Sie sind auf Seite 1von 1

JINDAL POWER LIMITED

CHECKLISTS
Doc. No. TMD/CL/018
TITLE : CHECKLIST FOR PREVENTIVE MAINTENANCE OF EQUIPMENTS Issue No. / Date 01 / 01-09-2008
TG & BOP MAINTENACE DEPARTMENT Rev No. / Date 00 / 01-09-2008
UNIT : EQUIPMENT : HP BYPASS OIL UNIT
WORK ORDER NO. : DATE :

PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :

Sl. Design Actual


Work Instructions Frequency Remarks
No. Value Value
Work to be done/carried out when the equipment is isolated
1 Take proper PTW and ensure all mechanical, electrical and C&I isolations have been done. Monthly

2 Carry out external cleaning of equipment. Monthly

3 Check all joints for leakages if any arrest it. Monthly

4 Check all holding down bolts for tightness and take corrective action if required. Monthly

5 Check for oil leakages if any arrest it. Monthly

6 Check oil level if level is low top-up with SERVO CONVAL –46. Monthly
7 Check N2 Pressure and Nitrogen to be filled in accumulator, if required. Monthly
8 Cleaning / replacement of filters. Monthly
Spill over oil / water / grease / cotton waste / etc in surrounding area and floor to be
9 Monthly
cleaned and disposed.
Return the PTW and trial run of the equipment. If any leakage persists same is to be
10 Monthly
rectified.

Signature of Contractor Signature of JPL Engineer Signature of JPL Engineer in charge


Page No. : 01

Prepared By : Reviewed & Approved By :