Details Earthworks Concrete Quantities (m3)

Base slab Preparation of Berm


of pipe Length Width Height Filling
Location Chainage ø (mm) width Excavated Excavation Blinding Conc. Pedestals Base slab walls Roof Slab
(m) (m) (m) (m3)
(m) Materials (m2) (m3)

thickness Vol Qty Dim Vol thickness Vol thickness Vol thickness
4+554 610 78.92 3.01 2.31 4.11 324.36 1071.73 262.01 0.075 24.92 8.00 0.50 x 0.50 3.66 0.25 81.09 0.25 91.15 0.35
Section 09 4+590 762 78.87 3.16 2.46 4.26 335.99 558.40 45.74 0.075 25.79 8.00 0.50 x 0.50 4.57 0.25 84.00 0.25 97.09 0.35
4+600

Quantities 660.35 1630.13 307.75 50.71 8.23 165.09 188.24

Details Earthworks Concrete Quantities (m3)

Preparation of Berm
Location ø of pipe length width height Base slab m Excavated Filling Blinding Conc. Pedestals Base slab walls RoofSlab
Excavation
Materials

thickness Vol Qty Dim Vol thickness Vol thickness Vol thickness
14+149.00 406 95.45 2.81 2.11 3.91 373.21 943.43 95.45 0.075 28.71 9.55 0.50 x 0.50 2.91 0.25 93.30 0.25 100.51 0.35
14+165.43 457 95.45 2.86 2.16 3.96 377.98 988.57 95.45 0.075 29.06 8.00 0.50 x 0.50 2.74 0.25 94.50 0.25 102.94 0.35
Section 13 14+176.50 914 95.45 3.31 2.61 4.41 420.93 1500.27 136.49 0.075 32.29 8.00 0.50 x 0.50 5.48 0.25 105.23 0.25 124.75 0.35
14+197.00 914 95.45 3.31 2.61 4.41 420.93 1731.46 152.72 0.075 32.29 8.00 0.50 x 0.50 5.48 0.25 105.23 0.25 124.75 0.35
14+200.00

Quantities 1593.05 5163.73 480.11 122.35 16.62 398.26 452.95

TOTAL QUANTITIES 2,253.40 6,793.86 787.86 173.06 24.85 563.35 641.19


Filling Finishing Water proofing
Reinforcements (t) Formworks (m2) (m3) (m2) (m2)

Padding water proofing for 6mm thick


Roof Slab Base slab walls Roof Slab Pedestals Base slab walls Roof Slab Material/Dune Bituthene
membrane
1000 screed below raft vertical
Sand slab/Screeding protection board

Vol
96.95 9.73 10.94 11.63 18.64 41.52 731.53 333.48 522.01 1060.68 324.36 364.61
101.09 10.08 11.65 12.13 22.29 41.57 779.17 345.31 573.45 1107.97 335.99 388.36

198.04 19.81 22.59 23.76 40.93 83.09 1510.70 678.79 1095.46 2168.65 660.35 752.97

Filling Finishing Water proofing


Reinforcements (t) Formworks (m2) (m3) (m2) (m2)

Padding water proofing for 6mm thick


RoofSlab Base slab walls RoofSlab Pedestals Base slab walls RoofSlab Material/Dune Bituthene
membrane
1000 screed below raft vertical
Sand slab/Screeding protection board

Vol
110.45 11.20 12.06 13.25 16.40 49.68 806.18 383.53 548.79 1204.96 373.21 402.04
112.15 11.34 12.35 13.46 14.97 49.71 825.70 388.42 569.82 1224.43 377.98 411.77
127.42 12.63 14.97 15.29 25.94 49.93 1000.64 432.20 758.75 1398.92 420.93 499.01
127.42 12.63 14.97 15.29 25.94 49.93 1000.64 432.20 758.75 1398.92 420.93 499.01

477.44 47.79 54.35 57.29 83.24 199.25 3633.16 1636.35 2636.11 5227.22 1593.05 1811.83

675.48 67.60 76.94 81.05 124.17 282.34 5,143.86 2,315.14 3,731.57 7,395.87 2,253.40 2,564.80