Beruflich Dokumente
Kultur Dokumente
fy = 420 MPa
fc′ = 28 MPa
ϕ = 0.9
β = 0.85
S
Ratio m= = 0.75 > 0.5
L
2(Perimeter) 2(1000)(4 + 3)
h= =
180 180
h = 77.778 mm ≈ 80mm < 125 mm (minimum thickness for two way slab)
𝐡𝐦𝐢𝐧 = 𝟏𝟐𝟓 𝐦𝐦
Use 16 mm ϕ bar ≈ Ad = 201.06 mm2
Concrete Cover = 40 mm
d = h − cover − rebar ϕ = 77mm Effective Depth at Short Span
d = h − cover − rebar ϕ − (half of rebar ϕ) = 61mm Effective Depth at Long Span
DEAD LOADS
Slab self-weigh (0.125)(23.5): 2.94 kPa
Floor finish: 1.10 kPa
Ceiling finish: 0.24 kPa
Mech. duct allowance: 0.20 kPa
Electrical load: 0.05 kPa
Miscellaneous load: 1.00 kPa
Total: 5.578kPa
LIVE LOAD
Corridor above Ground floor: 3.8 kPa
WU = 1.2WUDL + 1.6WULL
WU = 1.2(5.578) + 1.6(3.8)
𝐖𝐔 = 𝟏𝟐. 𝟕𝟕𝟑 𝐤𝐍/𝐦
MOMENT CALCULATIONS:
m = 0.75, CASE 6
A = 3m
B = 4m
AT MIDSPAN AT MIDSPAN
2S1
As (mm2) S (mm) As (mm2) S (mm)