Sie sind auf Seite 1von 2

QMS-BRS, TWG Form No.

18

Department of Public Works and Highways


ACCREDITATION OF CONTRACTORS/CONSULTANTS
MATERIALS ENGINEER
APPLICATION FORM FOR WRITTEN EXAMINATION
__________________________
Date of Examination

Application Number -
2" x 2" Photo

Name :
(Last) (First) (Middle Name)

Birthday : Sex : Civil Status :

Age : Nationality : TIN :

Office : Position :

Office Address :

:
Office Telephone Number Office Fax Number e-mail Address

PRC License Number : Valid Until :

Mailing Address : Zip Code :

Home Address : Zip Code :

:
Home Telephone Number Cellphone Number/s

I certify to the correctness of the foregoing.

_______________________________
Signature over printed name

_________________________
Date
INSTRUCTIONS

1. Fill-out (type or print) all the applicable spaces of the Application Form
legibly

2. Attach to this Application Form the following requirements:

a. Xeroxed copy of valid Professional Regulation Commission (PRC)


Identification Card as Civil Engineer (not expired and with
signature)
b. Xeroxed copy of latest Appointment
c. Two 2" x 2" recent photographs (one to be pasted in the
Application Form and the other is for Notice of Examination
Schedule)
d. One 1" x 1" photograph

3. Submit the Application Form and the requirements to:

The Chief
Quality Assurance and Hydrology Division
Any nearest Regional Office of the Department of Public Works and
Highways

4. Application forms must be received by the DPWH Regional Office at


least thirty (30) days before the scheduled accreditation examination.

5. Applicants shall obtain the Notice of Examination Schedule from the


DPWH Regional Office where the application was filed within one (1)
week before the scheduled examination. The notice shall confirm the
date, time and place of examination. This notice must be presented to the
DPWH examination proctor during the examination.

EXAMINATION COVERAGE

Construction materials specifications, sampling and testing procedures, test results


calculations/interpretation/evaluation, DPWH minimum testing requirements, materials
quality control terminologies/practices, duties and responsibilities of materials engineers,
and quality control implementation/documentation.

Das könnte Ihnen auch gefallen