In October 1995, the U.S. Army Corps of Engineers published a report that examined a number of options to relieve pressure on the dams, including buyouts upstream and downstream of the reservoirs, excavation of the reservoirs and potential reservoirs upstream. In the end, the Corps found that none of the options were worth the cost.
Originaltitel
Reconnaissance Report - Section 216 Study, Addicks and Barker Reservoirs
In October 1995, the U.S. Army Corps of Engineers published a report that examined a number of options to relieve pressure on the dams, including buyouts upstream and downstream of the reservoirs, excavation of the reservoirs and potential reservoirs upstream. In the end, the Corps found that none of the options were worth the cost.
In October 1995, the U.S. Army Corps of Engineers published a report that examined a number of options to relieve pressure on the dams, including buyouts upstream and downstream of the reservoirs, excavation of the reservoirs and potential reservoirs upstream. In the end, the Corps found that none of the options were worth the cost.