Wrtsil Marine Solutions

October 2017
Per Helge Madsen
Wrtsil Gas Solutions

1 Wrtsil 1 November 2017 Wrtsil Midstream Reidar Strande


Regasification systems for FSRUs - References
Max Operating
Delivery Year Project Customer Type Trains
Capacity

2018 Hegh SN2220 SHI FSRU 3 x 250 MMSCFD 750 MMSCFD

2017 Hegh HN2909 HHI FSRU 4 x 250 MMSCFD 1000 MMSCFD

2018 Golar Retrofit Golar Power FSRU 4 x 250 MMSCFD 1000 MMSCFD

2018 Hegh Retrofit Hegh LNG FSRU 3 x 250 MMSCFD 750 MMSCFD

2017 Gazprom HN 2854 HHI FSRU 3 x 250 MMSCFD 500 MMSCFD

2016 Hoegh Generic HN 2865 HHI FSRU 3 x 250 MMSCFD 750 MMSCFD

2015 Hoegh Generic HN 2552 HHI FSRU 3 x 250 MMSCFD 750 MMSCFD

2014 Hoegh Generic HN 2551 / Colombia HHI FSRU 4 x 120 MMSCFD 480 MMSCFD

2013 Hoegh Generic HN 2550 / Egypt HHI FSRU 4 x 120 MMSCFD 480 MMSCFD

2013 Hoegh Generic HN 2549 / Lithuania HHI FSRU 4 x 120 MMSCFD 480 MMSCFD

2013 Hoegh Generic HN 2548 / Indonesia HHI FSRU 3 x 120 MMSCFD 360 MMSCFD

2011 Petronas Ranhill Worley Jetty Re-Gasification Unit 3 x 221 (module) TPH 442 TPH

2010 Golar Khannur Retrofit Golar LNG FSRU 3 x 240 (module) TPH 480 TPH

2009 Golar Freeze Retrofit Golar LNG FSRU 3 x 230 TPH 460 TPH

2008 Golar Winter Retrofit Golar LNG FSRU 3 x 230 TPH 460 TPH

2008 GdF Suez Cape Anne SHI FSRU 3 x 210 TPH 630 TPH

2 2007
Wrtsil GdF Suez Neptune 1 November 2017 SHI
Wrtsil Midstream Reidar Strande FSRU 3 x 210 TPH 630 TPH
LNG regasification references
Hegh LNG/Neptune (03/2010) & Cape Anne (08/2010)
Project: GDF SUEZ, Neptune, USA - SRV
Steam-heated water-glycol system 3 x 210 tons/h trains

Golar LNG / Golar Winter FSRU (09/2009)


Project: Petrobras VT1, Guanabara Bay, Rio de Janeiro
Seawater-propane system: 105 bar / 3 x 230 tons/h trains

Golar LNG / Golar Freeze FSRU (10/2010)


Project: Shell/DUSUP, Dubai
FSRU side-by-side LNG transfer system
Seawater-propane: 63 bar / 3 x 229 tons/h trains

Project: PT Nusantara Regas, Jakarta (07/2011)


FSRU side-by-side LNG transfer system
Seawater-propane:70 bar/ 3 x 220 tons/h trains(3x50%)
Single-lift module: 22x20x12m, 738 tonnes dry weight
BOG recondenser capacity: 6 tons/h per train

Page 3
Wrtsil 3 Wrtsil 1 November 2017 LNGTECH 2012 / Tore Lunde
Ongoing LNG regasification projects

Hegh LNG FSRU at HHI Hegh LNG FSRU at HHI Hegh LNG FSRU at HHI
Project: PGN, Lampung, Project: KlaipedosNafta, Project: Colombia
Indonesia Lithuania Delivery: 2014
Delivery: 2013 Delivery: 2013 Seawater-propane based :
Seawater-propane based Seawater-propane based 3 x 115 tons/h trains (3x33%)
3 x 112 tons/h trains (3x33%) 4 x 115 tons/h (4x25%) Send-out pressure and
Send-out pressure and Send-out pressure and capacity: 85 bar/375 MMscf/d
capacity: 80 bar / 336 tons/h capacity: 65 bar / 345 tons/h BOG recondenser capacity: 5
(375 MMscf/d) (390 MMscf/d) tons/h per train
Single-lift module: 20x18x13 m, Single-lift module: 25x18x13 m,
535 tonnes dry weight 700 tonnes dry weight
BOG recondenser capacity: 5 BOG recondenser capacity: 5
tons/h per train tons/h per train

Page 4
Wrtsil 4 Wrtsil 1 November 2017 LNGTECH 2012 / Tore Lunde
LNG regasification projects

Hegh LNG FSRU at HHI Hegh LNG FSRU at HHI Hegh LNG FSRU at HHI
Project: Egypt Project: TBA Project: TBA
Delivery: 2015 Delivery: 2016 Delivery: Jan 2017
Seawater-propane based Seawater-propane based Seawater-propane based
4 x 112 tons/h trains (3x33%) 3 x 230 tons/h (3x50%) 3 x 230 tons/h (3x50%)
Send-out pressure and Send-out pressure and Single-lift module: 29x18x12 m,
capacity: 103 bar capacity: 103 bar / 460 tons/h 700 tonnes dry weight
Single-lift module: 26x18x13 m, (500 MMscf/d) BOG recondenser capacity: 8
700 tonnes dry weight Single-lift module: 29x18x12 m, tons/h per train
BOG recondenser capacity: 5 700 tonnes dry weight
tons/h per train BOG recondenser capacity: 8
tons/h per train

Page 5
Wrtsil 5 Wrtsil 1 November 2017 LNGTECH 2012 / Tore Lunde
LNG regasification projects

Gazprom FSRU at HHI


Project: Kaliningrad
Delivery: December 2016
Seawater-propane based
3 x 230 tons/h (3x50%)
Single-lift module: 29x18x12 m,
700 tonnes dry weight
BOG recondenser capacity: 8
tons/h per train
Steam heaters
Winterized version to -30C

Page 6
Wrtsil 6 Wrtsil 1 November 2017 LNGTECH 2012 / Tore Lunde
LNG regasification projects ongoing
New Water Glycol system

6 plants in order, 3 and 4*250mmscfd modules


3 for Hegh, 1 for Golar, 1 for BW, 1 for Hudong

Gazprom FSRU at HHI


Project: Kaliningrad
Delivery: December 2016
Seawater-propane based
3 x 230 tons/h (3x50%)
Single-lift module: 29x18x12 m,
700 tonnes dry weight
BOG recondenser capacity: 8
tons/h per train
Steam heaters
Winterized version to -30C

Page 7
Wrtsil 7 Wrtsil 1 November 2017 LNGTECH 2012 / Tore Lunde
Wrtsil Regasification Systems - Summary

Leading market position (45% ++)

Fast delivery (12-14 Months)

Compact and Reliable plant

Modularized delivery (Easy installation)

Flexible plant configuration

Easy Operation and Maintenance

All equipment can be repaired/replaced


onboard

8 Wrtsil 1 November 2017 Wrtsil Midstream Reidar Strande


Wrtsil Regasification Systems

- Our Key Strength

Track record of 17 plants

Efficient project execution


Sub-vendors
Production yards
Engineering
Procurement
Material handling
Class Society

13 months delivery
Start up 3 days!
9 Wrtsil 1 November 2017 Wrtsil Midstream Reidar Strande