0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
179 Ansichten1 Seite
Uniqcore Construction India Pvt Ltd uses this form to document non-conformances on projects, including the project name and location, description of the issue, who reported it, and corrective and preventive actions assigned with deadlines. Signatures are required from those assigned to complete the actions and from quality engineers to verify completion.
Uniqcore Construction India Pvt Ltd uses this form to document non-conformances on projects, including the project name and location, description of the issue, who reported it, and corrective and preventive actions assigned with deadlines. Signatures are required from those assigned to complete the actions and from quality engineers to verify completion.
Uniqcore Construction India Pvt Ltd uses this form to document non-conformances on projects, including the project name and location, description of the issue, who reported it, and corrective and preventive actions assigned with deadlines. Signatures are required from those assigned to complete the actions and from quality engineers to verify completion.