From analysis :
Classifications :
ℎ = 300 𝑚𝑚 𝑏 = 15600 𝑚𝑚 𝑙 = 4000 𝑚𝑚
𝑧𝑜𝑛𝑒 𝑙𝑒𝑛𝑔𝑡ℎ = 1950 𝑚𝑚
design :
- End Zone :
𝑃 𝑀𝑖𝑛 18029.4 29696.01∗103
𝑁=𝑛+ 𝑍
= 8
+ 15600−1950 = 4429.21 𝐾𝑁
To find 𝑀𝑜𝑢 :
𝑀𝑎𝑑𝑑 = 𝑁 ∗ 𝑎𝑢
𝑎𝑢 = 𝛽 ∗ 𝑘ℎ
𝑇𝑎𝑘𝑒 𝑘 = 1
1 𝐻𝑒 2
𝛽= ( )
2000 ℎ
ℎ𝑒 = 𝛽𝑥 ∗ 𝐻
Thickness of top & bottom slab = 250 𝑚𝑚 , condition 2 for both
1 3200 2
𝛽= ∗( ) = 0.056
2000 300
0.056 ∗ 300
𝑎𝑢 = = 0.0168
1000
𝑀𝑎𝑑𝑑 = 4429.21 ∗ 0.0168 = 74.41 𝐾𝑁. 𝑚
236.16
𝑀𝑖 = 𝑀2 + 𝑀𝑎𝑑𝑑 = + 74.41 = 103.93 𝐾𝑁. 𝑚 > 𝑁𝑒𝑚𝑖𝑛
8
∴ 𝑀𝑜𝑢 = 103.93 𝐾𝑁. 𝑚
100𝐴𝑠
From chart take 𝑏ℎ
= 0.18
- Mid Zone :
𝑃 18029.4
𝑁=𝑛= 8
= 2253.68 𝐾𝑁
𝑀 = 103.93 𝐾𝑁. 𝑚
100𝐴𝑠
From chart take 𝑏ℎ
= 0.11
Torsion design :
2𝑇 2 ∗ 2204.007 ∗ 106
𝑣𝑡 = = = 3.16 𝑁/𝑚𝑚2
ℎ𝑚𝑖𝑛 300
ℎ𝑚𝑖𝑛 2 (ℎ𝑚𝑎𝑥 − ) 3002 ∗ (15600 −
3
)
3
𝑣𝑡.𝑚𝑖𝑛 = 0.4 → 𝑣𝑡 > 𝑣𝑡.𝑚𝑖𝑛
∴ 𝑡𝑜𝑟𝑠𝑖𝑜𝑛 𝑟𝑒𝑖𝑛𝑓𝑜𝑟𝑐𝑒𝑚𝑒𝑛𝑡 𝑖𝑠 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑
𝐴𝑠𝑣 𝑇
=
𝑠𝑣 0.8𝑥1 𝑦1 (0.87𝑓𝑦𝑣 )
𝑥1 = 300 − 2 ∗ 30 = 240 𝑚𝑚
𝑦1 = 15600 − 30 ∗ 2 = 15540 𝑚𝑚
𝐴𝑠𝑣 2204.007 ∗ 106
= = 1.85
𝑠𝑣 0.8 ∗ 240 ∗ 15540 ∗ 0.87 ∗ 460
229193
∴ the longitudinal area For each zone = 8
= 3649.125 𝑚𝑚2
100𝐴𝑠 100∗3649.125
𝑏ℎ
= 300∗1950
= 0.62
Shear design :
𝑉𝑖 4802.74 ∗ 103
𝑉𝑖 = 4802.74 KN → 𝑣𝑖 = = = 1.28 𝑁/𝑚𝑚2
𝑏𝑑 300 ∗ 0.8 ∗ 15600
𝑉𝑜ℎ 334.625 ∗ 103
𝑉𝑜ℎ = 334.625 KN → 𝑣𝑜ℎ = = = 0.084 𝑁/𝑚𝑚2
𝑏𝑑 15600 ∗ 254
1 1 1
0.79 100𝐴𝑠 3 400 4 𝑓𝑐𝑢 3
𝑣𝑐 = [ ] [ ] [ ]
𝛾𝑚 𝑏𝑑 𝑑 25
Determination of (𝑣𝑐𝑖 ) :
100𝐴𝑠
𝑏𝑑
≤3
100𝐴𝑠 100∗17491.5
𝑏𝑑
= 300∗0.8∗15600 = 0.467
400 1
[𝑑
]4 ≥1
1
400
[0.8∗15600]4 = 0.423
0.79 1 40 1
𝑣𝑐𝑖 = ∗ (0.467)3 ∗ 1 ∗ ( )3 = 0.57 𝑁/𝑚𝑚2
1.25 25
𝑁𝑉ℎ 𝑁
𝑣°𝑐 = 𝑣𝑐𝑜 + 0.6 𝐴 , 𝑣𝑐 = 𝑣𝑐 √1 + (𝐴
𝑐𝑀 𝑐 𝑣𝑐 )
𝑉ℎ 4802.74 ∗15600
𝑀
≥1 , 29696.01∗103
= 2.52
18029.4 ∗ 1
𝑣°𝑐𝑖 = 0.57 + 0.6 = 2.78 𝑁/𝑚𝑚2
15600 ∗ 300
18029.4 ∗ 103
𝑣°𝑐𝑖 = 0.57√1 + = 1.59 𝑁/𝑚𝑚2
(15600 ∗ 300 ∗ 0.57)
Determination of (𝑣𝑐𝑜 ) :
100𝐴𝑠
≤3
𝑏𝑑
400 1
[ ]4 = 1.12
254
1
0.79 1 40 3
∴ 𝑣𝑐𝑜 = ∗ (0.44)3 ∗ 1.12 ∗ ( ) = 0.63 𝑁/𝑚𝑚2
1.25 25
𝑉ℎ 334.625∗300
𝑀
≤1 , 236.16∗103
= 0.425
18029.4 ∗ 103
𝑣°𝑐𝑜 = 0.63√1 + = 1.68 𝑁/𝑚𝑚2
(15600 ∗ 300 ∗ 0.63)
𝐴𝑠𝑣
So for horizontal reinforcement : 𝑆𝑣
= 0 + 1.85 = 1.85
Tension check :