LIST OF DRAWING AND DOCUMENTS FOR REFRACTORY LINING JOB OF OHCU - REACTOR FEED HEATER 91

F-01/FRACTIONATOR HEATER 91-F-02 (EPCC-1) - IOCL, HALDIA.

Client : Punj Lloyd Ltd.

End User : Indian Oil Corporation Ltd. Haldia.

Project : OHCU UNIT Haldia Refinery -Reactor Feed Heater 91-F-01/Fractionator Heater 91-F-02 (EPCC-1)

Title : LIST OF DRAWINGS & DOCUMENTS FOR REFRACTORY LINING.

CIRIA JOB NO. : 236

Date : 04.03.2009

REACTOR FEED HEATER 91-F-01/FRACTIONATOR HEATER 91-F-02

DWG. NO. REV SIZE DESCRIPTION


REMARKS
CIRIA

DRAWINGS

REFRACTORY LINING OF INSTALLATION & STORAGE


10144-PEIN04-EPCC1-91-F-01& 02 -236-3048 0 A4
INSTRUCTIONS

10144-PEIN04-EPCC1-91-F-01& 02 -236-3049 0 A4 DRY OUT PROCEDURE FOR REFRACTORY LINED HEATER

QUALITY ASSURANCE PLAN / ACCEPTANCE CRITERIA FOR


10144-PEIN04-EPCC1-91-F-01& 02 -236-3050 0 A4
CASTABLE

QUALITY ASSURANCE PLAN / ACCEPTANCE CRITERIA FOR C.F.


10144-PEIN04-EPCC1-91-F-01& 02 -236-3051 1 A1
BLANKET

QUALITY ASSURANCE PLAN / ACCEPTANCE CRITERIA FOR


10144-PEIN04-EPCC1-91-F-01& 02 -236-3052 1 A1
ANCHORS

QUALITY ASSURANCE PLAN / ACCEPTANCE CRITERIA FOR S.S.


10144-PEIN04-EPCC1-91-F-01& 02 -236-3053 1 A1
FOIL

QUALITY ASSURANCE PLAN / ACCEPTANCE CRITERIA FOR


10144-PEIN04-EPCC1-91-F-01& 02 -236-3054 1 A1
BRICKS