Location:
Specifications
Item No. Room Name Floor Finish Floor Area
FINISHING
1 Entrance Vinyl Floor Tiles 20.27
1,379.91
511.05
Drywall - Double Wall 963.64
Drywall - Single Wall 206.57 Gypsum Ceiling 161.67
Plastered Concrete Finish (New) 42.51 Suspended Acoustic Ceiling Panel 234.38
Plastered Concrete Finish (Existing) 158.28 Existing Gypsum Ceiling 29.49
Existing Gypsum Ceiling (PR & VER) 39.22
No Finish 46.29
493.88
1,170.20
200.79
Ceiling Height Remarks
(mm)
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
Room: Entrance
FLOOR L: 4.3
W: 4.715
AREA: 20.27
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
aluminum/glass windows
3.78
2.88
3.24
3.78 6.12
Room: Male Locker Room
FLOOR L: 3
W: 4.3
AREA: 12.90
0 0
43.8 0
WALL (Existing Sandwich Panel)
0 0
0 0
0 0
0 0
0
0 0 0 0 0 0
29.01
0.0 1 0 0 0 0 0
0 1 0 0 0 0 0
0 1 0 0 0 0 0
0.0 1 0 0 0 0 0
0
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Staircase-2
FLOOR L: 7.715 3
W: 3 3
AREA: 23.15 23.15
0 0 0 0 0 46.29
0 0 0 0 0 18
0 0 0 0 0 0
0 0 0 0 0 0
64.29
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Hallway
0 0 0 0 0 5.1
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
5.1
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Female Locker Room
FLOOR L: 6
W: 3
AREA: 18.00
0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Compressor Room
FLOOR L: 6
W: 7.715
AREA: 46.29
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
9.069375 1.295625 21.335316 0.005528 1.2438 0.2073
0 0 0 0 0 0
12.37688 1.768125 29.116068 0.007544 1.6974 0.2829
15.75 2.25 37.0512 0.0096 2.16 0.36
37.19625 5.31375 87.502584 0.022672 5.1012 0.8502
Room: Quality Control Room
FLOOR L: 7.715
W: 6
AREA: 46.29
0 0 0 0 0 14.145
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
14.145
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Lobby
FLOOR L: 7.715
W: 6
AREA: 46.29
0 0 0 0 0 0
3.78 1 3.78 0 0 3.78 14.22
0 0 0 0 0 0
0 0 0 0 0 0
14.22
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Female Comfort Room - 1
FLOOR L: 4.415
W: 3
AREA: 13.25
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
7.875 1.125 18.5256 0.0048 1.08 0.18
8.439375 1.205625 19.853268 0.005144 1.1574 0.1929
6.22125 0.88875 14.635224 0.003792 0.8532 0.1422
8.439375 1.205625 19.853268 0.005144 1.1574 0.1929
30.975 4.425 72.86736 0.01888 4.248 0.708
Room: Male Comfort Room - 1
FLOOR L: 4.415
W: 3
AREA: 13.25
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
0 0 0 0 0 0
7.875 1.125 18.5256 0.0048 1.08 0.18
8.439375 1.205625 19.853268 0.005144 1.1574 0.1929
6.22125 0.88875 14.635224 0.003792 0.8532 0.1422
22.53563 3.219375 53.014092 0.013736 3.0906 0.5151
Room: PWD Comfort Room
FLOOR L: 2
W: 1.5
AREA: 3.00
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
2.28375 0.32625 5.372424 0.001392 0.3132 0.0522
0 0 0 0 0 0
3.9375 0.5625 9.2628 0.0024 0.54 0.09
5.25 0.75 12.3504 0.0032 0.72 0.12
11.47125 1.63875 26.985624 0.006992 1.5732 0.2622
Room: Pump Room
FLOOR L: 3
W: 2
AREA: 6.00
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
0 0 0 0 0 0
6.22125 0.88875 0 Err:522 Err:522 0.1422
5.25 0.75 12.3504 Err:522 Err:522 0.12
7.875 1.125 0 Err:522 Err:522 0.18
19.34625 2.76375 12.3504 0.0032 0.72 0.4422
Room: Staircase 1
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
21 3 0 0.0128 2.88 0.48
0 0 0 0 0 0
0 0 0 0 0 0
8.6625 1.2375 0 0.00528 1.188 0.198
29.6625 4.2375 12.3504 0.01808 4.068 0.678
Room: Vacant Electrical Room
FLOOR L: 5.5
W: 5.5
AREA: 30.25
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
0 0 Err:522 0 0 0
0 0 Err:522 Err:522 Err:522 0
6.22125 0.88875 Err:522 Err:522 Err:522 0.1422
0 0 0 Err:522 Err:522 0
6.22125 0.88875 32.26542 0.00836 1.881 0.1422
Room: Canteen
FLOOR L: 4
W: 2.4
AREA: 9.60
0 0 0 0 0 0
0 0 0 0 0 15.675
0 0 0 0 0 0
0 0 0 0 0 0
15.675
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Office
FLOOR L: 8.75
W: 6.215
AREA: 54.38
0 0 0 0 0 0
0 0 0 0 0 26.25
0 0 0 0 0 0
0 0 0 0 0 0
26.25
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Server Room
FLOOR L: 2.55
W: 3.25
AREA: 8.29
0 0 0 0 0 0
0 0 0 0 0 9.75
0 0 0 0 0 0
0 0 0 0 0 0
9.75
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Reception Room
FLOOR L: 3.815
W: 3.25
AREA: 12.40
Mark B H Opening
D1 1.8 2.1 3.78
D2 0.9 2.1 1.89
D3 1.8 2.1 3.78
W1 1.2 1.2 1.44
W2 1.8 1.8 3.24
OPENING
DOORS WINDOWS Total NET AREA
Opening Units Sub-Total Mark Opening Units Sub-Total
0 0 0 0 0 11.445
0 0 0.0 0 0
0 0 0 0 0 11.445
1.9 1 1.89 0 0 1.89 7.86
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
30.75
Room: Meeting Room
FLOOR L: 6.215
W: 3.35
AREA: 20.82
0 0 0 0 0 0
0 0 0 0 0 9.75
0 0 0 0 0 0
0 0 0 0 0 0
9.75
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Stock Room
FLOOR L: 6.215
W: 2.05
AREA: 12.74
0 0 0 0 0 6.15
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
6.15
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
Room: Female Comfort Room - 2
FLOOR L: 1.865
W: 2
AREA: 3.73
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
4.895625 0.699375 12.65916 0.00328 0.738 0.1119
3.59625 0.51375 Err:522 Err:522 Err:522 0.0822
4.895625 0.699375 Err:522 Err:522 Err:522 0.1119
0 0 Err:522 Err:522 Err:522 0
13.3875 1.9125 Err:522 Err:522 Err:522 0.306
Room: Male Comfort Room - 2
FLOOR L: 1.865
W: 3
AREA: 5.60
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
0 0 0 0 0 0
7.875 1.125 18.5256 Err:522 Err:522 0.18
3.241875 0.463125 7.626372 Err:522 Err:522 0.0741
0 0 0 Err:522 Err:522 0
11.11688 1.588125 26.151972 0.00836 1.881 0.2541
Room: Fire Exit
FLOOR L: 2.55 1
W: 6 1.865
AREA: 15.30 1.87 17.17
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
15.75 2.25 37.0512 0.0096 2.16 0.36
5.04 0.72 11.856384 0.003072 0.6912 0.1152
0 0 0 0 0 0
0 0 0 0 0 0
20.79 2.97 48.907584 0.012672 2.8512 0.4752
Room: Working Area
FLOOR L: 32
W: 33
AREA: 881.40 0.00 881.40
Reference
Rebar Ф kg/m
10 0.62
12 0.89
16 1.58
18 2
20 2.47
28 4.83
CHB Wall Requirement Plastering (Ext.)
CHB Fill Sand Rebar Ф10mm GI Wire # 16 Cement Sand
50 kg/Bag m3 kg 45 kg/Roll 50 kg/Bag m3
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0