Sie sind auf Seite 1von 78
y ‘Que FANS Sureoes ‘Sealed Grma trees “Table of Contents 1 teoduction 11 Qxganiaton Type 12 Qrganastion Chart 13 company Bafa 2.0 The Project 2.1 Projet Bt 22 Sucrens Catera 2.3 Project implementation 2.4 Project Tipe Corstints 25 Wotan chor 2'A.Gout Cortral, 2.7 Work Bvakclown Structure 218 able of Depandencies 2.9 ogra sian Revaw Technique werrychat 2.40 Cetca Path Method (CPM Network Diagram 2.41 Gans Choet 22 Decnlopeent Management 4.0 Protiinary Studios 151 Ste Analy: Access 32sto Anatyes: ewe 33 Ste anatyes: Use 4 Precadent Stuctes 4.8 Design Proposal 1 Spat Organization 42 docers and Views 13 endanngs Table of Contents 2s Zn an a er a SoStroctuce ‘31 Foundations 5.2 Placement Matted 53 Conreaions 54 Caninar Madcatons 555 keaton 5. Condson SOME .itenge 6.1 Lighting 6.2 Venison (6.3 Rouble Energy 4 Fre Saleny 20 Landscape TT Beating Site 72 Linekesping Choices 7 Maricopa Texture 74 Sofcape Texte 75 Lanaicape Layeut 7 Speaticatns B.8 Quantity Surveying 181 Chat Mlocation 8.2 Conainae Super sea Pring 83 Pelminay Caste 18.4 Bulaing Works Coste 8.5 aecvtactra Conte 8.4 Mecranial& Bectical Cans 83 Wnaemning Bh Other Cost, 8.8 Fal Summary 8.9 Final Overall Cont Erste 8.10 ConmitationFeash Fae Sage Schedule 18.11 Comparson of locaton vs tate 9.0 References 100 Appendices 28 204 2 a oe 932 53-97 3 e041 0 rr 65 re 6 70 a 2 a a 5 % n 8 Hierarchy Oriented ‘Culture Structured, Dependable eeore Seater ‘Smooth Scheduling Cost Effective Introduction Project Manager Be Lee XKiangLoon (D+ Auchituctive Sen Be) Architect ‘AcKoin Sung Je || (Ass 26) Cd ‘Quantity Suneyor MBE Engineer BS Engineer Landscape Architect S. Kosi Yong Ket te Kho Yer Min Lee ren Shing Ae eats Vin (KkQuaiity Surveyors) KYMCe,) (Leena) WAM, Lara Architect} Peeabsterman ua (Shemrew ia Gree terme Company Profile Project Manager &, ia] D+L Architecture Sdn Bhd NY ed Company Praite ‘ecitet Malaya aa Carports Number The sal of Drearhwctre we My Matwrinarhiectry, aylrariwraiy, Maly Bethel at$ dence lor) citer, Taare Uva Mala eciSTUDIS at hasnt dot (2007-2011) Pfc Archinect 2011-2044) DrLArhiwetin Sas dhe auPancigalArditect ZONeg ac ging npg iar ster batigy whodateepping nnn peciol deagring anglelanly readktors and corral Patines toesnddeakerstitesamesvaa | Company Profle ean) | Sores axis) zero Maberindtchectre, Unvorty of th Unted Km ger Schalr of Swree ora m Auta, Tyla Ura, Mala Prolene! Eaperien ce Foume + Panners a Asstt Archies! @OVOEDI 21 eect Acitact GOT m9) BSESZERD aPrincpal chives 2015 pees Je ch Sing 4 is meagrined as a promising emerges acta known for Ns sen brings him potce tom people of ae secers hmpontdeaterntsitenatmossaa | Company Profle eee | oe Company Pris 2 Gary Seajon Sih hd etn atl caning le we nee ™ sy Seay Malaya (25H Mani of Baling Surveying (185.1987) Sachalers of Cunny Saying (19811988) ire 1900) Ce eed (Siena las Gree terme Company Profile Gi Structural Engineer Lew wa mate ofthe artecrautuncy fim comprising seme of the praminant igh level of quay nie crv ned ine ne hr ed sein ety rough nnoiatan, sate ofthe a tedrcogies and eacalence merges Being le 10 underuke well oner 100 project win a dort span ance is leita Engireee with oar ol Esginwers Malaya (BEM 2011) (Gul ard stractural Erjrewing Mise, Coveney Urvera) (Eulel Siena! Engeaaring Meng Para, Newnes Usersy re Cone Shing has 8 yeu of experiance woriog wit aihly reuble ard rescerieec il Sturt company Shu has gre lta ol experiance Fora Pat pct pejece aed daly omerging srs wellnans CRS eegan areal Soe hae Thi aae mala null pc lr aanala aati dian anda repsasbentereisinesinsisee) | Company Profle Semmes Srmatarerstimeney | Mechanical & Electrical Engineer Company Preis incutrial corerercal edaatend, howl ete retutoral ard municipal Casa A comin wo pronuang dedora tat reat nlite ad ecient fyseracves ey IVE Engin pra Maser efStachuial Engr wing, ier 2fNettnghar, Us Be a ead Bec Eg, Yarns, Foren io Egheeteg, TaYers Univer 3 Machaneal Kelsie Engineer 2007 — 204) pepeeabsterertnaie ua (Siena ia Grp terms Company Profile Landscape Architect ieeaseeeermxaseiaa) | The Project Cmca Srmactnrstnnnst | prevact Brief co ayers Edaten Group ‘aes somone Complationdendion Sale August 2018 Gient Recuirements | Specifications ie soe Spacsstobe pond [Olkee rasp ghia fatcanararten Govaier dans allonecd Wectancal ir craicnees (ni neces) anceps roan than er beh ieaaseeeermxaseiaa) | The Project Coeeaterpatersuees ll | coccetixia Skills & Experience Ceniins verse spac iabaations Skilled Manager Fulfill Scope & Timeline sie lcs oF Aching Ravens ject com plation recs eae Success ing lawess project comp Criteria Organisation Backup Plans Support among consultants Alternatives to anaure complation ieaaseeeermxaseiaa) | The Project Sciomedtentormaoerrtinssy | Project Implementation By documenting our every project, we have sluay: improved upon our past experiences andhave ‘been adjusting and polihingour methods. But our project implementation strategy has always been consistent because they are industy certified stardard procedes. Our Project Management team strive to have a wholesome coverage of the entie ifery de of ary project. Phases ince project initiation, plansang, implementation, moniter and control atdproyest dosing eee il ecm Excel aed Pama soy cesarean Tie 7 Conran Steg 1m 2 | ContPtannng & Bat geting 2 Sly ee len 1) CSieantcha ttt gen dean 1 SEmmnre cewtentee Monitor & Control saddg 8 Ping eewarhe camel es Tom ner Haine sey Tein & Ceneihourg eet Tango oie Tet cara 3 Rak ismagement an 4S chants Acceptance Best Prackee Standerce (Code Comphavee + Project Hondaver resasomemurnasomena’) | The Project Sores Srmavtayerstimaey | Project Success Criteria: Project Triple Constraints Manipulated Variable : Cost Time Responding Variable : Scape Cost RIM1,500,000 M: Cost Decrease Re Tee thease Scope — Unease M Tae -Daesease RE Cost —thereute Scope ~ Undasived Scope Time Recreation District August 2018 ieaaseeseermxaseiaay | The Project (Siemrew ia Gree Iyer wy Chart Identification Appointment Discussion ‘Allocation of —| ct Na nement FL ie LL] cet Candie MBE Landes mateo We ie dite graphs to estimate ow ebeits investment with 2 realty check, There are oud bs Be delays nel sbppanges ts a peje, thea wre cHler Rallpoal seraees wlth our costs predation. The Project Cost & Contract: Cost Control Gost ($ NIM) ‘wa somata Ai Gompleton enc ‘Guipat Al Carpation (BAC) Perens wa (Pv) (@AC:- EAC) cenecuss Varisnes sv = (Ev -Py, Cost Variance ev = (EV-AC) Estimated | Compl The Project Wor Bre Recreation Blacks easeeeemxaseiaay | The Project CSemetanermminerstmenny | tortor & Conte i Aetvi Predecessor | Duration Schematic Design, in coer ‘Schematie Design = A Site Analysis a 7 B Design Canceat © Authority 8 A a c z @ Design Development — Dadign Davaloparent D : Detaled Desay E Work Schedule 2 Ed F iAuthorty E o 7 Contract Dosumentation E BE 7 : i Contract Documentation & : Detaled Oroine a = a 1 Tends Hi G a Contract Implementation & Management |! GH 2 Contract implementation & Management J: Construction ‘Authority 3 t = L Coordination x 7 7 Final Completion U ms 7 Final Completion M. : Handing ves resasomaemurnasonena’) | The Project Scores Sem ayerstimwnsy | Monitor &-Control: Pragram Evaluation Review Technique (PERT) Chart eeaseeeemsaseiaay | The Project Steet emi taerstmnnty” | Moriter & Control: Critical Path Method (CPM) Network Diagram ol[al7 7 [8 [21 2] elas 35[ 0 [63 ale of[7[7 7 [14 21 21 | 14] 35 35 | 28 | 63 | 7 ge] Hu [v2], [ea] c [oe], [70] F [e+ 9814 fiz] [as] isfoe| [70 | 14] 94 212] « [2i9] ass] a fara] [ra] 1 fae 212| 7 [219] ~ [ass] 7e [ana] [112] 20 [ae 219) 219) [226| [226] m | 220] 226] [226] 14 | 240] - ieeaseeeemxaseiaa) | The Project iomedteat rma eerrtonss) | Development Management ‘The development management plan very important to us It is to ensure that meas plamers and designers follows the ight track of helping our clients toachieve their goals. From itwe can dine relevant and comprehensive solutions that can be done within the consraints presented When chunting chalenges arse, wre can provide sternatves that would minimise or eminate ary ‘nneceniary rake. The efficiency given by the plan lows us to optimize how we accomalih [projects thorourtaly. Development Strategy Pea Dado Corporat : pie aera eel Procwement Strategy Rel Mongeneat + Development Profiling + Design Options 1 + bevopBisinen Care 4: Morag Miele Projects Festbitty 2 Ross ete 2 odetthedsslen Feastiy Ml Lilecyele Analysis Merketing Stotesy Planning © Retum On investment ce 32 oes ect Porflio Pires eet eee et Integration Management, pagename! > Vison Faning + DeveoprentofPhningSrategy 2 | Devcopment Master Pan 5 integrated Process, Took & Techniques : freee 2 EMipes tneleserdnaton Subject Matter Expats soeatetaneaseur)) | Site Analysis CieeceateemAtersueenty | potential teow ‘The Commercial Block wll rectly infuence the user ifow of the proposed Recreation District. tt inhabitants ell sunny and dele the user groups. A time circle & mapped out for potential ‘Algo, with ‘of the new Architectural Design Studio, then all be a sien tnlow of andere selon we nl eye coms bes ‘Saad Gre tnerndmnay Design Proposal Spat ial Organisation Ground Floor Plan First Floor Plan Design Proposal Access & Views ‘Saad Gre tnerndmnay Proposal eeeeemasemaay | Structure Ccementier orem iaerstmessy | Foundations Shallow tip foundation ~ pha and as footing Aadeaet 1S The mest cot aHective Feat ase woud be the easiest forthe DIY to bie + Suitable for sane so + Sabplicy is dag Cissehntages: + Leehabatty 2 Highesat in the hal stages of + Inabsity tomake monolithicbinding of the flow te baseeen PepandBinterantal Ras Structure (Siena i or ter Placement Method (Once the containers have been placed on the foundation, it relatively eazy tomate any final adjustments witha large comer eeeeeemasemaay | Structure Cemewaianermmierstmessy | Convections ‘The foundation s connected io the container through a steel plate which has been set in concrete. Weldi emer ciel shandy person ‘The comer contsines blocks are velded together tosecue the containes to themselves. aeniaernmaseaa) | Structure Cemewaianermmierstmessy | Convections ‘drentages : Contains oie las connect double evded tatlocs lair instante convetna deecty othe shopinaconiaines fre, loving them to Rtncatly betreen the containers Fonds Hisasral cctralcannestan cn be shied at aay age Peeeabsteertn ana Structure (Siemrew ia Gree Iyer Container Modifications Considerableamountaf reinforcement is needed toaubstitute the support that last fram rereving pirt of the paneling For the containee Sted kame isusedte frame out the avier part af the container te ta tama eaeeeeemasemaay | Structure (Siemrew ia Gree Iyer Ineulation 088 + OSB is made from fast growing small dlametes trees that can be hhavested from plantations, avoiding the need for auting ld growth tees. Even the amalest serps of wood can be turned into (OSB, vitualy eliminating waste, EPS foun + EPS foam is reqjlable material that i compktey inet in the enrronmant, and isin fact often saed a a soil additive, Producing EPS foam inulation requis lew energy than podveng Roergiant inaulation and no CFCs are wedlin the process + Natura, not tonic, safe to handle and touch, It also mane thet ae timber ages, it does 30 naturally and dosn't break down into en rormentaly damaging materials + Good insulator in reducing the amount of eneray use! to heat and sperateabulding insulation s very important Pegsadbeabernttnanamoeiaay) | Structure CSemenaienermminerstmensy | Conclusion + Sp footing was chosen at it flit the requirements ‘of the unable acl eonction on sit, + Chegpestard easiest tohandie, + The smooth metal plate that the comer blocks + ih anves cout and construction time, rested on, heed aati the respect ie pati soa ca Pepoedenternittaanbiiaa | MRE Fittings Srenti crmistnerssaes) | LEDLighting System LEDlighting wil be wsedto hurinate the spaces ofthe structure. To create contemporary ateoipheie, op cords bghts andievacn hg tubes vlllbe the chins ght to alunite He ‘cubes spaces. Drop Cord Lights &_ Ceiling Lights. Neon Light Tubes Pendant Light Pepoedbenternitteanbiiaa | MBE Fittings Semester ormatwerrtonss) | Lifetime Comparison M&E Fittings LED Lighting Advantages 00 Durable Long Lifetime Size LED lights arereistant to ules ates Various shapes and sires ‘hocks and vibrations. Colour Variation Low Maintenance Efficiency Jusiable in varus colour ideal for outer ndzommercia! LED lights use 40% 758 lass lighting appieation ‘power tha tadittonalight (Geeeceaaatee” | owcnegy Low Energy : Grass Ventilation mateo SINCE 1909 JAPAN M&E Fittings Wall Fans Wall fans ae Not to scale willbe app led in indoor recreational space andlounge or maguiine comer as these joes have acest utara vation. M's aso ut befor spaces with Lowe cada, Peeeabsteertn ana MBE Fittings SSoe ng Split Unit AicConditioning System PDAIKIN «(8 0rtermctnatrititart nents 1 1 Indoor: 3! MSYGLOONA #1 Wa an 000001 BTU fh 3! 1 1 Outdoor -Daikin MUFGLONA LT Sle one costo (Geeciaarcataees” | Meera en Mechanical entation Advantages oO66 Easy to Install ‘Small and Compact Low Maintenance PrgondBentermtsttarsintisica | MBE Fittings Setemeetick Ges Tnerstimemty | Selangor Climatic Graph Average monthly sunhours in Selangor, Malaysia s0caps mawys: Ado ‘dors Scars don Feb Mer Agr Mey Jun ul Age May ee Rainy days Average rainy lays. Selangor, Malaysia (bach Aver a dinate Peeeabsteertn ana (Siemrew ia Gree Iyer M&E Fittings Solar Panel System Aa Ste i fully expaved to daylight, sola panels are propaved to be installed on top ol theaofte ‘obtain maximumamount of sunlight churing the day It isan good alternative vay to replace fossil 1. Solar Panels ‘Atos energy from the sun ane turns it iota OC current 2. Inverter Converts OC currant into AC carant and contol the decticty aed peeduction 3. Electrical Panel Distrbute electicity to building Utility Meter Enc sclar aactity wal owe Bick to the gpd thug the ator 5. Utility Grid Provides decticity when you exceed the ‘amount produced by your solar panels fuel as solar eneray is renewable eneray Soler PV Eat ory J20C Connections ‘90 Connections DC lalmon Sich | $OCIAC ivemter AC Ielaion Sch Crit Moueehael Supply “acre Meter scr Mater xc Power Supply Maly Sop Wr than hay Solar Panel Process Diagram Mae Fittings Solar Energy Advantages Environmental Long Lifetime Protect Against Friendly (up to 30 years) Ever-Rising Electric Low Maintenance Pay Less in Electric Bills Pepoedenternittaanbiiaa | MRE Fittings Smead crmistnersuarss) | Rainwater Harvesting System Rairwates harveatingimolves te colection, storage and distebutionof rainwater fom the root, for we inside and eutside of a bulking. Harvestedrainrater can be wed fr plant irigation and toilet flashing. 1. Catchment (Roof Surface) 4. Pump and fitter 2. Flow into gutter 5. Plant irigation 3. Rahwater stare in the storage 6. Flashing ‘tank g.° (Grecian | Reteetor oe Ranmater Hawvesting Syst Advantages Easy to Install Flushing @ @ Low Maintenance Pay Lessin Water Bill 46, Water Sh when Water Cuts PrgondBentermtsttarsintisica | MBE Fittings Siemedtectormatwerstowss) | Five Protection Components Fie Protectionrequies a certain amount of motion and rexporses in order to work effcientiyin the event fie. 2s ‘Smoke Detector Break Glass Fire Alarm Dry Powder Fire “KELUAR’ Sign Extinguisher PepoedBenternittevansisiaa | Landscape SimeltSpatenetonns) | Exuting Ste Theexistingsite located atthe side ofthe commercialblock With-dayzand and dt for the patie PepoedBenternittevansisiaa | Landscape Cemantiatcrmatnerstnnnst | Landscontng Choices + Syzygium malaccense (A woe that wed fev aesthetic reasoning. ‘Although t provides shed, itmainly is wedto eases the sethetes of the site, al previa 4 aatarol ieee + Hopea odoreta ‘A teoe that excel in shading and which rants does not ascend above ground. favorite for the wre of shading + Timber Pathway A tenber pathway thet suits the surrounding ste and Blends in with the natural sarong. + Timber Bench Tindber benches for the eomfart af Ube users that Blended ell with the sureurding selscapes Seek eel Sewaalorna mer Lan decap Hacdecape Texture Aion se umn ic plararn trem tn Se ight ealous af Elevated Timber Pathway ia e PrgandBentermtsttersineisia.a | Lan cecay (ieee i Gri pera) pe Softscape Texture ‘The vast greenery allows for the revitalization of the already sandy site and creates a esi receatianal enveanment See | eo Londscoping Layout PrgsndBonbermtstRarsineisiaa | Lanckcape (ieee i Gri pera) Hopea odereta Macimentiett Growth Rate Radius Landscaping Layout Syzygium malaccense Maxanum Height: 12m GomthRate —: Obmewr Reacios 22m Deserition ‘decorative tee meantto Pearl Grass Mavenumecht Geomth Rate Radios Flatagainat the ground Moderately fa Moderately low Agrasethatie moderately harcly ‘and does not requiee too much water wich grams wellin shade, ‘ese elements slioa the gras 12 grow rellwithino surounding Imckeane, 5m O.Smfear 45m ‘A wee that primarily provides Shading and i wellsuited for the ate wich hae no natura shading The foots of the tee donot auface andtherebre ‘does nat compromise anh structures we may have in place reseabeeaeetmaneuaa) | Quantity Surveying Cementiakcrmmyerstmenny | Cost all (Cost Allocation Percentage = Op tional Eaparcinre Cost of Dovel 1+ Mechanial & laced Engineering cientinn" (Quantity Surveying Container Supplier and Pricing Price of container: + Brandnew: RM19,000-~ 25,000 + Pressed: RM 6,500, Supplier Redline Stone Location: Klang, Selangor + DEOmm X:2440mm X 270mm + 9120mm X240mm % 270mm + 12190mm X 244mm X 2890mM Taree 3,000 -3,870 Payload, kg 2610 Pegsndbenternistexaimeieaa) | Quantity Surveying Siecle Spateetewns | Preliminary Coste 5 oe ws pec rer . ao w= | | mm | : wu] 3 | EP | Be j ee ¢ fear = | ee | ee {borers wim | i: | ar | ee FEE a comann wmict| 9 | SP | Be 1 fas = [= [me | nee raster aE Pegsndbenterntstenaineiea) | Quantity Surveying Smet crmiinersuanas) | Building Wocks Costs T= i Te Ee ae Toast oT fibers fe: econ acing am monies oti rue ead ate coneton [ter a i, an pe a ha fet cc epg et cing. 4 senaon tr ution pt appoestin® ” 100 vu | sen $— [ecrsen tr genrg tes ct = om | fem | som © feemmer tect ard ey 2 aoc | deem ont 7 rigeroe | iaer.0 Being been ates not onanng 0mm Bor ” a € —|Bedng bea a pated Iw en Hk > wa | sem | ean [lyse ca eoncad cee Gre 2 aon vith nen ne re FeO asta wkend behig berity coord oi Mike eomacanet eating, + [FSi er rol appa tn ” saa] eam | sie 0 [rats ot exening ta apy 4. 7 sam | xam | roman Retna pce Pinay Tilo fMBPH 2) z was [00 | szrsi20 i [Bat bad Mee nb pe = 00 wo | wrasoo0 fab nck wen are ror ee: redone apres RS [trl lr rtd wa pot ht fr ar Bs, ft eatery tant ct a mom | am | orm ll ——_—_—_— De] ree | Quanity Surveying a | 25" Ee 5 ee 2 (ere tes araaeac ca || ox | aamnine| paisa : fee inearpens coo = | 2 | sme] ams : feeuecneeenns =| 2 |sS8| ss ? Sacccuemaree =| | = | =e Perce a aeees || a | oe | ae Es. een | ieee | a: [desc 7 ee oe : Ess $ | Se | Ree i i | ee | tee $ fo 1 ano | iaocn ! S ; am | limon ea Pegsndbenternistexaimecea) | Quantity Surveying SececTeatbesm | ESTE cone Eee ws ESE 1 REET emer w= |e | emmm | ns : ee | ae | aes : emer. win | SEP | as § fecinita ae Z| ss | | Be 5 franca a + ‘owned | “ranca ee = | 4 [Gee | oe + Betreeommarencna | ae | age + faseuner tsar | se bangin 2 | te | Be t ee i | | SE atten : | 8 | Se oe a | 5 | os : fan =|¢ “ase : Eee. a | 4 8 1 foot |b ie — of vm | owen . = 1 Br aestentse : | Be |] pe 1 SSE | Be | BS rnc rT eons jinestmioesise) | Quantity Surveying (ieee i Gri pera) andscaping & Other Costs 7 Ta eT Fasano 4 [ibergtome Mba ekg men Wa = neo | rem | sauce 5 fropeneresnn * * ssn | zwom © [eeapbe rtsccme S % diam | ioe > ateatian ™ acim | om | raeeao fe . aac | aero a = ESE : im | m | enw | anne : = | a | ae : i | a | BS i | 2 | i a i me | a | Re ; | oR | aca Pegsndbenterntstenaimecea) | Quantity Surveying CaeleetermAwersueemy | Final Sumer [Besaipion Prlbriner i [rch ea & Tl TR 5550.00 Bat LETT Tar pst a, 533.00 Fata 27 eOICETY Bevis Pegsndbonterntsteraimeeeaa) | Quantity Surveying temensiavermmtyerstennsy | Final Qyorall Cost Estate Fae Bob FEnTOaT Doo, (Eas [eoratrcton lcout repsasomneermnunerassieea) | Quantity Surveying Scores rms ayerstimnasy | Consultation Fees & Fee Stage Schedule Allocation of consultation fae (15% of construction cost) i RM 108,071.00 at most mp Profession, Percentage nant RM Architect Be ZEW TS a, F075 71 ARIE Sass Sma se oor 00 (Quantity Surveyor Note: “Tho payment for construction stage shall be based on 55% of total fee and be distributed by monthly basi during constuction stage Fee Proposal + Professional Fee at 2.0% of constriction cost ++ Reimbursable (Local Travel Only) 20% of professional fee ‘+ Event management (Local Coorsination Only) 5% of professional fee repsasomaeermnunerassieea’) | Quantity Surveying Scores rm ayerstimeasy” | Comparison of Allocation vs Estimate Cost Allocation Parcentaga Overall Cost Percentage

Das könnte Ihnen auch gefallen