Sie sind auf Seite 1von 1

JINDAL POWER LIMITED

CHECKLISTS
Doc. No. TMD/CL/006
TITLE : CHECKLIST FOR PREVENTIVE MAINTENANCE OF EQUIPMENTS Issue No. / Date 01 / 01-09-2008
TG & BOP MAINTENACE DEPARTMENT Rev No. / Date 00 / 01-09-2008
UNIT : EQUIPMENT : CONDENSER VACUUM RECIRCULATION PUMP
WORK ORDER NO. : DATE :

PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :

Sl. Design Actual


Work Instructions Frequency Remarks
No. Value Value
Work to be done/carried out when the equipment is isolated
1 Carry out external cleaning of equipment. Quarterly

2 Check all joints for leakages and take corrective action if required. Quarterly

Check all holding down bolts for tightness and take corrective action if required.
3 Quarterly

4 Check coupling spider for damage, if necessary replace it. Quarterly

5 Inspection of bearings of Pump. Half-Yearly


Check the recirculation pump oil level, if level is low top-up with SERVO PRIME -46.
6 Quarterly
7 Check the tightness of coupling bolts. Quarterly
8 Check for any leakage from mechanical seals. Quarterly
Checking of alignment of Pump with Motor and do the necessary correction if required.
9 Quarterly

Spill over oil / water / grease / cotton waste / etc in surrounding area and floor to be
10 cleaned and disposed Quarterly

Signature of Contractor Signature of JPL Engineer Signature of JPL Engineer in charge


Page No. : 01

Prepared By : Reviewed & Approved By :

Das könnte Ihnen auch gefallen