Provision of Camps, Office, Workshop, Labour camps, Site laboratory setup all
LS 1
complet, Water supply and Sewerage, canteen and recreational facilities
1.04 SITE RUNNING COST Mth 26
1.05 DEMOBILISATION LS 1
Upgrading and maintenance of site access roads during construction (about 11 km) LS 1
1.08 DAYWORKS LS
A Skilled labour perhr
D Backhoe include fuel, driver and helper all complete Per hr.
Excavator (PC200 or equivalent) all complete include fuel, driver and helper all
E Per hr.
complete
F Vehicles include fuel, driver and helper all complete Per Km
2.00 COFFER DAM (KALANGA HEADWORKS) COFFER DAM (KALANGA HEADWORKS) TOTAL
3.00 FLOODWALL
3.04 Excavation -
4.04 Excavation
4.10 Formwork m 2
1856.46
4.16 Cement Bags for Boulder lining infill ( making mortar 1:1 for infill) Kg 20000.00
Geotextile (having weigth of 150 g/ m2 or more), material supply and
4.17 m2
laying all complete
4.18 Stone masonary m3
4.19 Gabion works m3
5.09 Formwork m 2
2022.05
6.02 Excavation
a Earthwork Excavation in boulder mixed Soil including Haulage up to 100 m m3 1260.00
b Earthwork Excavation in Soft Soil including Haulage up to 50 m m3 210.00
c Earthwork Excavation in Hard Rock including disposal m3 630.00
6.03 Site Clearance m2 789.53
7.02 Excavation
7.08 Formwork m 2
3429.87
8.02 Excavation
11.01 Care of Water during construction for all Support types LS 1.00
E 150mm Shotcrete(lining) m 2
12,032.67
11.05 Rockbolts
11.08 Weep Hole perforated 50mm dia HDPE pipe placing including drilling No. 14,265.00
11.09 Steel Ribs ISMB 150( including tie rod , ancor Rod and all accessories) ton 246.16
11.11 Formwork m 2
363.90
11.35 Filling of overbreak (within 10%) area by 50mm plain shotcrete m2 400.00
12.01 Excavation
13.02 Excavation
13.03 Care of Water during construction for all Support types LS 1.00
13.07 Rockbolts
13.10 Weep Hole perforated 50mm dia HDPE pipe placing including drilling No. 150.00
13.17 MISCELLANEOUS
14.00 ANCHOR BLOCK AND SADDLE SUPPORTS ANCHOR BLOCK AND SADDLE SUPPORTS TOTAL
14.09 MISCELLANEOUS
1:4 Stone masonry pitching of diiferent thickness as directed by the
A m3 200
Engineer
B 110mm Ø HDPE pipe m 300
15.01 Excavation
16.01 Care of Water during construction for all Support types LS 1.00
16.05 Rockbolts
16.06 Weep Hole perforated 50mm dia HDPE pipe placing including drilling No. 885.00
16.11 Wiremesh m 2
200.00
17.02 Excavation
A Main Building
19.03 Excavation
19.09 Formwork m 2
2564.52
Currency Rs
110
FA 2.02: Details of Cost Exchange rate ($) Not on escallation
1.05 Vehicles - - - -
2.01 Contractor's mobilisation ,Demobilisation and all other 34,620,000 0.00% - 0.00% - 0.00% - 34,620,000
requirements
Total 2 34,620,000 - - 34,620,000
3.01 River Training Works and cofferdam 6,211,293.60 5.00% 310,565 8.00% 496,903 13.00% 847,842 7,866,603
3.02 Floodwall 45,190,365.78 5.00% 2,259,518 8.00% 3,615,229 13.00% 6,168,485 57,233,598
3.03 Weir 79,132,909.72 5.00% 3,956,645 8.00% 6,330,633 13.00% 10,801,642 100,221,830
3.04 Undersluice 25,626,769.18 5.00% 1,281,338 8.00% 2,050,142 13.00% 3,498,054 32,456,303
3.05 Intake , gravel trap 33,305,447.94 5.00% 1,665,272 8.00% 2,664,436 13.00% 4,546,194 42,181,350
3.06 Approach Culvert 29,904,627.72 5.00% 1,495,231 8.00% 2,392,370 13.00% 4,081,982 37,874,211
3.07 Settling basin 120,267,745.93 5.00% 6,013,387 8.00% 9,621,420 13.00% 16,416,547 152,319,100
3.08 Power Culvert 89,969,731.51 5.00% 4,498,487 8.00% 7,197,579 13.00% 12,280,868 113,946,665
3.09 Inlet Portel 4,026,178.17 10.00% 402,618 8.00% 322,094 13.00% 575,743 5,326,634
3.10 Outlet Portal 3,677,202.84 10.00% 367,720 8.00% 294,176 13.00% 525,840 4,864,939
3.11 Headrace Tunnel 603,808,054.87 10.00% 60,380,805 8.00% 48,304,644 13.00% 86,344,552 798,838,057
3.14 Surge tank 30,340,647.81 10.00% 3,034,065 8.00% 2,427,252 13.00% 4,338,713 40,140,677
3.15 Penstocktunnel Inlet Portal 2,686,013.36 10.00% 268,601 8.00% 214,881 13.00% 384,100 3,553,596
3.16 Penstocktunnel 21,584,197.80 10.00% 2,158,420 8.00% 1,726,736 13.00% 3,086,540 28,555,894
3.17 Penstock tunnel Outlet portal 2,717,387.70 10.00% 271,739 8.00% 217,391 13.00% 388,586 3,595,104
3.18 Penstock pipe anchor blocks and supports (civil cost only) 32,044,005.04 5.00% 1,602,200 8.00% 2,563,520 13.00% 4,374,007 40,583,732
3.19 Powerhouse 52,224,701.86 10.00% 5,222,470 8.00% 4,177,976 13.00% 7,468,132 69,093,281
3.20 Tail race & PH protection wall 19,894,674.18 5.00% 994,734 8.00% 1,591,574 13.00% 2,715,623 25,196,605
3.21 Switchyard 5,000,000.00 5.00% 250,000 8.00% 400,000 13.00% 682,500 6,332,500
Material cost (60% of total cost) 24,290,400 2.50% 607,260 - 1.00% 248,977 25,146,637
Fabrication Cost (40% of total cost) 16,193,600 2.50% 404,840 - 13.00% 2,157,797 18,756,237
Material cost (60% of total cost) 34,046,449 2.50% 851,161 - 1.00% 348,976 35,246,587
Fabrication Cost (40% of total cost) 22,697,633 2.50% 567,441 - 13.00% 3,024,460 26,289,533
SN Description Base Cost % Amt % Amt % Amt Total Cost
4.03 Steel Lining 12,173,187 304,330 - 723,696 13,201,213
Material cost (60% of total cost) 7,303,912 2.50% 182,598 - 1.00% 74,865 7,561,375
Fabrication Cost (40% of total cost) 4,869,275 2.50% 121,732 - 13.00% 648,831 5,639,838
4.01 Water to wire supply from 320,397,000 2.50% 8,009,925 1.00% 3,284,069 331,690,994
Manufacturer($320397000*15.33kW)
4.02 LC Charge @ 8 quarter * 1.25% 3,203,970 2.50% 80,099 - 3,284,069
6.02 Fabrication, Installation, Detail Design, Survey etc. 57,000,000 - 13.00% 7,410,000 64,410,000
8.01 Site office and camp facilities -Shared 0.00% - 13.00% 1,315,778 11,437,150
10,121,372
Total 8 10,121,372 - - 1,315,778 11,437,150
10.00 VEHICLES -
11.01 Infrastructure(Access Road and Bridge) 50,000,000 0.00% - 13.00% 6,500,000 56,500,000
12.01 Environmental mitigation and social cost as per IEE 12,570,600 - - 12,570,600
14.01 Insurance including third pary liability up to 1 mil 10,269,974 0.00% - - 10,269,974