Project Fontana Garden

Tower Tower - "A"


Job Balance work report
Date 02.04.2016

Sr.
Description Status Expected Finishing Date
No
A Painting Work
I) Painting work (only flats).
1 5th floor inside flats balance. sanding in progress
2 7th floor, flat no. 1 & 5 balance. Plumbing material store.
3 38th floor flats inside painting in progress. painting in progress
4 35th floor bathrooms balance. 2nd coat putty in progress
5 22nd to 38th floor access panel painting balance.
Will do after completing the
6 A/c return inside black paint is balance from (5th to 9th) and (31st to 38th floor).
above activities.
7 Mirror backing side white paint balance (16th to 38th floor), 4 backing per floor.

II) Painting work (flats - Balconies)


1 (5th to 9th floor) and (31st to 38th floor) balance. 1st coat putty in progress
2 21st, 22nd & 24th floor balance. 2 coat putty done.

III) Painting work (A/C balconies)


1 (9th to 15th floor) balance. 2 coat putty done.
2 (5th to 9th floor) & (31st to 38th floor) balance. preparation in progress

IV) Painting work (Lift lobby & Corridor)


1 31st floor balance. Sanding done.
2 38th floor balance. 1 coat putty done.

V) Painting work (Service Lift)


1 (31st to 38th floor) balance. Gypsum closing balance.
2 Ground to Gym 2 balance. Grid in progress.

VI) Staircase
Main staircase and Service staircase above 38th floor balance. 1st coat putty in progress.

B Gypsum Work
1 Service lift 31st to 38th floor balance. sprinkler dropper in progress.
2 Service lift Ground to Gym 2 floor balance. Grid work in progress.
3 Access panel fixing from 35th floor to 38th floor balance. in progress.
4 3flats, flat no.2, kitchen bulkhead work balance. balance.
5 Electrical room shaft closing is balance. Grid work in progress.

C Tiles work
1 Service lift area Ground to Gym 2 balance Grid work in progress.
2 37th and 38th floor bathtub tile balance. in progress.
3 16th and 25th floor, flat no.4, kitchen floor tiles balance. water tank.
4 37th floor, flat no.2, dining area floor tile balance. Cradle support.
5 Balcony skirting work balance. Not started.
6 Flats grouting work balance. just started.
7 35th to 38th floor kitchen wall tiles balance. balance

D MEP work
1 Electrical switches and sockets (10th to 12th floor) only in progress. progress is very slow.
2 Light fixtures (5th to 9th floor) and (31st to 38th floor) inside flats balance. work in progress(10th to 30th)
3 A/C grills from 22nd to 38th floor balance. progress is slow.
4 Sanitaryware fitting from (22nd to 38th floor) & (5th to 9th floor) balance. progress is slow.
5 service lift, lift lobby, corridor and staircase area mep work balance. not yet started.

6 Out door unit work from (20th floor to 38th floor), totally balance. (5th to 19th floor in progress.
work is in progress. - no connection done)

E Miscellaneous work
1 A/C balcony screed work from (5th to 15th floor) balance. in progress
2 Epoxy at A/C unit balcony is balance. not yet started.
3 4-flats dining area wooden flooring is balance. not yet started.
4 Bathroom mirrors and shower encloser is balance from (35th to 38th floor) mesurement taken.
5 Roof external plaster work is balance. not yet started.
6 Roof inside room gypsum ceiling, painting and flooring is balance. not yet started.
7 Service list area gypsum ceiling, tiling and painting in non-typical is balance. grid in progress.
8 Vanity fixing (24th to 38th floor) balance work in progress
9 Lift lobby marble cladding (5th to 9th floor) & (23rd to 38th floor) balance work in progress
10 Service lift granite door jams (26th to 38th floor) balance work in progress
11 Kitchen top (5th to 9th) & (26th to 38th) floor balance. work in progress