2017 M022
3
Stages Cycle Time M/C M/P Perameter
(1)OPERATION TYPE:
SPM=22 250T 1-Operator
Progressive SemiAuto(F)
Nos(11*2) -SEYI & 1-Helper
(2)Shut Height : 349.9 mm
M020
Updation Date 17.02.2017 lower
4
Muffler
M020 CHILD PARTS
5
Stages Cycle Time M/C M/P Perameter
Pcs/Min :32 (1)Operation Type : Semi-Auto
L: 110T- 1-Operator (2)Die Height : 324.7 mm
Progressive
M: AIDA & 1-Helper (3)Pitch Setting Feeder:
U: 66.90mm
100% Visual
Inspection
Pakaging
Updation Date 03.02.2017 M020 AIR
7 EXCTRACTOR
Stages Cycle Time M/C M/P Perameter
Pcs/Min :07
L: AIDA:1 1-Operator (1)Operation Type : Manual
Compound
M: 10T & 1-Helper (2)Die Height : 340 mm
U:
120-130/
Oiling 2-Helper Rust Guard P201
40Sec
Rust guard
2-Helper
P201
Oiling
Gauge
checking
16Nos / Min 1 Helper
100% From
Side & Lug
Visual
Inspection
Packing
Updation Date 03.02.2017 BAJAJ
M0169 FLANGE
2-Helper
3-4 Min/
Oiling 200-250 Exxsol + Ferrocot
Nos
Packing
Updation Date:12.02.2017 BASE
M0201 FOOT
Stages Cycle Time M/C M/P Perameter
Filing/ SPM=16(F)
1-Operator
papering SPM=20(P)
Pcs/ty:45/lo
Vibro- (1)Total Cycle Time: 45
t
Finishing + 2-Helper Min(Auto)
Auto in c&c
Dryer (3)Max No. of Qty.: 2000-2100
vibrator
Pakaging
Updation Date:13.02.2017 M0135 HONDA
M0158 SUPPORT
Stages Cycle Time M/C M/P Perameter
(1)Operation Type : SemiAuto
Pcs/Min :
(F)
25
250T 1-Operator (2)Die Height : 712.5 mm
Progressive L:
SEW 1-Helper (3)Pitch Setting Feeder:
M:
42.70 mm(Actual:43)
U:
Pcs/Min :
13
80T (1)Operation Type : Manual
Hole Piercing L: 1-Operator
SEYI (2)Die Height : 277.6 mm
M:
U:
Pcs/Min :
50
1 mm Profile
L: 1-Helper
Gauge
M:
U:
Pcs/ Min:32
200-
Vibro- 250Nos
vibro
Finishing L:2 Min
M: 25 Min
U:5 Min
1-Operator
+
2 Min/ 200- 1-Helper
250Nos
Rust Guard
L:
P201
M:
U:
Exxsol TM 80 &
1-1.20 Min /
Oiling Exxsol TM 80 + Ferrocote
200-250Nos
5856
100% Visual
1 Min/7 Nos
Inspection
1-Helper
14 Nos /
Punching Due to hole Missing
Minute
Pakaging
Updation Date:16.01.2017
M0008 Seal
Pcs/Min :
(1)Operation Type : SemiAuto(F)
13
250T 1-Operator (2)Die Height : 378 mm
Draw L:
SEYI 1-Helper (3)HOS: 3.90-3.94Kg/cm2
M:
(4)Pitch Setting Feeder: 260mm
U:
Pcs/Min :
12
(1)Operation Type : Manual
SEMIDRAW L: 160T 1-Operator
(2)Die Height : 441.7 mm
M:
U:
Pcs/Min : 8
(1)Operation Type : Manual
L: 1-Operator
STAMPING 80T (2)Die Height : 308.9 mm
M: 1-Helper
(3)Storage: Chute Available
U:
Pcs/Min : 8
L: 100T- Manual
BENDING 1-Operator
M: Godrej -there is No Any Detail Available
U:
Pcs/Min:12
L: 110T- 1-Operator (1)Operation Type : Manual
SIZING
M: Aida 1-Helper (2)Die Height : 293.7mm
U:
100% OD
1 Min/18 Nos 1-Helper
CHECKING
100% Visual
1 Min/16 Nos 1-Helper
Inspection
Pakaging
Updation Date:16.02.2017
M0211PIPE BUSH
3 -3.5 Min/
Rust Guard-
150-200 Tank 1-Helper
P201
Nos (1)Operation Type : Manual
(2)Die Height : 444.8 mm
(3)Crusion Pressure: 2.17
Kg/cm2
(4)Balancer Press:
Round Pcs/Min: 160T
1-Operator 3.70Kg/cm2
Forming 9 SEYI
(5)Clutch Pressure:5.02
kg/cm2
(6)HOS: 3.66 Kg/cm2
(7)Storage: Trolly in Proper
Way
(1)Operation Type : Manual
(2)Die Height : 347 mm
Sizing & (3)Crusion Pressure: 2.0
Pcs/Min: 110T 1-Operator
Tuf drawn Kg/cm2
11 AIDA 1-Helper
oiling 100% (4)Balancer Pressure: N.A
(5)Clutch Pressure: 4.5-5 Mpa
(6) Oil: Tufdraw 1730R
(1)RPM: 350
(2)Chuck Press:10 kg/cm2
Chemfering 2 Nos/30 s (3)Gauge Pressure :36 Kg/cm2
CNC 1-Operator
-CNC 1 Nos /40 s
(4)Tail stock Pressure: N.A
(5)Feed:
100% ID Remarks:
5 Nos /
Gauge Visual 1-Helper
Minute
Cheaking
Height Remarks:
1 Nos / 3 Sec 1-Helper
Checking