Points covered under this presentation


1. project description
2. overall internship experience
3. challenge faced and measures taken
4. overall benefits gained from the internship
5. conclusion and recommendation
Project description

The client of the project is the federal government


communication affairs office and the contractor is Teklebirehan
Ambay construction and the consultant is yohannes abbay with
the sub consultant MGM consult PLC.
The project is located around 4 kilo and have three blocks named
as Block A , Block B and Block C. Block A has 4 basement and 3
story with an area of 1175m2 , Block B has 2 basement and 16
story with an area of 1250m2 , Block C has 2 basement and 4
story with an area of 2175m2.
The full project planned cost is 1.2 billion birr.
. Overall internship experience

the section I have been working on


Office work
Site work
1. Office work
Takeoff Analysis
Ms project
Optimization(Checking balance of material in bar schedule )
Payment
Cont.

Site work
Excavation
Setting out
Formwork
Concrete
Slump test
Cont.

Excavation
Bulk excavation
is an excavation made in larger horizontal size than its vertical depth. It
is usually made for
Removal of poor soil from the site to replace with selected materials
Mat foundation
Allowing hard core under ground floor slab
More than 1.5m
To get horizontal leveled area
Cont.

Setting out
Cont.
Formwork
The form work is temporary construction material used as a mold, in which concrete is placed and harden and
mature in it. When the concrete has reached the required strength the form work is no longer needed and is removed.
Formwork Removal with Out Admixture
Vertical formwork to columns, walls & Beams 16 hours
Soffit formwork to slab 21 days
Props to slab 14 days
Soffit formwork to beam 21 days
Props to beam 14 days
Formwork Removal with Admixture
Vertical formwork to columns, walls & Beams 16 hours
Soffit formwork to slab 7 days
Props to slab 7 days
Soffit formwork to beam 7 days
Props to beam 7 days
Cont.

Concrete
Used in our site:
C5 (lean concrete) - to protect the structural concrete
from damage, water and to give level surface. 1:4:6
C30-with 35mpa compressive strength/ box size 16
C35-with 30mpa compressive strength/ box size 14
Cont..

formwork
Reinforcement Placing
Beam
bar Slab
concrete
Slump test
To check workability of
the concrete
3. Challenges faced and measures
encountered

Measures
Challenges
taken
Ground Water
water proofing
4. Overall benefits of the internship

Improving practical skill


Upgrading theoretical knowledge
Improving enter-personal communication
Understanding work ethics & related issues
Entrepreneurship skill
5. Conclusion and recommendation

Conclusion
Construction is currently the fastest growing sector in Ethiopia.
Being competent among the difference organization and
professionals calls for knowledge, experience management skills
and so much more.
In this company we have seen a lot of things about civil
engineering work during the intern. Especially it gave us an
insight into the professional side of construction works.
Generally working in TACON company has been very
educating. And helps me acquire lots of knowledge relating with
my classroom study.
recommendation

The things I wanted to recommend for the company are the


followings
They should let the students perform some of the tasks given to
the engineers so that the students will gain all the knowledge they
can possibly get
Work has not been done in the schedule so they should give a
solution as much as possible