SCOPE OF WORK

This Method Statement describes the procedure for the installation


of copper pipes for domestic water services (hot & cold) inside
buildings for the XYZ project.

PIPE STORAGE & HANDLING:

All pipes shall be stored in proper storage conditions, which are


free from dust, sunlight and extreme temperatures.
For long-term storage, the pipes shall be stacked in racks with
adequate spacing and supports & with larger diameter pipes placed
at the bottom.
While handling the pipes, care shall be taken to avoid their
coming into contact with sharp corners such as loose nail heads, sharp metal surfaces etc., as pipes may be
damaged or coatings (if any) be removed by being rubbed against these during transit.
All open ends of the pipes shall be plugged with end caps or wrapped with polyethylene sheets to prevent
entry of dust & other foreign particles.

INSTALLATION PRE REQUIREMENTS

Piping materials, fittings, supports & hangers etc used for Installations shall be in conformance to
Specifications and/or Material Approvals. Water supply pipes (hot & cold) above the ground within the buildings
shall be copper tube conforming to EN1057, (formerly BS 2871) part 1, Table X.
Copper pipes embedded in walls shall be copper tube with green colour Insulation conforming to EN1057,
(formerly BS 2871) part 1, Table Y.
Copper pipe fittings shall conform to EN1254 (formerly BS 864 part 2)
Both Hot water supply & return pipes are insulated with Preformed sections of glass fibres bonded with a heat
resistant resin together with Glass reinforced Aluminium foil. Density is 64kg/m3 for insulation (25mm) of pipes
inside buildings.
Ensure the pipes are free from dust and damages prior to installing.
Location of pipe sleeves and possible routing obstructions are checked prior to the installation of pipes.
Ensure marking of pipe routing and supports on the ceiling are clearly visible.

METHOD STATEMENT FOR INSTALLATION

All pipe routing shall be as shown on approved Shop drawings.All Pipe supports and clamps shall be installed
as per manufacturer recommendations.
Installation of all supports shall be in accordance with approved supporting detail drawings.
Where steel plates forms part of the ceiling, the suspension rods are connected to stud welded rods (which
are already stud welded to the steel plates) using threaded connectors.
Supports shall be arranged as near as possible to joints & changes in direction. Vertical rising pipes
particularly in shafts shall be adequately supported at the base to withstand the total weight of the riser.
Seismic supports for the pipes are provided, wherever required.
All pipe work shall be erected to present a neat and orderly appearance, arranged to or at right angles to the
structural members of the building, giving maximum head room and shall not obstruct windows or door ways.
All tube surfaces & Inside of fitting socket is neatly cleaned before installation.
Ensure the ends of the copper tube are cut square and remove any burrs from the inside or outside.

http://methodstatementhq.com/method-of-statement-for-installation-of-domestic-hot-cold-water-supply-copper-piping.html[3/31/2013 8:29:00 AM]


Method Of Statement For Installation Of Domestic Hot & Cold Water Supply Copper Piping | Method Statement HQ

Jointing of copper pipes & fittings of sizes 15mm to 42mm is made by Soldering, while pipes of diameter larger
than 54mm is joined by Brazing.

Copper Pipe Soldering

The inside of the fitting socket and the outside of the tube is cleaned with a cleaning pad, fine sand paper or
steel wool.
Using a brush, an adequate but not excessive amount of flux is applied to the outside of the tube and the
inside of the fitting socket. The tube is inserted to the fitting until it reaches the tube stop. Excess flux is wiped
off.
The assembly joint is heated evenly on all sides using fuel torch. Care must be taken to ensure that the tube
and fittings are properly supported with a reasonable, uniform capillary space around the entire circumference of
the joint.
When the correct temperature is reached, solder (lead free) is applied to the mouth of the fitting and the
melted solder will flow freely and be drawn into the joint by capillary action. Briefly reapply the fuel torch and
wipe off excess solder.
The joint is then allowed to cool without disturbance and cleaned generally.

Copper Pipe Brazing

 All Copper Pipes & fittings above 52mm diameter shall be jointed using the Brazing technique.
The pipe and fitting is assembled as normal.  Method of application of flux is similar to that of soldering. Filler
rod with silver content is used for brazing.

The joint shall be heated quickly and evenly on all sides to approximately 700/750o C red heat in poor
daylight. An oxy-propane, oxy-acetylene or other suitable torch is used with a large soft, neutral or slightly
reducing flame. This is kept moving through out the making of the joint to avoid excessive local heating.
The filler rod is then applied to the space between the tube and the fitting, allowing the brazing alloy to melt
and flow into the annular gap.  The gap between the socket and tube is filled with the filler alloy leaving a small,
uniform bead of brazing alloy around the mouth of the socket.
The joint is then allowed to cool without disturbance and cleaned generally.
For copper pipes (Table Y) embedded in walls the joints & elbows shall be covered with wrapping tape.
All open ends of pipes which are left as the work progresses, shall be temporarily closed with polythene sheet,
plastic caps or metal flanges, as required.
Adequate clearance shall be provided between insulated pipe work running together and between walls and
floors.

Domestic Water Piping Accessories Installation

All Domestic water-piping accessories viz., Valves, Air vents, water hammer arrestors and Pressure gauges
shall be installed as per manufacturer recommendations.
Location of all above-mentioned accessories shall be as indicated on approved Shop drawings and shall be in
accessible positions.
Flexible joints with bronze couplers shall be provided for the copper pipes at the expansion joints, as shown on
the approved shop drawings.

 Copper Pipe Insulation Procedure

 All Hot water supply & return pipes are insulated with Aluminium foil faced preformed sectional fiberglass insulation.
The Insulation thickness shall be 25mm (density 64kg/m3)

DOMESTIC WATER PIPING INSPECTION & TESTING

All piping system shall be tested to a pressure equivalent 1.5 times the maximum working pressure. The indicated
pressure shall be maintained for the required holding period without further application of pressure and without visible
leakage or a drop in the indicated pressure.

All pipe Installations shall be inspected in accordance to the Inspection test plan & checklists.

Tests shall be performed on isolated portions of piping in order to facilitate general progress of construction.

Any modification made in the Piping system after a successful test shall call for re-testing of the affected portion of
the piping system.

Results of Inspection & testing shall be recorded on the Inspection checklist forms.

HEALTH & SAFETY REQUIREMENTS

Adequate safe access to the Installation area is provided. Risk assessment will be prepared and submitted for
approval. Workmen shall wear all appropriate safety personnel protective equipment such as helmet, coverall
clothing, safety shoes, goggles & gloves, wherever required. If work is in high level, only approved scaffolding and
safety belts should be used.

REFERENCED DOCUMENTS

Shop Drawings
Material Approvals
Risk Assessment
Inspection checklist

http://methodstatementhq.com/method-of-statement-for-installation-of-domestic-hot-cold-water-supply-copper-piping.html[3/31/2013 8:29:00 AM]


Method Of Statement For Installation Of Domestic Hot & Cold Water Supply Copper Piping | Method Statement HQ

ITP
Checklists for inspection & testing

Tags: Copper Piping, Hot & Cold Water Supply, Method Of Statement, Method Of Statement For Installation Of Domestic,
Methods Statement, MST, swms

Installation Procedure for Rain Water Drainage Pipe Chilled Water Pipe Insulation Method Statement

Search Search

Common Method Statements


Method Statement For Installation of Pre Fabricated HVAC Ducts

Method Statement For Starting Up and Running Hot Water Boilers

Cable Tray Inspection & Testing Format / Sample Form

Method Statement For On Site Installation Of Diffusers, Grilles And Louvres To HVAC Ducting Systems

Installation Of Noise and Vibration Control Equipments/Isolators

Method Statement For Installation of Control Valves & Actuators for HVAC System

Installation Of MV LV Switchgear & Panels – Method Statement

Installation, Insulation & Testing Of Condensate Drain Pipes (UPVC + GI)

Method Of Statement For Installation Of Fan Coil Units And Packaged Air Conditioning Units

Cleaning and flushing of the Chilled Water Piping System

Categories
BMS

Cement & Clinker Testing

Construction Method Statements

Drainage Pipes Installation

Duct Works

Electrical

Electrical Method Statements

Health & Safety

HVAC Method Statements

Method Statement Template

Method Statements

Piping Method Statements

Piping Works

Plumbing Method Statements

http://methodstatementhq.com/method-of-statement-for-installation-of-domestic-hot-cold-water-supply-copper-piping.html[3/31/2013 8:29:00 AM]


Method Of Statement For Installation Of Domestic Hot & Cold Water Supply Copper Piping | Method Statement HQ

Pressure Testing

Sample Forms & Formats

Water Supply Piping

Working At Height

Tags
AC Ducting Method Statement Acoustic Lining Cable Termination Method Statement Construction Method Statements Construction of Ducts Drainage Piping Installation Ducts Method

Of Installation Electrical Method Statements Electrical MST Final Electrical Connections for GI Box Installation GI Conduit In The Wall HVAC Duct Work Installation Method
Statement HVAC Ductwork Insulation HVAC MST HVAC System Procedure installation Installation Methos Statement Low Voltage Cable Installation LV System Method

Statement Mechanical Method Statement method Method Of Statement Method Statement Method Statement For
Drainage Piping method statement for drainage works Method Statement For GI Box & Conduit Installation Method Statement For PVC Conduit Installation In Concrete Slab

Method Statement Template MST MST Cables & Wires MST For Conduiting Work MV Method Statement of Piping Installation Procedure PVC uPVC
Underground Above Ground Piping Risk Assessment SOP SOP For Electrical Work Standard Operating Procedure Standing Procedure for Electrical Works statement
swms Termination To MV & LV Equipment

Home
Privacy Policy
Disclaimer

Wordpress SEO Plugin by SEOPressor


Copyright © 2011 - 2012 MethodStatementHQ.Com. All Rights Reserved.

http://methodstatementhq.com/method-of-statement-for-installation-of-domestic-hot-cold-water-supply-copper-piping.html[3/31/2013 8:29:00 AM]

Das könnte Ihnen auch gefallen