Sie sind auf Seite 1von 31

• DISTRIBUTION NETWORK OPERATION

GUIDELINES & CO-


CO-ORDINATION WITH
SYSTEM CONTROL

• FUNCTIONS OF CONTROL ROOM IN SAFE


OPERATIONAL PRACTICES.
Presentation By
Ranjit Mukherjee
Sr. Control Engineer, System Control
On 06.09.2011
Different Voltage Levels of CESC Power System
BBGS U#3 ~
16.5/220 kV BBGS U#1&2
220 kV ~ IMPORT
TGS
220/132/33 kV 16.5/132 kV SGS
132 kV ~
~ NCGS 10.5/33 kV
132/33 kV
33 kV

33/11 kV 33/20 kV

11 kV
33 kV 20 kV
11/0.4 kV 33/6 kV CONSUMER CONSUMER
6/20 kV
400/230 V LT CONSUMER 6 kV
CONSUMER
6/0.4 kV 6/3.3 kV

3.3 kV
400/230 V LT
CONSUMER

CONSUMER CONSUMER
Different voltage levels for
consumers
• 33 kV : Metro, Airport, Electro Steel Casting,
Metal & Steel Factory etc.
• 20 kV : Bata Shoe, Caledonian JM, Cheviot JM
• 11kV
11kV:: RN Tagore Hospital, Satyajit Ray TV &
Film Institute etc.
• 6 kV : Jadavpur Engineering College etc.
• 3.3 kV : Auckland JM, Hoogly JM, Jagatdal JM,
Anglo Indian JM, Alliance JM.
PREVIOUS PRACTICE
• CESC Primary Distribution Network(20/11/6/3.3 kV)
was drawn on plastic plates by permanent ink.

• Permanent and temporary isolations were marked with


red ink and pencils respectively.

• Relevant operational information are noted on Plastic


Plateswith pencils.

• Augmentation of network was incorporated in plastic


plate by shifting/deleting/redrawing manually.
LIMITATIONS
• Fading out of temporary isolation marks with time
• Incorporating augmentation of network was difficult
• Network drawn on plastic plate was static
• Relevant operational information were written on plastic
plate with pencil
• Identification of feeders and sources were manual and time
consuming with possibility of error.
• Simultaneous viewing of one particular network was not
possible.
• Handling plastic plates was physically inconvenient
• Non--availability of latest network status at other locations
Non
• Additional requirement of updating Diagram Books
BENEFITS
• Digitisation of Primary Distribution Network
• Establishing Electrical Connectivity of entire
network
• Facility of Manual/Online Updation under multiuser
environment with provision of event logging
• Provision for Dynamic Colour Coding of network
• Provision for Remote Terminals in view only mode
• Provision for Alphabetical Searching of installations
• Identification of feeders through Tracing function
• Use of Note for writing relevant operational
information
• Application of Jumper/Ground/Cut
BENEFITS (Contd.)
• Provision for maintaining Essential and Not Updated
status of feeders
• Availability of D/S wise list of abnormal isolations
• High speed and flexibility in operation
• Reliability and dependability of highest order
• Flexibility for integration of future Distribution
SCADA
• Availability of Trigger Report and Equipment Out of
Service Report
• Availability of Database for Consumers and Sources
DMS CONFIGURATION
• Software - Siemens Proprietary Sinaut Spectrum
4.5
• Operating System - Solaris version 8.0
• Hardware Configuration - consists of 4 number
Servers and 2 number User Interface connected
on dual LAN in distributed architecture. Each
UI is connected to 2 numbers 46'' Plasma and 1
number 24'' TFT monitor for seamless viewing
across the displays.
• 18 number Windows PCs with 24'' TFT for
remote viewing from different locations.
IMPLEMENTATION SCHEDULE
• Kick off meeting took place in April 2006
• Factory acceptance test held in September ‘06
• 85 plates were digitised and loaded in the system
• Database created and checked by CESC
Engineers
• Augmentation work scheduled in March’07
• System set for trial operation from 01.05.2007
• Change over to new system of operation since
16.06.2007 after successful trial operation .
Feel of DMS…….
• Symbols & Colour codes used in DMS
A snapshot of Rabindra Sadan D/S (Station Plane)
• Rabindra Sadan D/S (Network Plane)

ANALOG
VALUES

IMPORTANT
LISTS
• Basic Signaling Display (this window cannot be
closed)
First display to enter into the system.

CLICK
CLICK
CLICK
CLICK
• Detail Network of Rabindra Sadan D/S

NOTE

LINK
• To View a Note.
• To Operate a LINK and its effect on Network
• Providing Permit Tag on an installation.
• To search for any installation.
• Tracing a feeder from an installation.
• Reports.
Trigger Report
• Reports.
Equipment Out of Service report.
THANK YOU