TEST REPORT
LIST OF EQUIPMENT
No.
MANUFACTURER
TYPE OF EQUIPMENT
EQUIPMENT DESIGNATION
SERIAL NUMBER
No.
MANUFACTURER
TYPE OF EQUIPMENT
EQUIPMENT DESIGNATION
SERIAL NUMBER
SAT Final
Test Report Used Internal SAT Component
FAT Settings
For Validation Testing
Testing
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
<14W <23W
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
5. SETTING CHECKS:-
Application specific function setting applied?
E/F CT Ratio
VT Ratio
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
Stg 2 f+t Freq 40.1 Hz< = < 69.9 Hz Pick-up: Setting ±0.025Hz
Drop-off: 1.05 x Setting ±0.025Hz
Stg 2 f+t Time 0 s < = < 100 s As per stage-1
Stg 5 f+t Freq 40.1 Hz< = < 69.9 Hz Pick-up: Setting ±0.025Hz
Drop-off: 1.05 x Setting ±0.025Hz
Stg 5 f+t Time 0 s < = < 100 s As per stage-1
6. MEASUREMENT TEST:
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
INJECT VOLTAGE IN THE RELAY AS PER THE TABLE BELOW AND OBSERVE THE READING ON THE
RELAYDISPLAY
R-E 63.5
Y-E 63.5
B-E 63.5
R-Y 63.5
Y-B 63.5
R-B 63.5
R-Y-B 63.5
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
Stage Set Frequency Actual Pickup Actual Drop out Operating Time Operating Time (s)
(HZ) Frequency Frequency (HZ) (s) Measured
(HZ) Set
Stage-1
Stage-2
Stage-3
Stage-4
Stage-5
BI 2
BI 3
BI 4
BI 5
BI 6
BI 7
BI 8
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
BI 1 Tested :
BI 2 Tested :
BI 3 Tested :
BI 4 Tested :
BI 5 Tested :
BI 6 Tested :
BI 7 Tested :
BI 8 Tested :
BO-1 Tested :
BO-2 Tested :
BO-3 Tested :
BO-4 Tested :
BO-5 Tested :
BO-6 Tested :
BO-7 Tested :
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
LED5 Tested :
LED6 Tested :
LED7 Tested :
LED8 Tested :
LED9 Tested :
LED10 Tested :
LED11 Tested :
LED12 Tested :
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
Recording duration
Test Fault Record -> Open Last recorded file and check the following signals are configured.
Signature
Name
Date
INTERNAL VALIDATION / FAT / SAT
TEST REPORT
Load shedding changeover switch in / out position and check the SCS signal
Load shedding selector switch in /out position and check the SCS signal
REMARKS:
Signature
Name