Beruflich Dokumente
Kultur Dokumente
DO NOT SCALE
22 23 24 25 26 27 65
66
67 6
8 6
9 7
0 01 02 03 04 05 06 07 08
09 10 11 12 13 14 15 16
10000 10000 10000 10000 10000
17 18 19 20 21 22 23 24 25
N
Millimetres
26 27 28 29 30 31 32 33 34 35
36 37 38 39 40 41 42 43 44 45
AIR COMPRESSOR ROOM LOCKERS AND TOILETS WOMEN 46 47 48 49 50 51 52 53 54 55 56 57
DF212A DF217w
58 59 60 61 62 63 64
E&M STORAGE
KEY PLAN
HVAC WORKSHOP DF316
DF203 NOTES:
F/A
10
T/A
M
FCU FCU- D70- GL- 601
3158
N'
7642
Drawing Status
PROJECT CONTRACTOR
Project Title
Filename: M3-DJV-EDR-EME00-D70-DEP-1162003.DWG
RIYADH METRO
AE
Package 3 (Lines 4, 5 & 6)
User name : SSL Date : 10/03/2017 16:59:30
THE CONTRACTOR SHALL RESIZE THE REFRIGERANT SUCTION AND LIQUID PIPES BY Drawing Title
USING THE APPROVED SUPPLIER SELECTION AND THE MANUFACTURER'S PIPING LINES 4&6 DEPOT
DESIGN SIZING CHARTS AND GUIDELINES. DX PIPEWORK
NUMBER OF COMPRESSORS AND CONDENSERS SHALL BE CONFIRMED AS WELL. STABLING&WORKSHOPS BUILDING
GROUND LEVEL PART 55
Scale Designed Drawn Checked Approved
1 : 100 MGA SSL TPE ADR
Original Size Date Date Date Date
A1 09:01:15 09:01:15 09:01:15 09:01:15
1 CP00_GROUND LEVEL PLAN - PART 55 Drawing Number Revision
1162003 SCALE 1 : 100
M3- DJV- EDR- EME00- D70- DEP- 1162003 AE
Copyright C ADA (2017) Filename: M3-DJV-EDR-EME00-D70-DEP-1162003.DWG
Author: SETEC - PARIS, FR