Sie sind auf Seite 1von 2

JINDAL POWER LIMITED

CHECKLISTS
Doc. No. TMD/CL/001

TITLE : CHECKLIST FOR PREVENTIVE MAINTENANCE OF EQUIPMENTS Issue No. /


01 / 01-09-2008
Date

TG & BOP MAINTENANCE DEPARTMENT Rev No. /


00 / 01-09-2008
Date

UNIT : EQUIPMENT : BOILER FEED PUMP, HYDRAULIC COUPLING AND BOOSTER PUMP
WORK ORDER NO. : DATE :

PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :

Sl. Design Actual


Work Instructions Frequency Remarks
No. Value Value

Work to be done/carried out when the equipment is isolated


Take proper PTW and ensure all mechanical, electrical and C&I isolations have been
1 Quarterly
done.
3 Checking of all holding down bolts for tightness and take corrective action if required. Quarterly

5 Check for oil leakages if any arrest it. Quarterly


Check for mechanical seal leakage, if it is beyond permissible limit, take equipment
6 Quarterly
isolation and attend the leakage.
7 Clean the lube oil filter. Quarterly
Check for lubricating oil is flowing freely through the boosters pump DE and NDE
8 Quarterly
bearing drain flow.
Check for lubricating oil is flowing freely through the BP side and HC side driven motor
9 Quarterly
bearing drain flow.
Check for lubricating oil is flowing freely through the feed pump DE and NDE bearing
10 Quarterly
drain flow.
Check that the clarified cooling water from the booster pump mechanical seals is
11 Quarterly
flowing freely through the flow indicators
Check for joints and valve glands for leakages, if any arrest it either by tightening or by
12 Quarterly
replacing the glands.
13 Attend all oil & water leakages Quarterly
Removal of coupling guards of all BFP to hydraulic coupling, Hydraulic coupling to
14 Quarterly
Motor and Motor to Booster Pump and tightness checking of coupling bolts.
Checking of alignment of BFP to Hydraulic coupling, Hydraulic coupling to motor and
15 Quarterly
motor to Booster Pump, if required and do the necessary correction, if required.
JINDAL POWER LIMITED
CHECKLISTS
Doc. No. TMD/CL/001

TITLE : CHECKLIST FOR PREVENTIVE MAINTENANCE OF EQUIPMENTS Issue No. /


01 / 01-09-2008
Date

TG & BOP MAINTENANCE DEPARTMENT Rev No. /


00 / 01-09-2008
Date

UNIT : EQUIPMENT : BOILER FEED PUMP, HYDRAULIC COUPLING AND BOOSTER PUMP
WORK ORDER NO. : DATE :

PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :

Sl. Design Actual


Work Instructions Frequency Remarks
No. Value Value
16 Cleaning of BFP & Booster pump suction strainer. Quarterly

17 Cleaning of Duplex filters Quarterly

18 Cleaning of Mechanical seal coolers of BFP, if required. Half Yearly


Spill over oil / water / grease / cotton waste / etc in surrounding area and floor to be
19 Quarterly
cleaned and disposed.
Return the PTW and trial run of the equipment. If any leakage persists same is to be
20 Quarterly
rectified.

Signature of Contractor Signature of JPL Engineer Signature of JPL Engineer in charge


Page No. : 01

Prepared By : Reviewed & Approved By :

Das könnte Ihnen auch gefallen