Beruflich Dokumente
Kultur Dokumente
to JDR
www.jdrglobal.com
JDR is a leading provider of technology
connecting the global offshore energy industry
Overview
Main UK Manufacturing
Facility
Quayside facility
Commissioned 2010
146 employees Access to Asian
REC, SPUs & SPCs Markets
VLM, 2X2,200te & 2X4,000te Quayside facility
carousels Commissioned 2006
53 employees
Sales Office/ SPUs & SPCs
Sales Office
Service Center
Bangkok Design Office
Key relationship contact
centre, service to North
Sea & Europe
Sales Office/
Major Service Center
24 employees
Head Office
Key relationship Manufacturing/service facility
contact centre, service to Commissioned 2000
Gulf of Mexico 220 employees
& Latin America IWOCs & components
Braiders, vertical twister, high
pressure test facility
Markets
Renewables
We have embraced the growing international market for alternative and sustainable energy delivery. Our UK
east coast locations makes us ideally located to provide, engineering, manufacturing and installation services for
the evolving renewables market, which is particularly strong in Europe.
Aftermarket
Global aftermarket, installation and maintenance services are provided by our AIM Services division. AIM has a
network of experienced and certified technicians and service support facilities, available 24/7 to manage
customer projects, for JDR and non-JDR products, on or offshore. The team has created periodic maintenance
and inspection routines that include product lifecycle preventative maintenance and assurance programmes.
Oil & Gas
We offer full dynamic analysis, fatigue analysis and seabed stability analysis to prove our SPU design suitability. Actual
qualification testing can also be conducted to verify the design analysis work. JDR has a large team of fully trained and
certified offshore engineers that can work offshore in assisting with the installation, testing and commissioning of our SPU
umbilicals. The teams are fully equipped for rapid mobilisation to anywhere in the world.
Subsea Production
Umbilical
Oil & Gas
Our power cores are rated to 33kV, and chemical hose, fibre optic components, and splitter box assemblies are typically part
of the scope of work. We use a full suite of analytical capabilities including thermal dissipation, chemical compatibility, and
seabed stability to verify our design suitability. If qualification test results are not already available to substantiate new product
designs, mechanical testing takes place either before or in parallel with product manufacture to verify design calculations.
Right:
Subsea Power Cable in
use
Three-core
Subsea Power Cable
Oil & Gas
Our extensive industry experience alongside our capabilities in aftermarket services, enables us to work with customers on a
diverse range of IWOC ventures. We work in partnership with our customers, from project initiation, to long-term support, an
approach that enables customers to place a single order for their complete system package.
Right:
Example of reeler /
spooler package, part of
an IWOCS system
IWOCs umbilical
Renewables
JDR is ideally positioned to offer engineering and scientific support to the evolving renewables market. For example, our
quayside facility at Hartlepool on the UKs east coast, is enabling us to support multiple offshore windfarm projects planned for
the region.
Right:
First turbine in the
Renewable Energy
Greater Gabbard field
Cable
Aftermarket
JDR was created in the early 1990s on the merger of Jacques Cable Systems (UK) and De Regt Special
Cable (Holland). This move brought together 75 years+ combined experience in the design and
manufacture of cables and umbilical systems for use in harsh, dynamic, subsea environments.
September
2007 State-of-the-art facility in Hartlepool creating
JDR acquired step change in production capability
from
Bridgepoint by April 2011 Aug / Sept
Vision Capital & Marine Cables June 2011 2011 March 2012
Goldman Sachs August 2010 division sold(1) First LAL New CEO, Project New
& Management 8m Wave Hub All senior debt batch CFO and COO Vista
for 70m contract completed repaid delivered appointed completes
June 2011
March 2009 August 2010 February 2011 April 2011 VLM April 2012
30m investment Work starts on Project New Vista New carousels commissione LAL Cables
programme in London Array Begins commissioned in d Completed
Hartlepool facility renewables contract Hartlepool
commences
September 2007: JDR acquired by Vision Capital & Goldman Sachs and Management from Bridgepoint Capital
March 2009: Commencement of 30m investment programme to develop a state-of-the-art facility in Hartlepool
February 2011: Implementation of Project New Vista (to re-engineer the MRP system used for scheduling and
planning to accommodate capacity of our growing manufacturing capability)
April 2011: Marine Cables division (seismic lead-in and air-gun umbilicals and defence cables) sold to Fugro NV
August / September 2011: Appointment of Andrew Norman, Martin Boden and Peter Sayles as CEO, CFO and COO
In summary
Website: www.jdrglobal.com