Sie sind auf Seite 1von 12

Traffic Study Manual – Spack & Ficek 

     
contains three lines.  It has five syllables in  As a starting point, this is our basic process 
Why a Traffic Study  the first line, seven syllables in the second  for all traffic studies: 
Manual?  line and five syllables in the third.  Go.  1. Document how the existing 
This is the manual we wish we had when      transportation system is working. 
we started doing traffic studies almost  Mike’s not going to share the couple of  2. Determine how the transportation 
twenty years ago.  It details the complete  words of his first poem, but here’s his  system will work in the future. 
process for preparing traffic studies for  haiku:  3. Determine how the transportation 
new land developments/re‐developments  I like chocolate.  system will work in the future with 
and we guarantee it will shorten your  It makes me very happy.  the traffic added from the 
learning curve.  It improves my day.  proposed development. 
      4. Determine what, if any, 
 We’ll teach you how to:  Mike didn’t get anywhere with his first  improvements need to be made to 
 Conduct a thorough inventory of  poem and you can see his haiku isn’t  accommodate the traffic in any of 
existing conditions.  exactly brilliant.  Here’s the deal though –  those scenarios. 
 Prepare traffic forecasts.  he could easily follow the prescribed     
 Analyze the capacity of roads and  structure and create an acceptable haiku.   We’ve broken these general four tasks into 
intersections.  Odds are the haiku exercise was a lot  a nine step procedure for preparing traffic 
 Determine if roadway or traffic  easier than the open ended poetry  studies.  By following this structure, you’ll 
control improvements need to be  assignments for you too.  be able to efficiently create a sound traffic 
made for a proposed development.      study.  The steps are shown below in 
 Write easy to understand traffic  We need to be honest with you ‐ this  Figure 1 and they’re the topics for each 
study reports.  manual won’t make you an overnight  chapter in this manual.   
  expert on traffic studies.  It will, however,   
Quick diversion – take 90 seconds and  give you the structure and process for  The nine steps are listed in the preferred 
write a poem.  It can be any length, any  creating a basic traffic study, much like  order of completion, but we recommend 
style, any subject.  Go ahead.  Time  giving you a basic structure for how to  you work on many of the steps in a parallel 
yourself.  Go.  write a haiku.  You’ll also discover that like  process, not a sequential one.  On day one, 
     when writing haikus, the more traffic  you could: 
Now take another 90 seconds and write a  studies you prepare, the better you’ll get.     Do a very quick review of the site 
haiku about chocolate.  Here’s a quick      plan to see if any fatal flaws jump 
reminder for you ‐ a haiku is a poem that  out at you. 
 
 
www.SpackAcademy.com      1 
Traffic Study Manual – Spack & Ficek 
     
 Contact your data collector’s to get  manual so you can translate traffic 
on their schedule in the next couple  engineering‐ese.   
  Document 
of weeks.  Assumptions to 
Existing 
 Contact the reviewing agencies.  A list of references is also provided at the  Reviewers
Conditions
 Get out to the site for an initial  end of the manual.  These are resources 
review.  that have helped us through our careers 
  and are a suggested reading list to help 
We’ve come to understand that you need  you further your education. 
Prepare Traffic  Traffic Data 
to get the ball rolling on any items that    Forecasts Collection
could end up being sticking points and 
delay completing the study on time.  You 
Bonus Resources 
can always make adjustments as you go  The precursor task to preparing a traffic 
through the study steps in more detail.  study is to develop the scope of work and 
provide a fee in a proposal.  This includes  Perform  Determine 
  Capacity  Necessary 
determining what intersections and future 
How to Use This Manual  year scenarios should be studied.  We  Analyses Improvements
First, we recommend you read through the  assume you won’t prepare a proposal if 
whole manual so you understand what a  you’ve never done a study, but just in case, 
traffic study involves from start to finish.   we provide a free guide at Spack Academy.   
After that, you can use this manual as a    Perform Micro‐
Site Review
guide, referring to the appropriate chapter  We also include a free guide on managing  simulations
when you are in different stages of your  a traffic study at Spack Academy.  You may 
traffic study. Also, at the end of each  not be a manager now, but think big and 
chapter, we’ve included easy‐to‐use  you’ll get there. In addition, this guide will 
checklists for quick reference.    help you work with your boss. 
  Prepare Traffic 
Study Report
We work hard throughout this manual and 
on the job to talk in plain English, but you’ll 
still need to talk with other traffic   
  Figure 1 – Traffic Study Process  
engineers who love jargon and acronyms.      
We provide a glossary at the end of the 
   
 
 
www.SpackAcademy.com      2 
Traffic Study Manual – Spack & Ficek

About the Authors Engineers and he’s a Fellow of the Institute


of Transportation Engineers. A University of Minnesota graduate, his
work history includes stops at Benshoof &
Mike Spack, PE, PTOE is the A University of Minnesota graduate, his Associates (where he completed his share
founder and president work history includes stops at Bonestroo & of traffic counts), TKDA and at Bonestroo &
of Spack Consulting, Associates, Benshoof & Associates and the Associates. He is an active member of both
Traffic Data Inc, and City of Maple Grove, MN. the Institute of Transportation Engineers
CountingCars.com. and the American Society of Civil
He’s prepared traffic Outside of work, Mike enjoys fishing, Engineers.
studies for projects playing catch with his kids, and cooking
ranging from 5,000 with his wife. He’s always wanted to be Throughout his career, he has been
acres in size down to a able to do back handsprings, but doing a grateful for the opportunity to work on
few townhomes. headstand is probably a more realistic goal memorable projects such as Minnesota’s
Mike’s led more than a as a forty year old. first Diverging Diamond Interchange at Elk
thousand traffic engineering projects in his Run and the reconstruction of the I-35W
career – never missing a deadline or going St. Anthony Bridge. His work has also
over budget. Bryant Ficek, PE, PTOE is the included hundreds of traffic impact
Vice-President of Spack studies, from small single stores to
He’s also behind the industry leading blog Consulting where he’s complex multi-phased mega-
MikeOnTraffic where he writes about responsible for the developments.
traffic analysis, data collection, our quality of all
profession, and projects he finds transportation Outside of work, Bryant enjoys his
interesting. Mike was a municipal traffic consulting projects. He basketball (playing or watching), coloring
engineer before going out on his own, he’s provides traffic with his kids, and running with his wife. He
a past president of the North Central engineering and also hopes to someday be able to play
Section of the Institute of Transportation transportation planning services for public more than one chord on the guitar.
and private clients.

www.SpackAcademy.com 3
Traffic Study Manual – Spack & Ficek 
     

Table of Contents 
Why a Traffic Study Manual?  _____________________________________________________________________________________________  1 
About the Authors  ______________________________________________________________________________________________________  3 
Table of Contents _______________________________________________________________________________________________________  4 
Assumptions to Reviewers ________________________________________________________________________________________________  5 
Document Existing Conditions ____________________________________________________________________________________________  10 
Traffic Data Collection __________________________________________________________________________________________________  16 
Prepare Traffic Forecasts ________________________________________________________________________________________________  31 
Perform Capacity Analyses  ______________________________________________________________________________________________  40 
Determine Necessary Improvements  ______________________________________________________________________________________  46 
Determine Whether to Use Simulation _____________________________________________________________________________________  51 
Site Review ___________________________________________________________________________________________________________  57 
Prepare Documentation _________________________________________________________________________________________________  63 
Thank You So Much! ____________________________________________________________________________________________________  69 
References/Resources  __________________________________________________________________________________________________  70 
Acknowledgements  ____________________________________________________________________________________________________  72 
Glossary  _____________________________________________________________________________________________________________  73 
APPENDIX – Using ITE’s Trip Generation Manual _____________________________________________________________________________  79 

   

 
 
www.SpackAcademy.com      4 
Traffic Study Manual – Spack & Ficek 
     
under the public works or engineering  assumptions those studies make.  It’s good 
Document Existing  sections of the website, if it isn’t under the  for your study to make assumptions 
Conditions  planning department.  The transportation 
Once you have your traffic counts ordered  plan is usually a PDF file; save it to your  Mike had an especially bad 
or internally lined up, you can turn your  network or bookmark it for easy access  experience with this about ten years 
attention to the second task –  later.  ago.  The city’s ordinance 
documenting existing conditions.  Your    conservatively required all 
purpose here is to gain an understanding  Also, figure out if the city has a policy  intersections to operate at Level of 
of the area around the proposed  related to traffic impact studies.  It’s rare  Service C or better and all individual 
development, both its land uses and traffic  in our experience, but some cities do have  movements to operate at Level of 
operations.  This chapter also coordinates  explicit policies.  They may be detailed  Service E or better.  He prepared the 
with your traffic counts – confirm your  enough to give you a full outline for the  study based on a less‐conservative, 
data collection plan is adequate.  study along with what to include in each  industry standard ‐ Level of Service D 
  section and what graphics are required.    overall, with individual movements 
  operating at Level of Service F being 
Online Research  Sometimes the city’s standards are part of  acceptable in some situations.  This 
In the last five years, government agencies  their ordinance and almost all cities have  was caught by city staff as part of the 
have embraced the internet and are now  their ordinances posted.  You should scan  city’s review of the whole 
posting a wealth of information which may  through them to see if there is anything  development package, which included 
be relevant to your traffic study.  The first  relevant to how closely intersections can  Mike’s traffic study.  Mike had to 
place you should start your online research  be spaced or how much vehicle delay is  apologize profusely and work through 
is at the planning department page of the  considered unacceptable.  the weekend to make things right 
local government (city/town/village)    with his client.  The end result was 
website; this could be done at the same  The city’s planning page may also list  that a costly traffic signal had to be 
time as your search for traffic data from  nearby developments either under  installed at an intersection where he 
Chapter 1.  You’re trying to find their  construction or in the approval process.   wouldn’t normally have 
transportation plan, if they have one.  The  They may even include traffic studies  recommended one.  The moral of the 
transportation plan is usually a section of  prepared for those specific developments.   story is making sure you know about 
the city’s overall comprehensive plan and  Prior traffic studies are always useful for  all policies/guidelines that may affect 
describes the vision for their  seeing the types of studies the city  your study. 
transportation network.  It could be listed  typically approves and what kinds of 
 
 
www.SpackAcademy.com      10 
Traffic Study Manual – Spack & Ficek 
     
consistent with those of previous traffic  jurisdiction should provide detailed   Transportation plans 
studies.  formulas for you to use in determining any   Capital improvement plans 
  traffic impact fees.  In addition to the city’s   Traffic volume data  
The city may also list the construction  website, a good clearinghouse is located at   Historic daily traffic volumes 
projects scheduled for the next five years,  ImpactFees.com.     Peak hour turning movement 
often labeled the Capital Improvement      volumes 
Plan.  See if there are any construction  While you’re in the city’s comprehensive   Crash data 
projects affecting your study area.  It’s also  plan, you can gather land planning     
wise to let your client know if the road in  information for your development.  Some  Through the property records section of 
front of their development will be under  relevant questions to ask include:  the county’s website, you can typically find 
major reconstruction the year after their   What is the current land use of the  parcel information, including public right‐
project opens.  This kind of information  parcel?    of‐way widths.  This right‐of‐way 
may cause a developer to delay an opening   Is the land use proposed to change  information may be useful if you end up 
date for a commercial/retail project and  in the plan?    recommending road or intersection 
may affect your analysis data, but we’ll get   What is the current and proposed  widening as part of your traffic study.   
to that later.   zoning of the parcel?       
     What is the land use and zoning of  Lastly, if your study area is served by bus 
Many government agencies around the  the adjacent parcels?  WalmartTM,  or rail transit service go to the transit 
country charge traffic impact fees for new  for one, likes to have this  operator’s website to get routes and 
developments.  These fees are charged for  background information in their  schedules.  You may need to account for 
future transportation improvements and  traffic studies.  transit operations in your capacity 
are typically assessed based on a      analyses. 
proportion of traffic the development will  Now it’s time to move up the chain of   
generate compared to the total traffic on  government agencies to the county and  Existing Conditions from 
the facility.  Traffic impact fees are not  eventually the state.  The state will 
allowed in Minnesota, but they’re widely  definitely have some jurisdiction over your  Aerials 
used in states such as Florida and  traffic study, if one of the site’s driveways  As part of your online research, we also 
California.    is proposed on one of their roads.  As you  recommend you start with your favorite 
  did at the city; look for:  aerial online site or software, such as 
You may need to devote a whole section of   Traffic study policies  MapQuestTM, Google EarthTM, BingTM or 
your study to calculating impact fees.  Each   Traffic study standards  Google Street View.  Draw a quick and 
 
 
www.SpackAcademy.com      11 
Traffic Study Manual – Spack & Ficek 
     
dirty sketch of each study intersection  Field Visit  add the following details to them while 
based on the aerial with the following  You may be asking yourself why you even  you’re in the field: 
details:  need to go out in the field when   Transit stops  
 Exclusive left or right turn lanes ‐  everything is right there on the aerial.    Traffic signal operations 
measure their storage lengths on  First, because the aerials aren’t always  (protected left turn 
the aerial and include them on the  right.  Imagine the disaster if he had  phasing is shown on 
sketch  turned in a whole traffic study based on  the left, protected/ 
 Through lanes and/or shared lanes  the obsolete road network.  The study  permitted left turn 
if turn lanes aren’t provided  would have had zero credibility.  In reality,  phasing is shown on 
 Traffic control ‐ stop signs, traffic  the data collection staff would have caught  the right) 
signals or roundabouts  this, but it would have caused confusion   No turn on red restrictions 
 Medians  and some delay to the project.   Parking restrictions 
 Shoulders   Speed limits 
 Sidewalks/trails/paths  Mike worked on a church project in a   Non‐ADA compliant signal push‐
 On‐street bike lanes  quickly growing suburb.  He arrived in  buttons or pedestrian ramps  
 Nearby parking lots  the field and realized one of the study   Excessive grades or slopes (that 
 On‐street parking  intersections didn’t even exist.  Also,  either affect traffic operations or 
 Street names  there were two new intersections he  making widening a road difficult) 
    didn’t know existed.  The roads in the   Excessive grades that may affect 
Also, print out a street map of the study  study area were rebuilt during the  traffic (for instance, if you’re 
area.  We like to make field notes on maps.   summer and the aerials weren’t up to  working in Duluth, Minnesota 
Ensure the map is zoomed in enough so  date.  He had to adjust the data  where steep hills get iced over in 
you can make notes of things between  collection plan to account for reality.    the winter) 
your study intersections.  We find we’re   Objects or buildings on the 
more accurate correcting our sketches in    intersection corners that block sight 
the field than trying to create originals  The second reason to go out to the site is  lines 
while we’re on the side of the road.   there are frequently many important   
Something usually gets missed if we skip  details you can’t always see on an aerial.   While you’re at the site, take plenty of 
this first task in the office.  In addition to verifying the information on  pictures.  Smart phones are a convenient 
  your hand sketches is correct, you should  and amazing tool for this task because they 
produce really good photos.  Get one 
 
 
www.SpackAcademy.com      12 
Traffic Study Manual – Spack & Ficek 
     
photo of each approach at each study  area during rush hour.  We like to go   Large parking lots that could affect 
intersection.  Be certain to keep a log of  through our hand sketches after lunch and  the balance of traffic between study 
the photos so you can identify them back  then drive around the road network during  intersections 
in the office.  Taking pictures has saved us  the evening rush hour.     Large pedestrian generators, such 
more than one field visit.  It’s amazing how  as schools 
often one little detail is usually missed  Bryant recently started using an   Road construction 
while you’re doing your field check, but  intriguing alternative ‐ a dashboard   Developments under construction 
photos won’t help you find that detail if  camera to take video logs.  It’s a   
you can’t identify their location.  camera you mount on your  During rush hour, we examine the study 
  windshield and along with the video,  area for some of the following issues: 
An even better on‐site option would be a  it uses GPS to record your position   Do shoulders get used by cars as 
video camera recording both the study site  with speed and coordinates.  You  separate right turn lanes or bypass 
and your dictation simultaneously.  You  download the recorded file from a  lanes? 
have less organizing to do if you go with  removable SD Memory Card and the   Do the traffic signals along a 
video.    software interface shows your video  corridor seem to be coordinated, so 
  next to a GoogleTM map tracking the  through traffic moves down the 
You should keep in mind that video is  corresponding car location.    corridor smoothly? 
always recording sounds, so please watch     What are the signal cycle lengths?  
the language.  We had two interns  A cheaper option is the app Ubipix,  Bring a stopwatch or use your 
collecting video by a Midwest university  which provides the same functionality  phone to spot check the time it 
campus on one of the first nice days of the  via your smart phone.  You’ll want to  takes for the signal timing to rotate 
spring and there were several  buy a mounting bracket for your  all the way through its cycle.  Be 
inappropriate comments about the coeds  phone if you go that route, but the  sure to measure several cycles as 
caught on the audio.  Do feel free to sing  bracket is $20 compared to the $200  they can vary. 
along with your favorite Elton John song  cost of a dash cam.     Are there any queues backing up 
though.  Your boss should find that  from turn lanes into the through 
 
amusing.  lane or do queues extend back from 
While you’re verifying the accuracy of the 
  one intersection blocking the 
hand sketches, be aware of other things 
In addition to documenting the existing  upstream intersection? 
that could affect traffic in your study area, 
conditions of the environment, you should   Is it hard to turn onto a major street 
such as: 
observe how traffic operates in your study  from a cross street with a stop sign? 
 
 
www.SpackAcademy.com      13 
Traffic Study Manual – Spack & Ficek 
     
 Do the routes cars will take to get to  further explain how we incorporated those  The quality control process in our office is 
and from your site correspond to  observations in our analysis.    as follows: 
the major traffic flow you’re    1. The technician draws the sketch 
watching?  Ideally, the field visit should occur before  based on the aerials.   
  your traffic counts are taken. As we  2. He verifies and corrects the 
These firsthand observations could save  mentioned earlier, details from an aerial  information during a field visit. 
your reputation in a public hearing.   can be wrong. The field visit will help you  3. He verifies locations for the traffic 
Citizens regularly grill us about how traffic  figure out if the data collection plan needs  counters to park. 
currently operates at a specific  to change as well as to determine good  4. The engineer completes a final 
intersection.  If we’ve been on‐site during  parking spots for your data collectors.  verification of the sketches while 
rush hour, we can honestly respond that    he’s out observing rush hour 
we went out during rush hour and  The field visit is ultimately part of your  traffic.  
observed the traffic patterns.  We can  quality control process to ensure the   
details in your traffic study are correct.      

 
 
www.SpackAcademy.com      14 
Traffic Study Manual – Spack & Ficek 
     
Checklist:  Document Existing Conditions  
1. Use online mapping tools to document the physical details of each study intersection.  The following are items to note: 
a. Exclusive left or right turn lanes ‐ measure their  k. Confirm the above details during a field visit.  
storage lengths on the aerial and include them on  Following are items to also note: 
the sketch  l. Transit stops 
b. Through lanes and/or shared lanes if turn lanes  m. Traffic signal operations, including left turn phasing 
aren’t provided  n. No turn on red restrictions 
c. Traffic control ‐ stop signs, traffic signals or  o. Parking restrictions 
roundabouts  p. Speed limits 
d. Medians  q. Non‐ADA compliant signal push‐buttons or 
e. Shoulders  pedestrian ramps  
f. Sidewalks/trails/paths  r. Excessive grades or slopes  
g. On‐street bike lanes  s. Excessive grades that may affect traffic  
h. Nearby parking lots  t. Objects or buildings on the intersection corners that 
i. On‐street parking  block sight lines 
j. Street names 
2. Collect photos or videos of your study area. 
3. If a technician prepares sketches with the above items, do your own field verification.  While you perform your own field visit, 
also be aware of items that could affect traffic in your study area: 
a. Large parking lots that could affect the balance of traffic between study intersections 
b. Large pedestrian generators, such as schools 
c. Road construction 
4. Developments under construction 
5. During rush hour, analyze the following items: 
a. Do shoulders get used by cars as separate right turn lanes or bypass lanes? 
b. Do the traffic signals along a corridor seem to be coordinated, so through traffic moves down the corridor smoothly? 
c. What are the signal cycle lengths?   
d. Are there any queues backing up from turn lanes into the through lane or do queues extend back from one intersection 
blocking the upstream intersection? 
e. Is it hard to turn onto a major street from a cross street with a stop sign? 
f. Do the routes cars will take to get to and from your site correspond to the major traffic flow you’re watching?
 
 
www.SpackAcademy.com      15 
Visit SpackAcademy.com to order a
complete copy of the Traffic Study Manual.

Das könnte Ihnen auch gefallen