OF DUCTING (CONFIRM THERE ARE NO TORN DUCT TAPES ON THE DUCT) 2.
CHECK ALL INTERFACE SEALS BETWEEN DUCTING AND AC. ENSURE THERE ARE NO
LEAKS. 3. CHECK ALL INTERFACE SEALS BETWEEN DUCTING AND PBB. ENSURE THERE
ARE NO LEAKS. 4. ANY REPAIR TO THE SEALS SHOULD BE DONE WITH THE AC OFF

B. AC PERFORMANCE PARAMETERS CHECK: 1. CONNECT DUAL MANTOOTH AND MEASURE


THE FOLLOWING READINGS: 1.1 HIGH (DISCHARGE) PRESSURE USING YELLOW JACKET
MANTOOTH 1.2 LOW (SUCTION) PRESSURE USING YELLOW JACKET MANTOOTH 1.3
SUPERHEAT VALUE 1.4 DISCHARGE TEMPERATURE 1.5 SUCTION TEMPERATURE 1.6
CONDENSER OUTLET TEMPERATURE

C. AC ELECTRICAL PARAMETERS CHECK: 1. MEASURE VOLTAGE ACROSS PHASES 1, 2


AND 3 2. MEASURE CURRENT ACROSS PHASES 1, 2 AND 3 3. MEASURE COMPRESSOR
CURRENT ACROSS PHASES 1, 2 AND 3 4. MEASURE MAIN BLOWER MOTOR CURRENT
ACROSS PHASES 1, 2 AND 3 5. MEASURE CONDENSER FAN MOTOR CURRENT ACROSS
PHASES 1, 2 AND 3

D. EVAPORATOR AND CONDENSER CHECK: 1. REMOVE AIR FILTER AND CLEAN


ACCORDINGLY USING VACUUM (DO NOT USE HIGH PRESSURE) 2. USE THE LEAK
DETECTOR TO PERFORM A COMPLETE CHECK ON ALL FREON PIPING AND FIXTURES AND
WELD JOINTS STARTING FROM THE DISCHARGE SIDE OF THE COMPRESSOR AND ENDING
WITH THE SUCTION SIDE OF THE COMPRESSOR 2. REPORT IMMEDIATELY ANY LEAKS. 3.
COMB ANY BENDS IN THE EVAPORATOR AND CONDENSER FINS 4. CHECK THE DUST
LEVEL OF EVAPORATOR AND CONDENSER AND CLEAN WITH A LOW PRESSURE WATER
HOSE FROM THE INSIDE TO THE OUTSIDE (DO NOT USE HIGH PRESSURE)

E. BELT DRIVE CHECK: 1. CHECK BELT CONDITION FOR WEAR AND TEAR 2. CHECK PULLEY
CONDITION FOR WEAR AND TEAR (ENSURE ALL ALLEN BOLTS ARE PROPERLY
TIGHTENED) 3. CHECK V-BELT ALIGNMENT USING THE SKF LPA40 LASER ALIGNMENT
TOOL 4. CHECK BELT TENSION USING BELT TENSION GAUGE 5. TURN ON THE AC AND
ALLOW TO RUN FOR 5 MINUTES. MONITOR ANY VIBRATION OR UNSUAL NOISE.

F. STRUCTURAL BODY CHECK: 1. PERFORM COMPLETE BODY CHECK AND CONFIRM ALL
PANELS ARE PROPERLY INSTALLED AND SECURELY FASTENED 2. REMOVE ALL DIRT AND
DUST OFF THE BODY WITH A WET CLOTH AND MILD SOAP 3. ENSURE ALL DIRT IS
REMOVED FROM THE CONDENSER FAN GRILL (ALL GRILLS SHOULD BE THOROUGHLY
CLEANED) 4. CHECK AND CLEAN DRAIN PIPE ENSURING IT IS FULLY OPEN (NO CLOGGING)
5. CLEAN ALL ACCESS WALKWAYS AND HANDRAILS (APPLICABLE ONLY TO ROTUNDA
AC)

G. OPERATOR PANEL CHECK: 1. CONFIRM OPERATOR PANEL DISPLAY IS OPERATIONAL.


REPLACE BATTERY IF NECESSARY. 2. CONFIRM OPERATOR PANEL SETTINGS (21
DEGREES C) 3. CLEAN OPERATOR PANEL/COVER WITH A WET CLOTH AND MID SOAP

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94552
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP11
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94553
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP12
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94554
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP13.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94555
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP13.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94556
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP14.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94557
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP14.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94558
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP15.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94559
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP15.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94560
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP16.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94561
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP16.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94562
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP17
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94563
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP18
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94564
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP21
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94565
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP22
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:17 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94566
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP23.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:18 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94567
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP23.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:18 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94568
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP24.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94569
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP24.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94570
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP25.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94571
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_CABIN_EVAP25.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:CASSETTE AC EVAPORATOR

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94572
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_11
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94573
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_12
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94574
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_13
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94575
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_14
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94576
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_15
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94577
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_16
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94578
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_17
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94579
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_18
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94580
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_21
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94581
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_22
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:17 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94582
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_23
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:18 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94583
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_24
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94584
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_KNUCKLE_25
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94585
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: ZAMIL_AC_TR1_SS
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:15 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94586
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_11
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94587
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_12
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94588
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_13.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94589
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_13.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94590
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_14.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94591
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_14.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94592
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_15.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94593
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_15.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94594
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_16.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94595
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_16.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94596
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_17
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94597
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_18
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94598
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_21
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94599
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_22
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:17 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94600
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_23.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:18 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94601
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_23.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:18 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94602
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_24.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94603
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_24.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94604
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_25.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94605
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0.10
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: HVAC
Asset ID: AC_ROTUNDA_25.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:ROOFTOP AC

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:16 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:AC_FILTER .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:AC FILTER CLEANING
Work Decription:WEAR SUITABLE PPE AT ALL TIMES! DO NOT START YOUR WORK WITHOUT MANDATORY
PPE! SAFETY HARNESS IS MANDATORY WHEN WORKING AT HEIGHT (ON TOP OF THE
PBB)!

1. OPEN THE FILTER COVER (UNFASTEN SCREWS WHERE APPLICABLE) 2. REMOVE FILTER
(S) 3. CLEAN FILTERS USING VACUUM (VACUUM THE EXTERNAL SIDE OF THE FILTER) OR
USING WATER (SPRAY WATER TOWARDS THE INNER SIDE OF THE VACUUM) 4. ENSURE
THE FILTER IS TOTALLY DRY BEFORE INSTALLING 5. CONFIRM FILTER HOLDERS/RAIL IS
INTACT (NO CRACKS) 6. INSERT THE FILTERS AND SECURE THE COVER FIRMLY 7. ENSURE
THE COVER IS TIGHT 8. CHECK FOR ANY UNUSUAL VIBRATION AFTER INSTALLATION 9.
CLEAN THE FILTER COVERS & ENSURE THE AC IS CLEAN

REPORT ANY DEFICIENCIES IMMEDIATELY!


DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94614
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:3
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: GSE
Asset ID: PCA23.1
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:PRE-CONDITIONED AIR UNIT

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:18 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:PCA_QPM_4W.
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:PCA MPM 4 WEEKS
Work Decription:PCA PM CHECK:

A. Structural Check:
2. Perform a visual check on the PCA body confirming there is no damage (down, up and
sides);
5. Check the safety signs and the warning light on the PCA body. Report any loose stickers.
6. Perform check on the PCA solar lights (in the evening) and report any defective lights.
7. Check the hose between the PCA and the HR confirm that the hose is properly tightened
on the PCA.

B. PCA Performance Check:


1. Check all operator panel buttons (ON, OFF, RESET, MODE, UP, DOWN, MENU, EMERGENCY,
etc.). Operator should feel a click under his fingers.
2. Extend both HR hoses and confirm that the "DAMPER NOT IN POSITION" is displayed and
then disappears after 1 minute approximately.
3. Put the PCA is cooling mode and choose Wide Body aircraft. Press ON and monitor the
operation of the PCA.
4. Confirm the PCA is operating smoothly (no vibration, no strange sounds).
5. Switch the graphical display to the temperature output and monitor the temperature drop
for 15 minutes ensuring that the temperature goes down and stabilized around 0 degrees C.
Report any discrepancies to maintenance immediately. Once the temperature of the PCA
reaches below 0, the PCA should no longer supply air with a temperature > 10 degrees C.
6. Once the operation of the PCA stabilizes, check and record the output pressure, output
temperature, flow, ambient temperature, main blower frequency)
7. Switch off the PCA
Note: Report any discrepancies to maintenance immediately!

E. PCA/PBB Interface:
1. Extend the HR Hose and confirm that the PBB screen displays "PCA Hose Connected"
2. Switch ON the PCA and confirm that the PBB screen displays "PCA ON"
3. Activate the emergency button and confirm that the PBB screen displays "PCA Failure"
4. Operate the PBB when the HR Hose is extended. The PBB should not move.
5. Operate the PBB when the PCA is ON. The PBB should not move.
7. Activate the bypass key and move the PBB. The PBB should move accordingly.
8. Check the PCA page on the PBB screen. The PCA status screen should show the PCA
parameters (Only in TR5) Current, Voltage, Power, etc

F. Cooling modules and filter cleaning

1-Check the air blower filter, clean(by air only) or replace as appropriate.
2-For each cooling module:
2.1- Slide out the cooling module .Check that the condenser and evaporator coils are free of
dirt or any blocking objects.
2.2-Using vacuum cleaner, carefully clean inside of PCA of all debris, dust and sand etc
2.3-For the condenser and evaporator :Gently remove excessive dirt with a soft brush.
2.4- For the condenser :Apply water with a low pressure sprayer, set on a course spray
pattern:Start cleaning at the top of the coil and work methodically across and down
2.5-Clean the condensate drain pan with plain water to optimize the efficiency of the PCA
2.7-Check for any Freon leakage (using Yellow jacket leak detector).
2.8- Check the sub cooling value and superheat(5CIf Sub cooling<2, Add Freon.
If Sub cooling>5, Recover Freon.
If Superheat>10C or Superheat<5C, Check the expansion valve.
2.9- Allow to work for 5-10 min. and rinse away dirt and contamination with water.
2.10-Check refrigerant sight glass color (Green: good; Yellow: replace the Freon)
2.11- Check the rubber sealing
3- Check/Clean the duct smoke detector.
4- Check the output temperature.
5-Full Extend the Hose retriever, report any deficiencies.
6-Check the operation of the 4 condensate pumps. If necessary, pour water in the drain pan,
for test of the pumps
7-Ensure that the condensate pipe is free from any damages or bends.
8-Check the oil level of the each compressor(check the inspection glass).
9- Using vacuum cleaner, carefully clean inside of PCA of all debris, dust and sand etc
10- Dismount cover for input filter and block 90 % of the filter area with a piece of carbon
board. Select Ventilation Mode /Narrow Body Aircraft and push the Start button. Verify that
filter clogging warning is shown. Shortly thereafter, stop the unit and allow the unit to power
down. Remove block from the filter area and re-install the filter cover.

11-Check all the modules for any missing bolts.

G. PCA performance parameters:


1-Register (on DeviceMagic) the parameters listed below:
1.1-Output and ambient temperature, Airflow, Pressure and for each cooling module.
1.2-For each cooling module: Pressures, temperatures , current and frequency.
1.3-For main blower: Pressure, airflow , current and frequency.
DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94615
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:3
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type: GSE
Asset ID: PCA23.2
Sub 1: N/A
Sub 2: N/A
Sub 3: N/A
Sub 4: N/A
Sub 5: N/A
Asset Description:PRE-CONDITIONED AIR UNIT

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:18 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:PCA_QPM_4W.
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:PCA MPM 4 WEEKS
Work Decription:PCA PM CHECK:

A. Structural Check:
2. Perform a visual check on the PCA body confirming there is no damage (down, up and
sides);
5. Check the safety signs and the warning light on the PCA body. Report any loose stickers.
6. Perform check on the PCA solar lights (in the evening) and report any defective lights.
7. Check the hose between the PCA and the HR confirm that the hose is properly tightened
on the PCA.

B. PCA Performance Check:


1. Check all operator panel buttons (ON, OFF, RESET, MODE, UP, DOWN, MENU, EMERGENCY,
etc.). Operator should feel a click under his fingers.
2. Extend both HR hoses and confirm that the "DAMPER NOT IN POSITION" is displayed and
then disappears after 1 minute approximately.
3. Put the PCA is cooling mode and choose Wide Body aircraft. Press ON and monitor the
operation of the PCA.
4. Confirm the PCA is operating smoothly (no vibration, no strange sounds).
5. Switch the graphical display to the temperature output and monitor the temperature drop
for 15 minutes ensuring that the temperature goes down and stabilized around 0 degrees C.
Report any discrepancies to maintenance immediately. Once the temperature of the PCA
reaches below 0, the PCA should no longer supply air with a temperature > 10 degrees C.
6. Once the operation of the PCA stabilizes, check and record the output pressure, output
temperature, flow, ambient temperature, main blower frequency)
7. Switch off the PCA
Note: Report any discrepancies to maintenance immediately!

E. PCA/PBB Interface:
1. Extend the HR Hose and confirm that the PBB screen displays "PCA Hose Connected"
2. Switch ON the PCA and confirm that the PBB screen displays "PCA ON"
3. Activate the emergency button and confirm that the PBB screen displays "PCA Failure"
4. Operate the PBB when the HR Hose is extended. The PBB should not move.
5. Operate the PBB when the PCA is ON. The PBB should not move.
7. Activate the bypass key and move the PBB. The PBB should move accordingly.
8. Check the PCA page on the PBB screen. The PCA status screen should show the PCA
parameters (Only in TR5) Current, Voltage, Power, etc

F. Cooling modules and filter cleaning

1-Check the air blower filter, clean(by air only) or replace as appropriate.
2-For each cooling module:
2.1- Slide out the cooling module .Check that the condenser and evaporator coils are free of
dirt or any blocking objects.
2.2-Using vacuum cleaner, carefully clean inside of PCA of all debris, dust and sand etc
2.3-For the condenser and evaporator :Gently remove excessive dirt with a soft brush.
2.4- For the condenser :Apply water with a low pressure sprayer, set on a course spray
pattern:Start cleaning at the top of the coil and work methodically across and down
2.5-Clean the condensate drain pan with plain water to optimize the efficiency of the PCA
2.7-Check for any Freon leakage (using Yellow jacket leak detector).
2.8- Check the sub cooling value and superheat(5CIf Sub cooling<2, Add Freon.
If Sub cooling>5, Recover Freon.
If Superheat>10C or Superheat<5C, Check the expansion valve.
2.9- Allow to work for 5-10 min. and rinse away dirt and contamination with water.
2.10-Check refrigerant sight glass color (Green: good; Yellow: replace the Freon)
2.11- Check the rubber sealing
3- Check/Clean the duct smoke detector.
4- Check the output temperature.
5-Full Extend the Hose retriever, report any deficiencies.
6-Check the operation of the 4 condensate pumps. If necessary, pour water in the drain pan,
for test of the pumps
7-Ensure that the condensate pipe is free from any damages or bends.
8-Check the oil level of the each compressor(check the inspection glass).
9- Using vacuum cleaner, carefully clean inside of PCA of all debris, dust and sand etc
10- Dismount cover for input filter and block 90 % of the filter area with a piece of carbon
board. Select Ventilation Mode /Narrow Body Aircraft and push the Start button. Verify that
filter clogging warning is shown. Shortly thereafter, stop the unit and allow the unit to power
down. Remove block from the filter area and re-install the filter cover.

11-Check all the modules for any missing bolts.

G. PCA performance parameters:


1-Register (on DeviceMagic) the parameters listed below:
1.1-Output and ambient temperature, Airflow, Pressure and for each cooling module.
1.2-For each cooling module: Pressures, temperatures , current and frequency.
1.3-For main blower: Pressure, airflow , current and frequency.
DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94622
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type:
Asset ID:
Sub 1: GSE
Sub 2: PCA506R
Sub 3: Select Category
Sub 4:
Sub 5:
Asset Description:PRE-CONDITIONED AIR UNIT

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:14 Nov 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:PCA_MRC .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:PCA MAINTENANCE ROUTINE CHECK ( MRC )
Work Decription:PCA MRC CHECK:

A. Structural Check:
2. Perform a visual check on the PCA body confirming there is no damage (down, up and
sides);
5. Check the safety signs and the warning light on the PCA body. Report any loose stickers.
6. Perform check on the PCA solar lights (in the evening) and report any defective lights.
7. Check the hose between the PCA and the HR confirm that the hose is properly tightened
on the PCA.

B. PCA Performance Check:


1. Check all operator panel buttons (ON, OFF, RESET, MODE, UP, DOWN, MENU, EMERGENCY,
etc.). Operator should feel a click under his fingers.
2. Extend both HR hoses and confirm that the "DAMPER NOT IN POSITION" is displayed and
then disappears after 1 minute approximately.
3. Put the PCA is cooling mode and choose Wide Body aircraft. Press ON and monitor the
operation of the PCA.
4. Confirm the PCA is operating smoothly (no vibration, no strange sounds).
5. Switch the graphical display to the temperature output and monitor the temperature drop
for 15 minutes ensuring that the temperature goes down and stabilized around 0 degrees C.
Report any discrepancies to maintenance immediately. Once the temperature of the PCA
reaches below 0, the PCA should no longer supply air with temperature > 10 degrees C.
6. Once the operation of the PCA stabilizes, check and record the output pressure, output
temperature, flow, ambient temperature, main blower frequency)
7. Switch off the PCA
Note: Report any discrepancies to maintenance immediately!

E. PCA/PBB Interface:
1. Extend the HR Hose and confirm that the PBB screen displays "PCA Hose Connected"
2. Switch ON the PCA and confirm that the PBB screen displays "PCA ON"
3. Activate the emergency button and confirm that the PBB screen displays "PCA Failure"
4. Operate the PBB when the HR Hose is extended. The PBB should not move.
5. Operate the PBB when the PCA is ON. The PBB should not move.
7. Activate the bypass key and move the PBB. The PBB should move accordingly.
8. Check the PCA page on the PBB screen. The PCA status screen should show the PCA
parameters (Only in TR5) Current, Voltage, Power, etc

F. Cooling modules and filter cleaning

1-Check the air blower filter, clean(by air only) or replace as appropriate.
2- Check/Clean the duct smoke detector.
3- Check the output temperature.
4-Full Extend the Hose retriever, report any deficiencies.
5-Check the operation of the 4 condensate pumps.
6-Ensure that the condensate pipe is free from any damages or bends.
7-Check all the modules for any missing bolts.
DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by:
WO Date:19 Nov 2017
WO NO.:94623
WO Time:01:12:14
Finance Cost Center:
Project #:
Condition Monitor Class:
Sched. Date:
Est. Hours:0
Open / History:O
JOB STATUS:Open
Reasons for cancellation:
WO TYPE:PM .
Problem Type:
Completion date:
Closing date:
Asset Type:
Asset ID:
Sub 1: GSE
Sub 2: PCA14.1
Sub 3: Select Category
Sub 4:
Sub 5:
Asset Description:PRE-CONDITIONED AIR UNIT

Priority Class (RIME Code):100


Priority description:
Priority:
Override priority:0
RIME Ranking Index:0
Priority calculated:10
(for MTP WO)Part transferred
from asset:
Last PM Date:31 Oct 2017
Perform For:SATCO (C. Santiago)
Perform By Employee:
Request #: Go To
Requested By:P.M. Schedule
Task No.:PCA_MRC .
Requested Through:
Assign To:SATCO (A. Buenaflor)
Received By::
Brief/Problem Description:PCA MAINTENANCE ROUTINE CHECK ( MRC )
Work Decription:PCA MRC CHECK:

A. Structural Check:
2. Perform a visual check on the PCA body confirming there is no damage (down, up and
sides);
5. Check the safety signs and the warning light on the PCA body. Report any loose stickers.
6. Perform check on the PCA solar lights (in the evening) and report any defective lights.
7. Check the hose between the PCA and the HR confirm that the hose is properly tightened
on the PCA.

B. PCA Performance Check:


1. Check all operator panel buttons (ON, OFF, RESET, MODE, UP, DOWN, MENU, EMERGENCY,
etc.). Operator should feel a click under his fingers.
2. Extend both HR hoses and confirm that the "DAMPER NOT IN POSITION" is displayed and
then disappears after 1 minute approximately.
3. Put the PCA is cooling mode and choose Wide Body aircraft. Press ON and monitor the
operation of the PCA.
4. Confirm the PCA is operating smoothly (no vibration, no strange sounds).
5. Switch the graphical display to the temperature output and monitor the temperature drop
for 15 minutes ensuring that the temperature goes down and stabilized around 0 degrees C.
Report any discrepancies to maintenance immediately. Once the temperature of the PCA
reaches below 0, the PCA should no longer supply air with temperature > 10 degrees C.
6. Once the operation of the PCA stabilizes, check and record the output pressure, output
temperature, flow, ambient temperature, main blower frequency)
7. Switch off the PCA
Note: Report any discrepancies to maintenance immediately!

E. PCA/PBB Interface:
1. Extend the HR Hose and confirm that the PBB screen displays "PCA Hose Connected"
2. Switch ON the PCA and confirm that the PBB screen displays "PCA ON"
3. Activate the emergency button and confirm that the PBB screen displays "PCA Failure"
4. Operate the PBB when the HR Hose is extended. The PBB should not move.
5. Operate the PBB when the PCA is ON. The PBB should not move.
7. Activate the bypass key and move the PBB. The PBB should move accordingly.
8. Check the PCA page on the PBB screen. The PCA status screen should show the PCA
parameters (Only in TR5) Current, Voltage, Power, etc

F. Cooling modules and filter cleaning

1-Check the air blower filter, clean(by air only) or replace as appropriate.
2- Check/Clean the duct smoke detector.
3- Check the output temperature.
4-Full Extend the Hose retriever, report any deficiencies.
5-Check the operation of the 4 condensate pumps.
6-Ensure that the condensate pipe is free from any damages or bends.
7-Check all the modules for any missing bolts.
DOWNTIME(HOURS):0
DOWNTIME:
SERVICE CALL RECEIVING
TIME:
START TIME:
FINISH TIME:
Intervention duration:0
Response time:0
Comments:
last CM date:
image:
Parts required list:
Replaced parts returned by:
Replaced parts received by: