Beruflich Dokumente
Kultur Dokumente
Tel./700585334
العدد)(3
الصفحة 1
Eng./Ameer Mohammed Ali AL-Borihy Transportation Engineering-1
02242028 & معهد الروادTel.:-700585334 فً الطرقات7و3حلول تمارٌن
Problems
1- Calculate the length of transition curve and shift for
V=65kmph, R=220m, rate of introduction of super elevation is 1
in 150, W+We=7.5 m. (Hint: c=0.57) [Ans: Ls1=47.1m,
Ls2=39m (e=0.07, pav. rotated w.r.t centerline), Ls3=51.9m,
s=0.51m, Ls=52m]
solution
65*1000
v 65kmph , v 18.1m / sec.
60 * 60
80 80
C 0.571
75 V 75 65
V 2 652
e 0.0753more .than 0.07
255R 255* 220
e 0.07
v2 18.12
f e f 0.07 0.082less .than 0.15
gR 9.81* 220
e 0.07is .safe .for .65kmph
v3 18.13
Ls 1 47.2m
CR 0.571* 220
35v 2 35*18.12
Ls 52.12m
R 220
N *e 150 * 0.07
Ls 2 (W W e ) (7.5) 39.375m
2 2
2 2
Ls 52.12
s 0.51m
24R 24 * 220
65*1000
2 35* ( )
35v 60 * 60
Ls 3 51.9m
R 220
2 الصفحة
Eng./Ameer Mohammed Ali AL-Borihy Transportation Engineering-1
02242028 & معهد الروادTel.:-700585334 فً الطرقات7و3حلول تمارٌن
solution
80*1000
v 80kmph , v 22.222m / sec.
60*60
80 80
C 0.52
75 V 75 80
V2 802
e 0.057less .than 0.07
255R 255*500
e 0.0512is .safe .for .80kmph
80*103 3
( )
v3 60*60
Ls 1 42.3m
CR 0.52*500
80*103 2
35*( )
35v 2 60*60
Ls 3 34.57m
R 500
80*103
( )
nl 2 v 2*62 60*60
We 0.45m
2R 2.64 R 2*500 2.64 500
Ls 2 N *e (W We ) 150*0.057(7 0.45) 63.697m 64m
L2s 642
s 0.341m
24R 24*500
3 الصفحة
Eng./Ameer Mohammed Ali AL-Borihy Transportation Engineering-1
02242028 & معهد الروادTel.:-700585334 فً الطرقات7و3حلول تمارٌن
solution
a-)S.S.D=90m,L=200m
180s 180*90
6.5
2 2 (R d ) 2 (400 1.9)
m R (R d )cos
2
m 400 (400 1.9)cos6.5 4.4m
b) O.S.D=300m.,L=200m
4 الصفحة
Eng./Ameer Mohammed Ali AL-Borihy Transportation Engineering-1
02242028 & معهد الروادTel.:-700585334 فً الطرقات7و3حلول تمارٌن
Traffic rotaries
1- The width of approaches for a rotary intersection is 12 m. The
entry and exit width at the rotary is 10
m. Table below gives the traffic from the four approaches,
traversing the intersection. Find the capacity
of the rotary.
Solution
The traffic from the four approaches negotiating through
the roundabout is illustrated in figure .
Weaving width is calculated as
e 2
w e1 3.5 13.5m
2
Weaving length can be calculated as, l = 4*w = 54 m.
The proportion of weaving traffic to the non-weaving
traffic in all the four approaches is found out first.
It is clear from equation ,that the highest proportion of
weaving traffic to non-weaving traffic will give the
minimum capacity. Let the proportion of weaving traffic to the
non-weaving traffic in West-North direction be denoted as
PWN, in North-East direction as PNE, in the East- South
direction as PES, and finally in the South-West direction as
PSW. Then using equation :-
5 الصفحة
Eng./Ameer Mohammed Ali AL-Borihy Transportation Engineering-1
02242028 & معهد الروادTel.:-700585334 فً الطرقات7و3حلول تمارٌن
10 0.816
280 *13.5 1 1
13.5 3 380.65veh / hr .
13.5
1
54
سٌكون فٌه ملخص اشتقاقات القوانٌن وحلول نماذج وسٌتم إعالمكم4 العدد األخٌر
.بالفٌس فور تجهٌزها ونسأل هللا التوفٌق للجمٌع
6 الصفحة