This Detail design is applicable for the following substations
Applicable Substation
Sub Station Name Feeder No. Key SLD
Umm Ebairiya (UEBYA) B13, B23 PH13-5C-18-01-0501
Abu Hamour West (AHUMW) B13, B23 PH13-5C-52-01-0501
B B
C C
QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE - 13 SUBSTATIONS
PACKAGES – S2, S6 & S11
Time: h:19:48 tt
Date: M/d/2017
Priority-3
Sub Station Name Feeder No. Key SLD
Um Al Amad-1 (UMAM1) B13, B23 PH13-5C-XX-01-0501
SUBSTATION/CIRCUIT NAME: - PROJECT DRAWING NUMBER:
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
0 - 11/07/2017 Issued For Comments PS PS MJU
REV. STATUS DATE DESCRIPTION DRWN CHKD APPD
CopyRight (C) Siemens Limited, India All Rights Reserved.
Reference document
E E
LCC Schematics PH13-5C-10-13-0013
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL
(3)-G719EA-JG9191-U3013
B13_66kV Bus Coupler Protn. Schematics