 Attended Toolbox Meeting at Electrical shop.


Location :Cluster-lll
 Checked and Repaired Perimeter Lighting at Cl-3
 Checked main breaker and selector switch (put off position)
atsub 3-6.
 Megger power supply cable lighting At pole#24 (Ground fault)
 Checked Ballast and Lamp (found the are Broken)
1-  Disconnected power supply cable
Rabu Nopem-  Reconnected power supply cable 1 ea lighting at pole#24 1-11-2017
17  Test Switched on the breaker
Lighting on = (Pole#25,23,22,20,and 19).
Lighting Of =(Pole#24,27,29)
Persentage Lighting = 72 %.
 Performed Housekeeping.

 Attended Toolbox Meeting at Electrical shop.


Location :Cluster-l
 Checked control System Instrument Air Compressore Of K-103-C,
Wont Start at Cluster 1.
 Checked main breaker and control system (off position).
2-
 Test switch on the breaker and checked the control system of
Kamis Nopem- 2-11-2017
list air compressore do to the control fore keep blowing, as
17
found temperature switch to ground. As operator to call the
instrument test to repair.
 Performed Housekeeping.
 Attended Toolbox Meeting at Electrical shop.
Location :Cluster-I
 Continue checked control System Instrument Air Compressore Of K-
103-C, Wont Start at Cluster 1.
 Checked main breaker and control system (off position).
3-  checked the fuse control system do to broken and replaced new
Jumat Nopem- fuse. 3-11-2017
17  Test switch on the breaker and reset relay (all relay energize
and working good).
 Test running Instrument Air Compressor , it’s working good.
- Loading 114 psi.
- Un-loading 117 psi.
 Performed Housekeeping.

 Attended Toolbox Meeting at Electrical shop.


Location : Point-A
 Repair Lighting at Building FMM Shop.
6-
 Checked breaker (put off position ) at distribution panel II.
Nopem- 6-11-2017
Senin  Replaced 1 ea lighting at overhead lightig.
17
 Test switch on the breaker it’s working good.
 Performed Housekeeping.

 Attended Toolbox Meeting at Electrical shop.


Location :Cluster-II
 Continue Remove Old Batteries (Ex, Used UPS and ESD) at CL-2.
 Checked the breaker (put off position ) at New CCR.
Selasa 7-  Checked voltage each cell of batteries and output (zero energy).
Nopem-  Disconnected all link connection batteries ( Ex, Used UPS ) 100 7-11-2017
17 ea.
 Cleaned up CCR a Building.
 Performed Housekeeping.
 Attended Toolbox Meeting at Electrical shop.
Location :Cluster-II
 Remove Old Batteries (Ex, Used UPS and ESD ) at CL-2.
 Checked the breaker (put off position ) at New CCR.
 Checked voltage each cell of batteries and output (zero energy).
Rabu  Disconnected all link connection batteries (Ex, Used UPS ) 54
ea.
 Cleaned up of CCR Building.
8-
 Performed Housekeeping.
Nopem-
 Reconnected Power supply cable to ESD Batteries terminal (Ex, Used
17 8-11-2017
Batteries KGT-2910).
 Checked voltage each cell of batteries 2.1 V and output 118 V.
 Recharged the batteries week voltage 121 V and recorded
current 9 A (condition normal).
 Performed Housekeeping.

 Attended Toolbox Meeting at Electrical shop.


Location :Cluster-II
 Continue Remove Old Batteries (Ex, Used UPS and ESD ) at CL-2.
 Checked the breaker (put off position ) at New CCR.
Kamis  Checked voltage each cell of batteries and output (zero energy).
 Remove 52 ea Old Batteries (Ex, Used UPS ) from Cl-2 to Point-
9- A warehouse.
Nopem-  Cleaned up CCR a Building. 9-11-2017
17  Performed Housekeeping.

 Attended Toolbox Meeting at Electrical shop.


Location :Cluster-II
 Continue Remove Old Batteries (Ex, Used UPS and ESD ) at CL-2.
 Checked the breaker (put off position ) at New CCR.
10-  Checked voltage each cell of batteries and output (zero energy).
Jumat Nopem-  Remove 36 ea Old Batteries (Ex, Used UPS ) from Cl-2 to Point- 10-11-2017
17 A warehouse.
 Cleaned up CCR a Building.
 Performed Housekeeping.
 Attended Toolbox Meeting at Electrical shop.
Location :Cluster-II
 Continue Remove Old Batteries (Ex, Used UPS and ESD ) at CL-2.
 Checked the breaker (put off position ) at New CCR.
13-  Checked voltage each cell of batteries and output (zero energy).
Senin Nopem-  Remove 66 ea Old Batteries (Ex, Used UPS and ESD ) from Cl-2 13-11-2017
17 to Point-A warehouse.
 Cleaned up CCR a Building.
 Performed Housekeeping.

 Attended Toolbox Meeting at Electrical shop.


Location : Cluster-III
 Dismantled and Remove Conduit at Well C3-07.
 Test zero energy and disconnected power souce ESD system.
 Dismantled and remove 22 ea conduit from Well C3-07 to
Electrical shop.
 Performed Housekeeping.
Selasa 14- Location : Cluster-IV 14-11-2017
Nopem-  Reconnected Power Supply Cable of Heater Element
17  Checked the breaker (put off position ) at Utility Building.
 Test zero energy and Worked together with mecanical and
FMM tech to replaced element heater of (Y-402B) token from
Y-402A.
 Reconnected Power Supply Cable.
 Test switch on the breaker and run test but still not (will be
continue tomorrow.
 Performed Housekeeping.

 Attended Toolbox Meeting at Electrical shop.


Location : Cluster-III

 Dismantled and Remove Conduit at Well C3-07.


 Test zero energy and disconnected power souce ESD system.
15-  Dismantled and remove 11 ea conduit from Well C3-07 to 15-11-2017
Rabu Nopem- Electrical shop.
17  Performed Housekeeping.
 Reconnected Power Supply Cable Juckey Pump Motor of GM-109.
Location : Cluster-I
 Checked the breaker (put off position ) at Sub 1-3.
 Test zero energy and reconnected power supply cable.
 Test rotation OK (clock wise).
 Test switch on the breaker and run test, as found hight current
29 A.
- Name plate = 22 A
 Performed Housekeeping.
 Attended Toolbox Meeting at Electrical shop.
Location :Cluster-I
 Disconected Power Supply Cable Juckey Pump Motor of G-109.
 Checked the breaker (put off position ) at Sub 1-3.
 Test zero energy and reconnected power supply cable.
 Performed Housekeeping.
16- Location : Point-A.
Kamis Nopem-  Febricate Complate Set 1 ea Lighhting Fixture at Electrical Shop For 16-11-2017
17 Front Securty Building.
 Performed Housekeeping.
 Attended Toolbox Meeting at Electrical shop.
Location :POINT A
 Repair Lighting infront of Securty Building.
Jumat 17-  Checked breaker (put off position ) sub -504 17-11-2017
Okto-17  Replaced 1 ea lighting at fixture Securty Building.
 Test switch on the breaker it’s working good.
 Performed Housekeeping.

 Attended Toolbox Meeting at Electrical shop.


Location :Cluster-I
 Checked main breaker (off position) at sub 1-3
Senin  Reconnected power supply cable jockey pump Motor of GM-109 (Ex
20- Used Recorvery pump GM-427)
Nopem-  Test switch on the breaker and test solo run, recored current
20-11-2017
17 6,9 A, (it’s working good ).
- Name plate = 20,9 A/380 V
 Performed Housekeeping

 Performed PM Checked ON PGT 502 inertial seprator fan


Location :POINT A
 Checked main breaker
21-  Recorded current 8,3 A 21-11-2017
Selasa Nopem-  Visual checked on motor condition (OK)
17  Cleaned up control panel from dusty

 Disconnected power supply cable coling water fan Em-503B


Location :POINT A
 Checked the breaker (put off position ) at power plant
 Test zero energy and reconnected power supply cable.
 dismantled motor coling water fan Em-503B to electrical shop
 Performed Housekeeping.

22-
Rabu Nopem- 22-11-2017
17
 Attended Toolbox Meeting at Electrical shop.
Location :POINT A
 Checked and Repaired Swicth Breaker at Aviation Building
 Checked main breaker and selector switch (put off position) at
Aviation Building
Kamis 23-  Checked voltage input good and check voltoge output drop line 23-11-2017
Nopem- yellow and black (45 volt)
17  Replaced circuit breaker and Reconnected power supply cable
to circuit breaker
 Switched on the breaker Test switch on the breaker it’s working
good.
 Performed Housekeeping.

 Toolbox Meeting Record.


Location : Point A
Jum’at 24-  Repair Lighting infront of Securty Building 24-11-2017
Nopem-  Checked main breaker at sub 504
17  Disconnected power suply cable
 Dismantled lighting 1 ea (1000 wat) at securty building to
electrical shop
 Perfomed housekeeping
 Reconnected coling water fan EM-503 B
 Test recored current 10,1 A, (no load ) at electrical shop.
 Name plate = 20,1 A/380 V
 Performed Housekeeping.

 Toolbox Meeting Record.


Location : Point A
 Reconnected power supply and heater cable of Temporary EDG