TOTAL
1,032.69
20,880.74 15,930.43
21,913.44 4779.129
2,191.34
1,095.67
25,200.45
4,536.08
29,736.54
0.75
22,302.40
ALTERNATIVA 1 Y 2
TOTAL
48,509.07
2,158.90
20,880.74
71,548.72
7,154.87
3,577.44
82,281.02
14,810.58
97,091.61
0.75
72,818.71
ALTERNATIVA 1 Y 2
TOTAL
1,108.87
10,512.48
14,879.76
26,501.12
2,650.11
1,325.06
30,476.28
5,485.73
35,962.02
0.75
26,971.51
: ALTERNATIVA 1
TOTAL
1,663.31
12,614.98
29,759.53
58,246.01
102,283.82
10,228.38
5,114.19
117,626.39
21,172.75
138,799.14
0.75
104,099.36
S/. 49,273.91
S/. 176,918.06
NTOS: ALTERNATIVA1 Y 2
ECIOS PRIVADOS
S/. 65,698.55
S/. 235,890.75
S/. 477,923.77
COSTOS DE OPERACIN Y MANTENIMIENTO RUTINARIO VEREDAS: ALTERNATIVA 1 Y
SITUACION CON PROYECTO -PRECIOS PRIVADOS
% DE
ITEM ACTIVIDAD UNID INTERVENCI CANT. P.U
ON
I. VEREDAS
1.01 Limpieza Parcial de Veredas m2 5% 13,769.25 1.50
1.02 Pintado de Bordes de veredas ml 30% 13,728.30 5.07
Costo Directo
Gastos Generales (10%)
Utilidad (5%)
Sub Total
IGV (18%)
Total costos de operacin y mantenimiento rutinario a precios privados S/.
Factor de Correccion para los costos de mantenimiento rutinario y peridico de la
infraestructura
COSTOS DE OPERACIN Y MANTENIMIENTO RUTINARIO PRECIOS SOCIALES S/.
TOTAL
1032.69
20,880.74
21,913.44
2,191.34
1,095.67
25,200.45
4,536.08
29,736.54
0.75
22,302.40
ALTERNATIVA 1 Y 2
TOTAL
81,774.85
3,751.74
24,230.18
109,756.78
10,975.68
5,487.84
126,220.29
22,719.65
148,939.94
0.75
111,704.96
ALTERNATIVA 1 Y 2
TOTAL
1108.87
10512.48
14,879.76
26,501.12
2,650.11
1,325.06
30,476.28
5,485.73
35,962.02
0.75
26,971.51
: ALTERNATIVA 2
TOTAL
1663.31
12614.98
29,759.53
198,396.84
242,434.65
24,243.47
12,121.73
278,799.85
50,183.97
328,983.82
0.75
246,737.87
49,273.91
358,442.83
: ALTERNATIVA 2
RIVADOS
65,698.55
477,923.77
A PRECIOS PRIVADOS FACTOR DE PRECIOS
TOTAL
PARTIDAS CORECCION SOCIALES
MANO DE OBRA CALIFICADA 836,061.34
MANO DE OBRA NO CALIFICAD 1,599,431.30
MATERIALES Y HERRAMIENTAS 6,182,639.65
COSTO DIRECTO 8,618,132.29
GASTOS GENERALES (10%) 861,813.23
UTILIDAD (5%) 430,906.61
IGV (18%) 1,783,953.38
EXPEDIENTE TECNICO (3% CD) 258,543.97
SUPERVISION DE OBRA (4% CD 344,725.29
19283950.88053
A PRECIOS PRIVADOS FACTOR DE
TOTAL PRECIO SOCIAL
PARTIDAS CORECCION
MANO DE OBRA CALIFICADA 1,003,987.67
MANO DE OBRA NO CALIFICAD 1,957,990.19
MATERIALES Y HERRAMIENTAS 6,961,937.37
COSTO DIRECTO 9,923,915.23
GASTOS GENERALES (10%) 992,391.53
UTILIDAD (5%) 496,195.76
IGV (18%) 2,054,250.45
EXPEDIENTE TECNICO (3% CD) 297,717.46
SUPERVISION DE OBRA (4% CD 396,956.61
COSTOS DE OPERACIN
Y MANTENIMIENTO 65,698.55 65,698.55 65,698.55 65,698.55
TOTAL COSTOS
INCREMENTALES 12,298,074.77 65,698.55 65,698.55 65,698.55 65,698.55
COSTOS DE OPERACIN
Y MANTENIMIENTO 65,698.55 65,698.55 65,698.55 65,698.55
TOTAL COSTOS
INCREMENTALES 14,161,427.03 65,698.55 65,698.55 65,698.55 65,698.55
265900.32
670813.66
DE LA ALTERNATIVA I (A PRECIOS PRIVADOS)
PERIODO
5 6 7 8 9 10 11 12
13 14 15 16 17 18 19 20
COSTOS DE OPERACIN
Y MANTENIMIENTO 49,273.91 49,273.91 49,273.91 49,273.91
TOTAL COSTOS
INCREMENTALES 9,715,479.07 49,273.91 49,273.91 49,273.91 49,273.91
COSTOS DE OPERACIN
Y MANTENIMIENTO 49,273.91 49,273.91 49,273.91 49,273.91
TOTAL COSTOS
INCREMENTALES 11,187,527.35 49,273.91 49,273.91 49,273.91 49,273.91
13 14 15 16 17 18 19 20
INDICADORES DE ALTERNATIVA
EVALUACION N 01
1953.96
EVALUACION COSTO EFECTIVIDAD GLOBAL
Precio Sociales Alternativa 2
Sin Proyecto Con Proyecto
Poblacin Beneficiaria Aos
Costo Manten Costo Manten Inversiones
7952 1 0 11,187,527.35
8059 0.9174311927 1 0.00 49,273.91
8167 0.8416799933 2 0.00 49,273.91
8276 0.7721834801 3 0.00 49,273.91
8387 0.7084252111 4 0.00 49,273.91
8500 0.6499313863 5 0.00 358,442.83
8613 0.5962673269 6 0.00 49,273.91
8729 0.5470342448 7 0.00 49,273.91
8846 0.5018662797 8 0.00 49,273.91
8964 0.4604277795 9 0.00 49,273.91
9085 0.4224108069 10 0.00 358,442.83
VAC
Promedio Poblacin Beneficiaria
ICE(S/. X Poblacin Beneficiaria)
M2
ICE(S/.X M2)
ALUACION ECONOMICA
ALTERNATIVA
N 02
S/. 11,835,285.33
8,563
S/. 1,382.21
2210.06
UACION COSTO EFECTIVIDAD GLOBAL
Precio Sociales Alternativa 2
A PRECIOS SOCIALES
Var %
ESCENARIOS Inversi ALTERNATIVA N 01
n
VACS IE C/E
1,050.00
1,000.00
30% 20% 15% 10% 5%
PRECIOS SOCIALES
ALTERNATIVA N 02
VACS IE C/E Alternativa1
1,100.00
1,050.00
1,000.00
950.00
900.00
1,150.00
1,100.00
1,050.00
1,000.00
950.00
900.00
1 2 3 4 5 6
ALTERNATIVA 1
15% 10% 5% 0% 5% 10% 15% 20% 30%
Alternativa1 Alternativa2
3 4 5 6 7 8 9 10 11
ALTERNATIVA 1 ALTERNATIVA 2
SELECCIN DE ALTERNATIVA
Global
EVALUACION ALTERNATIVA 1 ALTERNATIVA 2
VAC Social 10,007,387.90 11,835,285.33
ICE (S/. X Beneficiario ) 1,168.73 1,382.21
ICE (S/. X M2 ) 447.61 529.36
SENSIBILIDAD ICE PISTA Menor Mayor
SOSTENIBILIDAD Seleccionada
PERIODO EN MESES (Nuevo Soles )
COSTO
ACTIVIDADES
PROYECTADO
1ER MES 2do MES 3er MES 4to MES 5to MES
258,543.97
19,093.65
590,005.69
100.00
100.00
100.00
100.00
100.00
100.00
12,298,074.78
Financiamiento
Descripcin Monto
Municipalidad Provincial de Carhuaz Ges 12,298,074.77