Beruflich Dokumente
Kultur Dokumente
SITE PLAN
Existing Site Conditions . . . . . . . . . . . . . . . 28
Preliminary Site Plan . . . . . . . . . . . . . . . . . 29
PROPOSAL
PROJE C T I NFOR M A T I ON
ADDRESS: 715 8TH AVE. SEATTLE
DPD PROJECT : #3028357
D E VE LOP M E NT OB JE CT I V E S SITE
The proposed project is a 21-story independent senior living community with
underground parking.
The basic program includes:
nn 77 residential units
8T
HA
nn 186,127 SF gross square footage
VE
nn 23,000 SF amenity area
.
.
nn 76 parking stalls ST
MBIA
LU
CO
proje c t goa l s
Create a vibrant new senior living community that contributes to the
existing Skyline residences in First Hill. Provide safe connections to the
existing community and respond to the scale, context and character of the
neighborhood.
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 3
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
denny triangle
belltown pike/pine
greater duwamish
north rainier
4 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
zo n in g design at io n s
The site is located within the High Rise Zone with the
NC3-160 zone adjacent to the north and west. The
site is bounded by Columbia Street to the north and
8th Avenue to the east and is also located within the
First Hill Urban Center Village.
NC3 -160
HR
site
DOC1
U/450/U zoning designation boundaries
HR SITe
NC3 - 160
MIO - 240 - HR
MIO - 240 - HR
DOC1 U/450/U
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 5
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
UR B A N D E SIG N A NA LYS I S
TRANSPORTATION:
BO
RE
• Streetcar: Broadway
N
9T
AV
HA
• Bus lines: 2, 3, 4, 9, 12, 13, 43, 49, 60, 63, 64, 193, 303, 309, 630
E.
TE
VE
RR
.
ST.
YA
G
RIN
8T
STREET CHARACTERISTICS: SP
VE
H
AV
.
8TH AVENUE:
E .
• Access Street - provides access from principal arterials
7T
ST.
HA
• Narrow street mostly used by local residents
ON
VE
DIS
• Neighborhood Greenway desgnation - pedestrian friendly, MA
.
6T
large amount of tree canopy coverage
HA
E
SIT
VE
OM
.
T. R
COLUMBIA STREET: NS KF
5T
AR
IO AL
HA
• Access Street - provides access from minor arterials M E W
T
VE
• Narrow, cobblestone street used mostly by local residents I NU
.
5M
4T
• Steeply sloped - 15% grade
HA
ST.
VE
IA
MB
.
LU site
CO
PEDESTRIAN ZONE
6 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
Ca
pi
N
goals by several acres, making every square foot of adopted by the City of Seattle as a new approach
to
University St First Hill
lH
Park the public realm and important part of creating a to consider the right of way as a way to connect
ill
Freeway Park
S healthy, green, and lush environment for all.” The parks and public space throughout First Hill to
Seneca St Park to Park Path aims to connect Freeway Park with serve working and residential populations in the
8th Avenue
the soon to be completed Yesler Terrace Park along neighborhood. In the Plan 8th Avenue is designated
Town Hall Virginia Mason
Minor Ave
Summit Ave
Boylston Ave
Seattle Medical Center
neighborhood greenways “creating a beautiful and as a Neighborhood Greenway, a residential street
Spring St
5
Seattle First safe walking route” whichOverall Concept
showcases Plan
the many with low volume of slower-moving vehicles which
Presbyterian
Church Hotel amenities unique to the neighborhood. integrates a series of design elements that enable
8th
8thAvenue
Avenue
Sorrento
Madison St 5 22’ street at 6 Enhanced landscape 7 Additional trees of pedestrians
8 Painted and cyclists to feel
and textured 9 safe and comfortable.
ADA accessible elements
intersection and extended similar species to crosswalks and ADA consistent throughout
throughout sidewalk plantings fill canopy ramps at all intersections street
Overall
OverallConcept
Concept Plan
Marion St
Plan
SITE St. James
5 522’
22’
street
street
at at CenterEnhanced
6 6 Enhanced
Swedish First Hill
landscape
landscape 7 7Additional
Additionaltrees
trees
of of 8 8Painted
Paintedand
and
textured
textured 9 9ADA
ADAaccessible
accessible
elements
elements
7th Ave
8th Ave
9th Ave
Terry Ave
Boren Ave
Cathedral
Medical
intersection
intersection
Columbia St and
andextended
extended similar
similarspecies
species
toto crosswalks
crosswalks and and
ADA
ADA consistent
consistent
throughout
throughout Residential
throughout
throughout sidewalk
sidewalkplantings
plantings fill fill
canopy
canopy ramps
rampsat at
allall
intersections
intersections street
street Senior
Housing Residential Apartments
Frye Art Residential Future Development
Museum Apartments with Potential Open
Downtown
Central Area
Episcopal
Senior
Senior
Parish
5
Br
Housing
Housing Residential
Residential
Apartments
Apartments 8th Avenue 9
oa
James St
Future
Future
Development
Development
d
Residential
Residential
wa
Apartments
Apartments with
with
Potential
Potential
Open
Open
7
y
Space
Space Social Thift Park
Jefferson St 66 88 Parking with Resting Areas Parking/ Vacant Services Shop
Seattle University
View 55 8th
8th
Avenue
Avenue 99 Food
Park
Harborview SITE Residential Bank Church Church
Medical Center Terrace St 77 Apartments
Social
Social Thift
Thift
Parking
Parking
with
with
Resting
Resting
Areas
Areas Parking/
Parking/
Vacant
Vacant Park
Park
Services
Services Shop
Shop
5 LEGEND
James Street
Cherry Street Marion Street
Cherry Street
Residential
Residential Bank
Bank Church
Church Church
Church
Path (1.5 miles)
8th Avenue
Apartments
Apartments
Steep Path
Spruce St N
Alternative Path
Ye
sle Overall Concept Plan
Columbia Street
Columbia Street
James Street
ay Fir
Marion Street
Marion Street
Cherry Street
St P-Patch Existing Street Trees Existing Streetlights
Public Open Space
5 22’ street at 6 Enhanced landscape 7 Additional trees of 8 Painted and textured ADA accessible
9 Trees
Proposed Street Existingelements
Pedestrian Streetlights
Yesler Major Institution intersection and extended N N similar species to crosswalks and ADAActive Zones
Proposed Pedestrian Streetlights
consistent throughout
Terrace
First Hill Streetcar throughout sidewalk plantings fill canopy ramps at all intersections street
International Park
District
Yesler FIRST HILL PUBLIC REALM ACTION PLAN
8TH AVENUE
Community Little Library Existing
Existing
Street
Street
Trees
Trees
Page 36
Center Existing Streetlights
Existing Streetlights
Proposed
Proposed Street
Street Trees
Trees Existing Pedestrian
Existing PedestrianStreetlights
Streetlights
*From First Hill Improvement Association Proposed
Proposed Pedestrian
PedestrianStreetlights
Streetlights *From First Hill Public Realm Action Plan
Active
Active
Zones
Zones Residential
Senior
Housing Residential Apartments
FIRST
FIRST
HILL
HILL
PUBLIC
PUBLIC
REALM
REALM
ACTION
ACTION
PLAN
PLAN
Future Development
8TH
8THAVENUE
AVENUE
Residential Page
Page
3636
Apartments with Potential Open
Space
6 o ly8 m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
5
7
8th Avenue E A R9LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
7
URBAN DESIGN ANALYSIS
100 ft
40 ft
200 ft
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 9
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
1. SKYLINE 13
2. SINGLE RESIDENTIAL
3. GERMAN HOUSE BUILDING
4. BRIGHT HORIZONS BUILDING
5. BAY RIDGE COURT
6. TRINITY EPISCOPAL PARISH
7. NORTHWEST HARVEST BUILDING
8. WEAT SEATTLE FB
9. 7TH AND JAMES APARTMENT
10. SEAPARK GARAGE
11. SEATTLE MUNICIPAL COURT
12. SEATTLE MUNICIPAL TOWER
13. BANK OF AMERICA FIFTH AVENUE PLAZA
14. PARKING
01
11
15. PARKING 14
16. CLARWOOD APARTMENTS 15 16
17
17. ENVOY APARTMENTS
10 24
18. APARTMENT AT COLUMBIA ST. 18 19
23
19. FREDERIC OZANAM HOUSE
20. BISHOP LEWIS HOUSE
22 21 20
21. THE BRADBURY APARTMENTS SITE
09
22. UNDER CONSTRUCTION OFFICE & APT.
23. ZINDORF APARTMENTS 08
24. 7TH & COLUMBIA BUILDING 07
05
02
06
legend 03
residential
office
retail 04
restaurant / cafe
religious institution
parking
10 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
01 SKYLINE 02 single residential 03 german house 04 BRIGHT HORIZONS 05 BAY RIDGE 06 TRINITY EPISCOPAL
building BUILDING COURT PARISH
07 NORTHWEST HARVEST
BUILDING 08 WEST SEATTLE
FB BUILDING 09 7TH & JAMES
APARTMENT 10 SEAPARK
GARAGE 11 SEATTLE MUNICIPAL
COURT 12 SEATTLE MUNICIPAL
TOWER
BANK OF AMERICA
13 5TH 14 PARKING 15 PARKING 16 CLARWOOD 17 ENVOY APARTMENTS 18 apartment
AVENUE PLAZA APARTMENTS @columbia st.
19 FREDERIC OZANUM
APARTMENTS 20 BISHOP LEWIS 21 The bradbury 22 office &
apartment 23 ZINDORF APARTMENTS 24 7TH BUILDING
& COLUMBIA
HOUSE apartments
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 11
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
.
G ST
RIN
SP
9T
.
H
ST
AV
ON
DIS
8T
E.
A
HA
EM
VE
T.
.
NS
RIO
MA
09
VE
.
site 10
BO
RE
NA
TE
RR
VE
11
.
YA
VE
INT
12
ER
ST
historic landmarks
*Per Map of Designated Landmarks
12 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
PROGRAM SUMMARY
* *
Terry Avenue is a designated Green street and the Terry street
frontage is to be developed to maximize pedestrian amenities
and mitigate the expansive Terry avenue sidewalk scale to the
west. The green street will include seating, lush planting and a
highlighted sense of passage and sequencing of spaces.
OVERALL
7/ 30 total occupied levels above grade
RESPONSES
*
TO DESIGN
*
GUIDELINES RESIDENTIAL
28 levels (287 residential units approx.)
1 level lobby / fitness Planting and seating oriented in different ways create various spaces
and experiences.
1 level services
8/
*
REPRESENTATIVE
PROJECTS PARKING
4 levels below grade (234 stalls approx.)
BIKE PARKING
*
Seat walls and planting create nooks for sculptural elements and rest.
*
72 stalls
EVENT
SPECIALTY PAVING
18 - 1001 JAMES ST
*
12 - YESLER TERRACE STEAM PLANT
*
11 - HARBORVIEW MEDICAL CANTER 15 - 800 COLUMBIA ST BROADSTONE FIRST HILL
Streetscape Opposite
PLANTING
CIRCULATION
DESIGN REVIEW BOARD MEETING #2 - 3/23/16
o ly m p i c1 t o w e r | P R O J E C T # 3 0 2 8 3 5 7 13
Meandering paths create Swales offer beauty
opportunities for lush and ecological function.
Daniels Real Estate, LLC | LMN Architects PROJECT #3022893 / DESIGN REVIEW BOARD SUBMITTAL / 06.22.2016
planting and a varied
1001 JAMES STREET (DPD #3019215)
sidewalk experience.
1001 James Street Early Design Guidance (DRAFT) Meeting Date TBD ENCORE architects E A R LY D E S I G N ENCORE
GUIDANCE 12.20.2017
Alliance Realty Partners, LLC architects 2
URBAN DESIGN ANALYSIS
DESIGN C UE S
TOWER
PODIUM
14 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
OVERALL
7/ 30 total occupied levels above grade
THANK YOU!
RESPONSES
TO DESIGN
GUIDELINES RESIDENTIAL
28 levels (287 residential units approx.)
1 level lobby / fitness
PORTLAND S E A T T L E
1 level services
8/
O F F I C E O F F I C E
6720 SW MACADAM 117 S MAIN
SUITE 100 SUITE 400
REPRESENTATIVE PORTLAND, OR S E AT T L E , WA
PROJECTS PARKING 9 7 2 1 9 9 8 1 0 4
503.245.7100 2 0 6 . 576 .1 6 0 0
4 levels below grade (234 stalls approx.) A N K R O M M O I S A N . C O M
Daniels Real Estate, LLC | LMN Architects PROJECT #3022893 / DESIGN REVIEW BOARD SUBMITTAL / 06.22.2016 1
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 15
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
a’
1 : CO L UMBIA S T. FA CING T O NO R T HWEST
a site
O PPO SI T E
PR O J E C T SI T E
7th ave.
8th ave.
IMAGE BELOW
7 T H AV E N UE
8 T H AV E N UE
PARKING PA R K I N G
A - A ’ S E CT IO N
PA R K IN G PA R KING
ST REET SCAPES
2 : CO L UMBIA S T. FA CING T O S O UT HEAST
b’
site
A PPR OX I M A T E
BUILDING b
E N V E L O PE
8th ave.
7th ave.
IMAGE BELOW
8 T H AV E N UE
7 T H AV E N UE
26 STORY 3 ST O R Y
RESIDENTIAL R E T A I L & R E SI D E N T I A L
2 6 S T O RY B - B’ S E CT IO N
3 ST O R Y
RE S I D E N T I AL
R E T A I L & R E SI DE N TI A L
PR O JECT SITE
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 17
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
site
c’
OPPOSITE
PROJECT SITE
columbia st.
cherry st.
CO L UMBIA S T R E E T
CHE R RY S T R E E T
IMAGE BEL OW
PARKING 25 STO RY 4 ST O RY
RESIDEN T I A L R E SI D E N T I A L
C - C’ S E CT IO N
PR O JE CT S IT E BE HIND
18 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
URBAN DESIGN ANALYSIS
A PPR OX I M A T E
BUILDING
E N V E L O PE site
d’
cherry st.
columbia st.
CHE R RY S T R E E T
IMAGE BEL OW
2 STORY 3 ST O RY PA R K I N G
RESIDENTIAL O FFI C E
D - D’ S E CT IO N
PR OJEC T SIT E
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 19
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
E XIST ING SI T E CONDI T IONS
OPPORTUNITIES:
• 8th Avenue is a designated Neighborhood Greenway Wood Stair
• Alley allows for vehicular access that does not affect
the character of the streetscape
• Proximity to existing Skyline community creates
ability to activate streetscape through design of
public space connection between the buildings
• Steep slope of Columbia Street allows back of house
and parking uses to be tucked below grade
119.96’
119.95’
CONSTRAINTS:
8TH AVE
• Steep slope of Columbia Street creates challenge to
activate street edge through program organization
and streetscape treatment
• Creating connection between Skyline communities
for less-ambulatory residents
265.80
242.70
120.07’
20 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
E XIST ING SI T E CONDI T IONS
SIT E PH O T O S
SITE SITE
a
site
C
SITE
o ly m p i c t o w e r P R O J E C T # 3 0 2 8 3 5 7 21
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
SI T E PL AN
parking parking
area: sf area: sf
P R EL IMINA RY S I T E PLA N zoning:nc3 - 160 zoning:highrise
SKYBRI
alley DGE
8th avenue
3 story retail and
residential
zoning:nc3 - 160
Vehicular access
parking lot
resident access
3 story residential
zoning:hr
3 story office
22 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 zoning:hr
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
SI T E PL AN
S KYBRI DG E MERI T
CASCADE TOWER
9T
P U BL I C BENEFI T S U M MARY
HA
VE
.
OLYMPIC TOWER
•• Voluntary setbacks at ground level
•• Enhanced right - of - way improvements at sidewalk and
intersections
•• Park to park loop
3 - STORY RETAIL
AND RESIDENTIAL 3 - STORY
T.
8T
3 - STORY RESIDENTIAL YS
HA
R R
E
CH
VE
RESIDENTIAL
.
LEGEND
SKYBRIDGE
7T
HA
VE
.
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 23
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
SMC SECTION DESCRIPTION COMPLIANCE
ZONING DATA CHAPTER 23.41 -
DESIGN REVIEW
23.45.502 Multifamily
Z O N ING C OD E S U M M A RY Scope of Provisions, Highrise (HR)
Urban Village Overlays: First Hill Urban Village 23.45.510 8 on Lots 15,000 Square Feet or Less
TABLE B Lot is 14,400 square feet
Environmentally Critical Area: YES 40% steep slope Maximum FAR pursuant to 23.58A & 23.45.516: Base FAR of 8 = 115,200
13 for 240’ height or less
14 for greater than 240’ height Proposed height = 235’: FAR of 13 = 187,200
Proposed FAR = 135,803 = 9.4 complies
23.45.514.J.6 Elevator penthouses may extend above the applicable height limit by 16’
23.45.514.J.11 A structure may exceed the applicable height limit in the HR zone as follows: The area bounded by the facade is less than
6,500SF. so, the maximum height is 270 feet.
a. If the applicable height limit is 240 feet, the height of the structure may be increased
by 30 feet if the area bounded by the facades of the portion of the structure above 240
feet is no greater than 6,500 square feet, or if the area bounded by the facades at an
elevation that is halfway between 240 feet and the height of the structure is no greater
than 50 percent of the area bounded by the facades at a height of 240 feet.
24 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
SMC SECTION DESCRIPTION COMPLIANCE
23.45.516.C.1 Extra residential floor area may be gained in accordance with 23.58A; 24,549 SF additional FAR needed
ZONING DATA
Up to 100% of extra may be through affordable housing per 23.58A.014; Affordable housing option
Up to 40% may be through any combination of 40% of 24,549 SF = 9,820 SF
b. Neighborhood open space or payment in lieu
c. Neighborhood green street setback if allowed per 23.45.516.F b. Yes
c. Yes
23.45.516.F Neighborhood green street setback. Floor area may be gained for a neighborhood green street
MAP A setback according to the provisions of Chapter 23.58A by development on lots abutting one of
the streets or street segments within the First Hill Urban Village shown on Map A for 23.45.516.
Columbia Ave:
Up to 45’: Min 5’ / Ave >7’ provided
Over 45’: Departure requested
23.45.518.H Unenclosed decks and balconies may project a maximum of Proposed balconies comply
4 feet into required setbacks if each one is: with all requirements
1.no closer than 5 feet to any lot line;
2.no more than 20 feet wide; and
3.separated from other decks and balconies on the same facade of the
structure by a distance equal to at least ½ the width of the projection.
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 25
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
SMC SECTION DESCRIPTION COMPLIANCE
ZONING DATA 23.45.520.A HR zone width and floor size limits Complies
In HR zones, for structures over 85 feet in height, portions of structures above a Portion of building above 45’ high:
height of 45 feet are limited to a maximum facade width of 110 feet. 100’ along Columbia
1. A maximum facade width of 130 feet is permitted, provided that the average gross 100’ along 8th
floor area of all stories above 45 feet in height does not exceed 10,000 square fee
23.54.015.K Bicycle parking. (LT) long term (ST) short term 19 spaces are provided
TABLE D D residential uses:
LT- 1 per 4 units = 19 required
ST – none
Footnote 3. For congregate residences that are owned by a not-for-profit entity or charity,
or that are licensed by the State and provide supportive services for seniors or persons with
disabilities, the Director shall have the discretion to reduce the amount of required bicycle
parking if it can be demonstrated that residents are less likely to travel by bicycle.
26 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
SMC SECTION DESCRIPTION COMPLIANCE
23.54.015.A Parking required No parking required
ZONING DATA
TABLE B No Minimum Required - Use M. 76 spaces provided
All residential uses in commercial and multifamily zones within urban villages that are not Parking will be valet with semi-
within urban center or the Station Area Overlay District, if the residential use is located automated parking lifts
within 1,320 feet of a street with frequent transit service, measured as the walking distance
from the nearest transit stop to the lot line of the lot containing the residential use.
Table A says the same – Use K
76 units
26 x 4 = 104 SF + 375 SF = 479 SF
23.54.040.F Access for service providers to the storage space from the collection
location shall meet the following requirements:
2. For containers larger than 2 cubic yards and all compacted refuse containers:
a. Direct access shall be provided from the alley or street to the containers; a. Complies
b. Any gates or access routes for trucks shall be a minimum of 10 feet wide; b. Complies
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 27
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
PRIORI T Y DESIGN GUIDELINES
CS1: Natural Systems and Site Features CS2: Urban Pattern and Form PL1: Connectivity
Use natural systems and features of the site and its surroundings as a
starting point for project design.
Strengthen the most desirable forms, characteristics, and patterns of
the streets, block faces, and open spaces in the surrounding area.
COVERED AREAS
Complement and contribute to the network of open spaces
around the site and the connections among them.
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 29
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
MA SSIN G OPTI ONS
ARCHI T ECT UR AL MASSING CONCEPTS
O PT IO N S CO MPARISO N
O P T I O N 0 1 : S QU A R E TOW E R O PT IO N 0 2 : AN GLED TOW ER OP TION 03: CURVED TOW ER (P REFERR ED )
C OD E C OMP LI A NT TOW ER + BASE TOW ER M ERGE IN TO BASE
Total Gross 188,000 square feet Total Gross 187,200 square feet Total Gross 186,000square feet
OPPORTUNITIES OPPORTUNITIES OPPORTUNITIES
nn Efficiency - Maximizing floor plates creates the same overall square nn Tower shape is taller and more slender and blocks less light and views. nn Curved tower shape appears the most slender and provides maximum
footage in two less stories. daylight access.
nn Tower is set back 30 feet from neighboring property line providing
nn Simple form and strong entry. buffer. nn The tower has both a strong visual connection to the street as well as a
distinct base.
nn Distinct podium and tower elements
nn The base is pulled back to provide seating and gathering areas at street
CONSTRAINTS
level to activate the street.
nn Larger floor plates create bulky mass for the tower. CONSTRAINTS
nn Strong and dramatic corner presence.
nn Building is closer to the neighbors to the south. nn Larger podium nn Tower is set back 30 feet from neighboring property line providing buffer.
nn Larger tower massing blocks the most views and light from the nn Tower is not visually connected to the street level. nn Typical floors have 4 corner units.
neighboring buildings.
nn Units are deeper and less desirable.
DEPARTURES: Yes CONSTRAINTS
nn Facade is monolithic
nn Podium creates a strong street edge, but no areas for seating. nn More complex building form
E. E. E.
AV AV AV
H H H
8T 8T 8T
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 31
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
OP TIONS C OM PA R I S ON
i m age s wi t h o ut s k yb r i d g e f or e ac h op t io n
E. E. E.
AV AV AV
H H H
8T 8T 8T
32 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
VIEW AN ALYSIS
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 33
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
CO N C E PT 01: S QU A R E TOW E R
C OD E C OMPL I A NT
CONSTRAINTS 8TH A
VE.
nn Larger floor plates create more bulky mass for
the tower.
nn Building is closer to the neighbors to the south.
7TH AV
.
nn Larger tower massing blocks the most views and ST
R RY
light from the neighboring buildings. E
E.
CH
nn More units per floor, but units are deeper.
nn Facade is monolithic
nn Podium creates a strong street edge, but no
areas for seating.
DEPARTURES
nn No
Height: 220 FT
Total: Gross Area: 188,000FT
Unit Count: 76
Parking Count:76
E.
AV
H
8T
CO
8TH AVE LU
MBI
A
ST
.
34 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
site
02
01 02
Image without skybridge Image without skybridge
01
8TH AVE 02
8TH AVE
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 35
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
CO N C E PT 01: S QU A R E TOW E R
C OD E C OMPL I A NT level p3 floor plan
storage
mech. mech.
MAXIMUM
a HEIGHT +240’
10’ 20’
a’
parking
PROPERTY LINE
PROPERTY LINE
UNITS
AMENITY UNITS
UNITS
UNITS
storage
UNITS
UNITS
UNITS
UNITS parking
UNITS
UNITS
7’ 7’
UNITS
PARKING
parking
A - A’ section
36 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
columbia st.
8th ave.
salon
auditorium living
lounge
service
lounge units
units units units units
circulation
outdoor amenity
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 37
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
sun / shadow study
equinox- 10am equinox - 12pm equinox - 2pm
CO N C E PT 01: S QU A R E TOW E R
C OD E C OMPL I A NT
inte
inte
inte
rst
summer solstice: 21 june 2017
rst
with skybridge
rst
ate
ate
ate
sUNRISE: 5:11 AM SUNSET: 9:11 PM
8th
s
s
5
ave
t.
5
as
mbi solar declination: 23.43°
.
u
col
solar elevation at noon: 61.94°
inte
inte
solar elevation at noon: 18.91°
inte
without skybridge
rst
rst
rst
ate
ate
ate
s
s
5
5
summer solstice- 10am summer solstice - 12pm summer solstice - 2pm winter solstice- 10am winter solstice - 12pm winter solstice - 2pm
inte
inte
inte
inte
inte
rst
inte
rst
rst
with skybridge
rst
ate
ate
rst
ate
rst
ate
s
ate
s
ate
5
5
s
s
s5
inte
inte
inte
without skybridge
inte
inte
inte
rst
rst
rst
rst
ate
ate
rst
rst
ate
ate
s5
ate
s5
ate
5s
s
s5
s5
38 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
THIS PAGE INTENTIONALLY LEFT BLANK
ARCHI T ECT UR AL MASSING CONCEPTS
CO N C E PT 02: A NG L E D TOW E R
TOW E R + B A S E
7TH AV
.
level. ST
R RY
E
E.
CH
DEPARTURES
Yes
Height : 240 FT
Total Gross : 187,200 FT
Unit Count: 76
Parking Count:76
E.
AV
H
8T
CO
8TH AVE LU
MBI
A
ST
.
40 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
site
02
01 02
Image without skybridge Image without skybridge
01
8TH AVE 02
8TH AVE
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 41
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
CO N C E PT 02: A NG L E D TOW E R
TOW E R + B A S E level p3 floor plan
storage
10’ 20’ mech. mech.
MAXIMUM
a HEIGHT +240’
UNITS
AMENITY UNITS
PROPERTY LINE
a’
UNITS parking
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS parking
UNITS
UNITS
7’ 7’
UNITS
PARKING
service
parking circulation
A - A’ section outdoor amenity
42 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
columbia st.
fitness spa
lobby
8th ave.
auditorium
unit unit
living
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 43
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
sun / shadow study
equinox- 10am equinox - 12pm equinox - 2pm
CO N C E PT 02: A NG L E D TOW E R
TOW E R + B A S E
inte
inte
inte
rst
summer solstice: 21 june 2017
rst
with skybridge
rst
ate
ate
ate
sUNRISE: 5:11 AM SUNSET: 9:11 PM
8th
s
s
5
ave
t.
5
as
mbi solar declination: 23.43°
.
u
col
solar elevation at noon: 61.94°
inte
inte
solar elevation at noon: 18.91°
inte
without skybridge
rst
rst
rst
ate
ate
ate
s
s
5
5
summer solstice- 10am summer solstice - 12pm summer solstice - 2pm winter solstice- 10am winter solstice - 12pm winter solstice - 2pm
inte
inte
inte
inte
inte
rst
inte
rst
rst
with skybridge
rst
ate
ate
rst
ate
rst
ate
s
ate
s
ate
5
5
s
s
s5
inte
inte
inte
without skybridge
inte
inte
inte
rst
rst
rst
rst
ate
ate
rst
rst
ate
ate
s5
ate
s5
ate
5 s
s
s5
s5
44 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
THIS PAGE INTENTIONALLY LEFT BLANK
ARCHI T ECT UR AL MASSING CONCEPTS
7TH AV
.
nn Typical floors have 4 corner units. ST
R RY
E
E.
CH
CONSTRAINTS
DEPARTURES
YES
Height : 240 FT
Total Gross : 185,000 FT
Unit Count: 76
Parking Count: 76
E.
AV
H
8T
CO
8TH AVE LU
MBI
A
ST
.
46 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
site
02
01 02
Image without skybridge Image without skybridge
01
8TH AVE 02
8TH AVE
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 47
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
12/5/2017 2:30:30 PM
GENERAL NOTES - FLOOR PLANS
1.
2.
REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK.
PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH
NOT FOR
3.
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
REFERENCE SLAB PLANS FOR CONCRETE WALL LOCATIONS, UNO. COORDINATE WITH STRUCTURAL CONSTRUCTION
DRAWINGS.
4. SEE SHEETS A0.21 & A0.31 FOR WALL ASSEMBLIES.
5. SEE SHEET Ax.xx FOR TYPICAL FRAMING AND ACOUSTICAL DETAILS.
6. SEE FIRE/LIFE SAFETY SHEETS BEGINNING ON G2.xx FOR LOCATIONS OF FIRE EXTINGUISHER CABINETS.
7. SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS.
8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES.
CO N C E PT 03:
1014 HOWARD STREET
SAN FRANCISCO, CA 94103
C U RV E D TOW E R (PR E F E RR E D )
T 415.252.7063
© ANKROM MOISAN ARCHITECTS, INC.
12/5/2017 2:37:40 PM
NOT FOR
CONSTRUCTION
MAXIMUM
a HEIGHT +240’
UP
mech
PROPERTY LINE
UNITS
storage
12/5/2017 2:30:31 PM
UNITS AMENITY 38 NORTHWEST DAVIS, SUITE 300
GENERAL NOTES - FLOOR PLANS
1.
2.
REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK.
PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH
NOT FOR
PORTLAND, OR 97209
a’ CONSTRUCTION
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
T 503.245.7100 3. REFERENCE SLAB PLANS FOR CONCRETE WALL LOCATIONS, UNO. COORDINATE WITH STRUCTURAL
DRAWINGS.
UNITS
4. SEE SHEETS A0.21 & A0.31 FOR WALL ASSEMBLIES.
OLYMPIC TOWER
1505 5TH AVE, SUITE 300 5.
6.
SEE SHEET Ax.xx FOR TYPICAL FRAMING AND ACOUSTICAL DETAILS.
SEE FIRE/LIFE SAFETY SHEETS BEGINNING ON G2.xx FOR LOCATIONS OF FIRE EXTINGUISHER CABINETS.
SEATTLE, WA 98101 7. SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS.
8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES.
T 206.576.1600
parking
Transforming Age
1014 HOWARD STREET
SEATTLE, WA
715 8TH AVE
UNITS
SAN FRANCISCO, CA 94103
T 415.252.7063
38 NORTHWEST DAVIS, SUITE 300
© ANKROM MOISAN ARCHITECTS, INC. PORTLAND, OR 97209
T 503.245.7100
UNITS
SEATTLE, WA 98101
T 206.576.1600
UNITS
UNITS
1/8" = 1'-0"
PLAN
storage DN
UP
UNITS
UNITS
parking
UNITS
OLYMPIC TOWER
12/5/2017 2:30:31 PM
GENERAL NOTES - FLOOR PLANS
Transforming Age
1. REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK.
2. PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
CONSTRUCTION
SEATTLE, WA
715 8TH AVE
3. REFERENCE SLAB PLANS FOR CONCRETE WALL LOCATIONS, UNO. COORDINATE WITH STRUCTURAL
DRAWINGS.
4. SEE SHEETS A0.21 & A0.31 FOR WALL ASSEMBLIES.
5. SEE SHEET Ax.xx FOR TYPICAL FRAMING AND ACOUSTICAL DETAILS.
6. SEE FIRE/LIFE SAFETY SHEETS BEGINNING ON G2.xx FOR LOCATIONS OF FIRE EXTINGUISHER CABINETS.
UNITS
7. SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS.
8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES.
OLYMPIC TOWER
SEATTLE, WA 98101
T 206.576.1600
7’ UNITS 4’
Transforming Age
AMENITY LEVEL P2 FLOOR
SEATTLE, WA
715 8TH AVE
PLAN
DATE
09.25.17
PROJECT NUMBER
164990
amenity
SHEET NUMBER
LOUNGE 1 P2 PARKING
REVISION DATE REASON FOR ISSUE
A2.01
amenity
1/8" = 1'-0" PROJECT
COLUMBIA ST.
SIDEWALK AUDITORIUM DN
UP
residential
MECH
C:\Users\norikoi\Documents\164990-17-SKYLINE2_17-0925_Schematic Pricing Set_norikoi.rvt
8' - 6"
AVERAGE entertainment
mech
6' - 8"
MECH
PARKING GRADE PLANE mech mech
MECH
BUILDING SECTION service
OLYMPIC TOWER
parking
circulation
Transforming Age
SCHEMATIC PRICING
SEATTLE, WA
715 8TH AVE
SET
A - A’ section DATE
09.25.17
PROJECT NUMBER
164990 outdoor amenity REVISION DATE REASON FOR ISSUE
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 315 7 2
SHEET NUMBER
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
LEVEL P1 FLOOR
PLAN
SCHEMATIC PRICING
12/5/2017 2:30:32 PM
12/5/2017 2:30:34 PM
GENERAL NOTES - FLOOR PLANS GENERAL NOTES - FLOOR PLANS
1.
2.
3.
4.
5.
6.
7.
REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK.
PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
REFERENCE SLAB PLANS FOR CONCRETE WALL LOCATIONS, UNO. COORDINATE WITH STRUCTURAL
DRAWINGS.
SEE SHEETS A0.21 & A0.31 FOR WALL ASSEMBLIES.
SEE SHEET Ax.xx FOR TYPICAL FRAMING AND ACOUSTICAL DETAILS.
SEE FIRE/LIFE SAFETY SHEETS BEGINNING ON G2.xx FOR LOCATIONS OF FIRE EXTINGUISHER CABINETS.
SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS.
NOT FOR
CONSTRUCTION
1.
2.
3.
4.
5.
6.
7.
ARCHI T ECT UR AL MASSING CONCEPTS
REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK.
PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
REFERENCE SLAB PLANS FOR CONCRETE WALL LOCATIONS, UNO. COORDINATE WITH STRUCTURAL
DRAWINGS.
SEE SHEETS A0.21 & A0.31 FOR WALL ASSEMBLIES.
SEE SHEET Ax.xx FOR TYPICAL FRAMING AND ACOUSTICAL DETAILS.
SEE FIRE/LIFE SAFETY SHEETS BEGINNING ON G2.xx FOR LOCATIONS OF FIRE EXTINGUISHER CABINETS.
SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS.
NOT FOR
CONSTRUCTION
8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES. 8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES.
columbia st.
38 NORTHWEST DAVIS, SUITE 300 38 NORTHWEST DAVIS, SUITE 300
PORTLAND, OR 97209 PORTLAND, OR 97209
T 503.245.7100 T 503.245.7100
1505 5TH AVE, SUITE 300 1505 5TH AVE, SUITE 300
SEATTLE, WA 98101 SEATTLE, WA 98101
T 206.576.1600 T 206.576.1600
C ONC EP T 03:
© ANKROM MOISAN ARCHITECTS, INC. © ANKROM MOISAN ARCHITECTS, INC.
C U RV ED T OWER ( P R EFER R ED )
ground floor plan level 4 floor plan T OWER MER GE INT O B ASE
LOUNGE
LIBRARY LOUNGE
UP
DN
UP UP
8th ave.
UP
12/5/2017 2:30:35 PM
12/5/2017 2:30:33 PM
SALON SPA
GENERAL NOTES - FLOOR PLANS GENERAL NOTES - FLOOR PLANS
1. REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK. NOT FOR 1.
2.
REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK.
PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH
NOT FOR
2. PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
CONSTRUCTION 3.
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
REFERENCE SLAB PLANS FOR CONCRETE WALL LOCATIONS, UNO. COORDINATE WITH STRUCTURAL CONSTRUCTION
OLYMPIC TOWER
OLYMPIC TOWER
3. REFERENCE SLAB PLANS FOR CONCRETE WALL LOCATIONS, UNO. COORDINATE WITH STRUCTURAL
DRAWINGS.
DRAWINGS.
auditorium
4. SEE SHEETS A0.21 & A0.31 FOR WALL ASSEMBLIES.
4. SEE SHEETS A0.21 & A0.31 FOR WALL ASSEMBLIES.
5. SEE SHEET Ax.xx FOR TYPICAL FRAMING AND ACOUSTICAL DETAILS.
5. SEE SHEET Ax.xx FOR TYPICAL FRAMING AND ACOUSTICAL DETAILS.
6. SEE FIRE/LIFE SAFETY SHEETS BEGINNING ON G2.xx FOR LOCATIONS OF FIRE EXTINGUISHER CABINETS.
6. SEE FIRE/LIFE SAFETY SHEETS BEGINNING ON G2.xx FOR LOCATIONS OF FIRE EXTINGUISHER CABINETS.
7. SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS.
7. SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS.
Transforming Age
Transforming Age
8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES.
8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES.
SEATTLE, WA
SEATTLE, WA
Living
PORTLAND, OR 97209
PORTLAND, OR 97209
T 503.245.7100
T 503.245.7100
level 2 floor plan typical floor plan LEVEL 1 FLOOR PLAN LEVEL 4 FLOOR PLAN
1 LEVEL 1 4
09.25.17 164990 09.25.17 164990
SHEET NUMBER SHEET NUMBER
1/8" = 1'-0" 1/8" = 1'-0"
PROJECT
A2.03 PROJECT
A2.06
DN
UP
UP
unit unit
OLYMPIC TOWER
OLYMPIC TOWER
10/16/2017 9:10:23 AM
12/5/2017 2:30:36 PM
GENERAL NOTES - FLOOR PLANS GENERAL NOTES - FLOOR PLANS
NOT FOR NOT FOR
DN
Transforming Age
Transforming Age
1. REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK. 1. REFER TO SHEET A0.01 FOR 'PROJECT NOTES' APPLICABLE TO ALL PORTIONS OF THE WORK.
2. PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH 2. PRIOR TO FRAMING VERIFY THAT FINAL APPLIANCE AND PLUMBING FIXTURE SIZES/CLEARANCES MATCH
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
CONSTRUCTION CONSTRUCTION
SEATTLE, WA
THOSE USED AS BASIS OF DESIGN SHOWN ON DRAWING Ax.xx.
LIVING
7. SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS. 7. SEE ENLARGED PLANS FOR DETAILED DIMENSIONS, WALL TAGS AND DOOR TAGS.
8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES. 8. REFER TO STRUCTURAL DRAWINGS FOR COLUMNS, SHEAR WALL AND BEAM SIZES.
1 LEVEL 8
DATE PROJECT NUMBER
1 LEVEL 2
DATE PROJECT NUMBER
09.25.17 164990
unit
09.25.17 164990
SHEET NUMBER
SHEET NUMBER
1/8" = 1'-0"
1/8" = 1'-0"
A2.04 A2.08
unit unit unit amenity
PROJECT
PROJECT
unit
residential
UP
entertainment
unit
LOUNGE unit service
OLYMPIC TOWER
OLYMPIC TOWER
unit unit unit circulation
Transforming Age
Transforming Age
SEATTLE, WA
SEATTLE, WA
715 8TH AVE
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 49
990-17-SKYLINE2_17-0925_Schematic Pricing Set_norikoi.rvt
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
LEVEL 3 FLOOR LEVEL 20 FLOOR
PLAN PLAN
inte
inte
inte
rst
rst
with skybridge
rst
summer solstice: 21 june 2017
ate
ate
ate
sUNRISE: 5:11 AM SUNSET: 9:11 PM
s
8th
s
s
5
5
ave
t.
as
mbi solar declination: 23.43°
.
u
col
solar elevation at noon: 61.94°
inte
inte
inte
solar elevation at noon: 18.91° without skybridge
rst
rst
rst
ate
ate
ate
s
s
5
5
summer solstice- 10am summer solstice - 12pm summer solstice - 2pm winter solstice- 10am winter solstice - 12pm winter solstice - 2pm
inte
inte
inte
inte
inte
rst
inte
rst
rst
with skybridge
rst
ate
ate
rst
ate
rst
ate
s
ate
s
ate
5
5
s5
s5
s5
inte
inte
inte
without skybridge
inte
inte
inte
rst
rst
rst
rst
ate
ate
rst
rst
ate
ate
s
ate
s
ate
5
5
s
s
s
5
5
50 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
THIS PAGE INTENTIONALLY LEFT BLANK
ARCHI T ECT UR AL MASSING CONCEPTS
01: code compliant base allowable massing 02: smaller floor plates = taller and more slender tower
03: shifting a tower core for podium program elements 04: tower shape and enhance verticality
52 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL MASSING CONCEPTS
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 53
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
M AT E R I A L E X A M P L E S
ARCHI T ECT UR AL CONCEPTS 1. WINDOW SYSTEM
Silver Mullions with Clear Glass
2. MECHANICAL PENTHOUSE
MAT E RIA LS Ventilated Louver Panels
01: ALUMINUM WINDOW WALL SYSTEM WITH 02: MECHANICAL PENTHOUSE SCREEN
3. SILVER MULLIONS WHITE 4. WOOD SOFFIT
DriDesign Metal Panel
5.
01
site
01
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 55
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL CONCEPTS
02
site
02
56 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
ARCHI T ECT UR AL CONCEPTS
03
site
03
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 57
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
L ANDSCAPE CONCEPTS
LAND SC A PE CONT E XT
SKYLINE II
BISHOP
LEWIS
8TH AVE.
HOUSE
SKYLINE I
Skyline I
58 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
L ANDSCAPE CONCEPTS
Water wall
stormwater feature
New curb ramps COLUMBIA ST.
and crosswalks
Ramp with
handrails
DESIGN APPROACH:
Stormwater planters Canopy above
w/ patio above
SKYLINE I • Tie sites into Park to Park Loop and
Green Street concept plan
2
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 59
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
L ANDSCAPE CONCEPTS
LAND SC A PE S E CT I ONS
Existing condition
60 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
L ANDSCAPE CONCEPTS
Existing condition
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 61
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
L ANDSCAPE CONCEPTS
P R ECED E NT IM A GE S - S T R E E T S CAP E
62 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
L ANDSCAPE CONCEPTS
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 63
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
departures
DEPART URES
The following design guidelines will be better supported: CS2.B, PL1.A, DC1.A, DC1.C
The following design guidelines will be better supported: CS2.B, PL1.A, DC1.A, DC1.C
The following design guidelines will be better supported: PL1.A, DC2.B.1; DC2.D.1
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 65
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
DEPART URES
PARKING AISLES
SMC 23.54.030..E
Parking aisle width shall be provided according to the 240 FT HEI GHT L I MI T
requirements of Exhibit C for 23.54.030:
• Parking angle: 90 degrees = Aisle Width: 22.0 feet COL UMBI A ST. A
DEPARTURE REQUEST
25’ - 10”
7’
10’
ELECTRICAL VAULT
P208
ELECTRICAL
min. to provide
1201 SF
8TH AVENUE
FIRE PUMP
UP P209
DN
23’ - 8”
spaces including providing Seattle City Light vault
486 SF
ALL EY
120’
FOOTPRI NT B
DN
16’ - 10”
min. drive aisle typ. drive aisle
19’ - 2”
of the parking from the streetscape while creating a width (departure) width (departure)
generous pedestrian experience along the 8th Avenue
designated green street that wraps the corner to
20’
Columbia Street with active interior spaces along these
7’
edges. Valet parking is used for all parking on site min. parking
39’ - 6”
minimizing conflicts that could otherwise arise from AL L OWABLE FOO TP R I NT stack dimension
individual resident parking. UP 45 FT
7’
1 departure
The following design guidelines will be better
10’ 10’
request area
supported: CS2.B, PL1.A, DC1.A, DC1.C 120’
LEVEL p2
Lot line that abuts neither a street nor For portions of a structure:
alley • 45 feet or less in height: 7-foot average setback; 5-foor minimum setback, except that no setback is
required for portions abutting an existing structure built to the abutting lot line;
• Greater than 45 feet in height: 20-foot minimum setback
66 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
DEPART URES
Property Line
Property Line
Average Setback (<45’)
Setback (45’+)
DEPARTURE REQUEST
11,362 sf Project proposes reduced setback on lot line that abuts
neither a street nor alley of 4-feet. Building footprint
B has been reduced to the extent possible while meeting
108’ - 0”
LEVEL 1
10' 20'
7' 7'
45’ Podium
legend
Varies due to Columbia Street slope
(see Departure 2)
5'
63’ - 6”
40’ - 0”
section a
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 67
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
DEPART URES
greater than 45’ in height greater than 45’ in height
74’ - 6”
100’ - 0”
3’ - 0”
than 45 feet in height A
SMC 23.45.518
Lot line abutting a street: 10-foot minimum setback
Lot line abutting an alley: 10-foot minimum setback
Lot line abuts neither a street nor alley: 20-foot minimum
setback A
A
90’ - 0”
7,223 sf
alley
108’ - 0”
90’ - 0”
DEPARTURE REQUEST
Project proposes that podium extends into the setback
limits for the portion of the building greater than 45
feet in height along a portion of the lot line abutting
Columbia Street, a portion of the lot line abutting the 9,000 sf
A
adjacent property, and along the lot line abutting the
2
alley a maximum of 17’-5”.
The proposed departure allows the project to provide B
15’ - 0”
a generous entry and pedestrian experience along
the 8th Avenue designated green street. The datum
line created in designing this primary building entry D E PA R T U R E R E Q U E S T A R E A
emphasizes the human scale of this space and carries
throughout the design of all facades, creating an
1’ - 6”
architectural composition which establishes a strong
17’ - 5”
podium.
legend • 45 feet or less in height: 7-foot average setback; 5-foot minimum setback, except that no setback is
required for frontages occupied by street level uses or dwelling units with a direct entry from the street;
• Greater than 45 feet in height: 10-foot minimum setback
potential development volume not in use
A (9,000 SF - 7,223 SF) X 189’ - 0” = 335,853 cubic feet
Lot line abutting an alley Rear lot line abuts an alley:
departure request area For portions of a structure:
1 17,544 CUBIC FEET • 45 feet or less in height: no setback required
2 16,705 CUBIC FEET • Greater than 45 feet in height: 10-foot minimum setback
1 + 2 = 34,249 cubic feet
Lot line that abuts neither a street nor For portions of a structure:
alley • 45 feet or less in height: 7-foot average setback; 5-foor minimum setback, except that no setback is
required for portions abutting an existing structure built to the abutting lot line;
• Greater than 45 feet in height: 20-foot minimum setback
68 o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
DEPART URES
Property Line
Property Line
Average Setback (<45’)
Setback (45’+)
a a
a
189’
240’
POTENTIAL
DEVELOPMENT
AREA NOT IN USE
10' 10'
7'
8TH AVENUE
REQUEST AREA 45’ Podium
E
NU 2
45'
VE
HA
8T
45'
LEVEL 1 (254’-10”)
Avg Grade Plane (254’-5”)
2' 16'
4 STORY APARTMENTS
CO
LU M
BIA Y
STR LE
EE T AL
section B
o ly m p i c t o w e r | P R O J E C T # 3 0 2 8 3 5 7 69
E A R LY D E S I G N G U I D A N C E 1 2 . 2 0 . 2 0 1 7
PORTLAND SEATTLE SAN FRANCISCO
38 NW Davis Street 1505 5th Avenue 1014 Howard Street
Suite 300 Suite 300 San Francisco, CA 94103 © 2017
Portland, OR 97209 Seattle, WA 98101 Nothing shown here may be reproduced in any way
T 503.245.7100 T 206.576.1600 T 415.252.7063 without the consent of Ankrom Moisan Architects. www.ankrommoisan.com