TUGAS ANALISIS SISTEM TENAGA

TEKNIK ELEKTRO 6A
NAMA KELOMPOK :
1. Pavelza Syafiul Khalim (201310130311060)
2. Anggayuh Muttaqien (201310130311100)
3. Rahayu Pandunengsih (201410130311020)
4. Jawahir Januarestu (201410130311036)
5. Fadli Nur Hidayat (201410130311160)
6. Farid Haris Ahmad (201410130311182)
Metode Gauss-Seidel

Listing Program
clc;clear;
%% Data Admintansi Saluran
y13=4-5*j;
y23=4-10*j;

%% Matrix Ybus
Y11=y13; Y12=0; Y13=-y13;
Y21=0; Y22=y23; Y23=-y23;
Y31=-y13; Y32=-y23; Y33=y13+y23;

Ybus=[Y11, Y12, Y13; Y21, Y22, Y23; Y31, Y32, Y33];


%% Data Tegangan BUS
V1_mag=1;
V2_mag=1.1249;
V3_mag=1;

%% Data Sudut BUS


sdt1=0;
sdt2=0;
sdt3=0;

%% Menghitung Tegangan Kompleks BUS


V1_kom=V1_mag*cos(sdt1)+V1_mag*sin(sdt1)*j;
V2_kom=V2_mag*cos(sdt2)+V2_mag*sin(sdt2)*j;
V3_kom=V3_mag*cos(sdt3)+V3_mag*sin(sdt3)*j;

%% Data Daya BUS


S2=1.7;
S3=-(2.0+1.0*j);
epsilon = 0.0001;
%% Loop menghitung tegangan BUS
disp('|------------------------------------------------------------
|')
disp('|iter V3_kom V2_kom
|')
disp('|------------------------------------------------------------
|')
format short g
delta_v=1;
iter=0;
while delta_v >= epsilon
%% Menghitung Tegangan BUS 3
V3=(1/Y33)*((conj(S3)/conj(V3_kom))-(Y31*V1_kom + Y32*V2_kom));
V3_cor=(1/Y33)*((conj(S3)/conj(V3))-(Y31*V1_kom + Y32*V2_kom));
V3_kom=V3_cor;
Q2=-imag(conj(V2_kom)*(Y23*V3_kom+Y22*V2_kom));
S2=1.7+Q2*j;

%% Menghitung Tegangan BUS 2


V2=(1/Y22)*((conj(S2)/conj(V2_kom))-(Y23*V3_kom));
mag_V2=abs(V2);
V2_cor=(V2_mag/mag_V2)*(V2);
%V2_kom=V2_cor;

%% Menghitung Delta Sebagai Penghenti Iterasi


delta_v=abs(V2_cor-V2_kom);
V2_kom=V2_cor;
iter=iter+1;
fprintf(' %i',iter),disp([V3_kom,V2_kom])
end
%% Menghitung Arus Pada Saluran
I13=(V1_kom-V3_kom)*Y13;
I31=-I13;

I23=(V2_kom-V3_kom)*Y23;
I32=-I23;

%% Menghitung Daya Pada Saluran


S13=V1_kom*conj(I13)*100;
S31=V3_kom*conj(I31)*100;

S23=V2_kom*conj(I23)*100;
S32=V3_kom*conj(I32)*100;

%% Menghitung Rugi Pada Saluran


Rugi_13=(S13 + S31)
Rugi_23=(S23 + S32)

%% Menghitung Daya Pada Saluran Bus


S1=V1_kom*conj(I13)*100
S2=V2_kom*conj(I23)*100
S3=V3_kom*conj(I31+I32)*100
Hasil Simulasi
|------------------------------------------------------------|

|iter V3_kom V2_kom |

|------------------------------------------------------------|

1 0.96228 - 0.076855i 1.1249 + 0.007927i

2 0.96234 - 0.073854i 1.1248 + 0.012446i

3 0.96285 - 0.071287i 1.1248 + 0.015916i

4 0.96324 - 0.069309i 1.1247 + 0.018585i

5 0.96353 - 0.067787i 1.1247 + 0.020636i

6 0.96376 - 0.066616i 1.1247 + 0.022212i

7 0.96393 - 0.065717i 1.1247 + 0.023422i

8 0.96406 - 0.065026i 1.1246 + 0.024351i

9 0.96416 - 0.064496i 1.1246 + 0.025063i

10 0.96423 - 0.064089i 1.1246 + 0.02561i

11 0.96429 - 0.063777i 1.1246 + 0.02603i

12 0.96434 - 0.063537i 1.1246 + 0.026351i

13 0.96437 - 0.063353i 1.1246 + 0.026598i

14 0.9644 - 0.063213i 1.1246 + 0.026787i


15 0.96442 - 0.063104i 1.1246 + 0.026932i

16 0.96443 - 0.063022i 1.1246 + 0.027044i

17 0.96444 - 0.062958i 1.1246 + 0.027129i

Rugi_13 =

-2.0912 - 2.614i

Rugi_23 =

-13.503 - 33.757i

S1 =

-45.702 + 7.405i

S2 =

-169.97 - 143.73i

S3 =

200.08 + 99.959i