HOW TO ADD NEW SMOKE TO EXISTING LOOP

PROCEDURE:

Install new
smoke to
existing loop

Inform customer for


start installation

NO
START MAKE WIRING
CONNECTION NEW
SMOKE TO EXISTING
Accept or not ?

YES

Configuration software
Install New Smoke FSP-5000-RPS

NO

Finish? Still Loop Fault


YES
on controller?

YES
NO
Inform customer for YES
active bypassed the Un-bypassed Double check
Loop Loop on Wiring connection
controller
NO

Inform Re-configuration
Accept or not ? customer for software FSP-5000-
Final testing RPS

END

Example of a small project


We have connect 5 devices to LSN 0300A

LSN 300mA

S
1 MCP

Sounder Strobe

We would like to add one smoke detector as below:

LSN 300mA
LSN1 LSN2

S
1
MCP
S
1

Sounder Strobe
Wiring connection:

b+ b1 b2 b1
LSN1 NEW SMOKE NEW SMOKE
a- a1/a2 a1/a2

MPC Set up
1. Before we disconnect the Loop we need to set Bypass the Loop which we working on (Figure 1).

Figure 1

2. After we finish connect new smoke in panel will show Loop fault to delete this fault we need to
re-configuration program in FSP-5000-RPS. (Figure 2).

Figure 2
Software Configuration

1. Open program of existing Loop (figure 3,4,5) and add element:

Figure 3

Figure 4
Figure 5

2. Change position new smoke detector as per hardware connection (Figure 6 and 7). Now we have
installed new smoke in first place in network. So we need to move for 6th place to 1st place and
assign group to sensor.

Figure 6
Figure 7

3. Save new configuration and send to controller with restart (Figure 8 and 9):

Figure 8
Figure 9

Note: After we restart controller, Loop fault will disappear. In case Fault does not disappear,
Please re-check again for wiring connection and software configuration.

4. After it does not have any fault then we can test the sensor.